HomeMy WebLinkAboutCertification Letter.pdfHUBER TECHNOLOGY — MANUFACTURING EXPANSION & Charlotte - Downtown PASSIVATION PLANT 704.334.7925 704.334.7926 SAND FILTER — ENGINEERS CERTIFICATION STEWART $TROLAGER BY DE$IGN REPORT NUMBER: 1 STEWART PROJ. NUMBER: C22007.00 DATE: 12.20.2023 PROJECT NAME: Manufacturing Expansion & Passivation CLIENT: HUBER TECHNOLOGY CONTRACTOR: EDIFICE INSPECTOR: Riyad Baroudi PURPOSE: Sand Filter Close-out CONTACT: Cody Herbert 101 N. Tryon Street Suite 1400 Charlotte, NC 28202 After careful review of the sand filter as built on the Huber Technology's property, I certify that the sand filter stormwater BMP is constructed to the standards set forth in the North Carolina Department of Environmental Quality (NCDEQ) BMP manual and complies with the Minimum Design Criteria set forth by NCDEQ. I have listed my exceptions to my approval below: • The contractor is working on establishing permanent stabilization on the top of the pond. Hydro -seed was applied to the bmp top of berm prior to inspection but was washed out by a rain event shortly thereafter. • Contractor shall stabilize the floor of the sedimentation chamber with grass. Please see images from my inspection in the attachments. Thanks, Riyad Baroudi PE ��� pl �aRo I'�f - ��4pF SEAL 049484 fiNG96 1 N6 40 SARo�°,•� 11111f11 WWW.STEWARTINC.COM CHARLOTTE / DURHAM / RALEIGH / WILMINGTON / COLUMBIA,SC HUBER TECHNOLOGY — MANUFACTURING EXPANSION & PASSIVATION PLANT SAND FILTER — ENGINEERS CERTIFICATION STEWART $TROLAGER 6Y DE$IGN GENERAL PHOTOS: Stabilization in process. Charlotte - Downtown 101 N. Tryon Street 704.334.7925 Suite 1400 704.334.7926 Charlotte, NC 28202 Slope stabilization in process. Hydroseed failed due to rain event. Re -apply Hydroseed. WWW.STEWARTINC.COM CHARLOTTE / DURHAM / RALEIGH / WILMINGTON / COLUMBIA,SC HUBER TECHNOLOGY — MANUFACTURING EXPANSION & PASSIVATION PLANT SAND FILTER — ENGINEERS CERTIFICATION STEWART STRONGER 6Y DE$IGN Charlotte - Downtown 101 N. Tryon Street 704.334.7925 Suite 1400 704.334.7926 Charlotte, NC 28202 Slope stabilization in process. Hydroseed failed due to rain event. Re -apply Hydroseed. ON, Stone/sand surface with underdrain cleanouts. i Y._y. .: _ .... ry:.•..e _ .. v=fit;,::_4--...}'.-.: Am WWW.STEWARTINC.COM CHARLOTTE / DURHAM / RALEIGH / WILMINGTON / COLUMBIA,SC HUBER TECHNOLOGY — MANUFACTURING EXPANSION & Charlotte - Downtown 101 N. Tryon Street PASSIVATION PLANT 704.334.7925 Suite 1400 704.334.7926 Charlotte, NC 28202 SAND FILTER — ENGINEERS CERTIFICATION STEWART STRONGER 6Y DE$IGN apply Hydroseed. Cleanouts, rip -rap berm, sedimentation chamber. Stabilize sedimentation chamber with grass. WWW.STEWARTINC.COM CHARLOTTE / DURHAM / RALEIGH / WILMINGTON / COLUMBIA,SC HUBER TECHNOLOGY - MANUFACTURING EXPANSION & PASSIVATION PLANT SAND FILTER - ENGINEERS CERTIFICATION STEWART STRONGER 6Y DE$IGN Outside of outlet control structure. Inside of outlet control structure. .4 +4i, t Charlotte - Downtown 101 N. Tryon Street 704.334.7925 Suite 1400 704.334.7926 Charlotte, NC 28202 WWW.STEWARTINC.COM CHARLOTTE / DURHAM / RALEIGH / WILMINGTON / COLUMBIA,SC HUBER TECHNOLOGY - MANUFACTURING EXPANSION & PASSIVATION PLANT SAND FILTER - ENGINEERS CERTIFICATION STEWART STRONGER 6Y DE$IGN Inside outlet control structure, looking at outlet pipe. Charlotte - Downtown 101 N. Tryon Street 704.334.7925 Suite 1400 704.334.7926 Charlotte, NC 28202 WWW.STEWARTINC.COM CHARLOTTE / DURHAM / RALEIGH / WILMINGTON / COLUMBIA,SC HUBER TECHNOLOGY - MANUFACTURING EXPANSION & PASSIVATION PLANT SAND FILTER - ENGINEERS CERTIFICATION I a STEWART $TROLAGER 6Y DE$IGN Sand Filter Rip -rap lined emergency spillway. Charlotte - Downtown 101 N. Tryon Street T 704.334.7925 Suite 1400 F 704.334.7926 Charlotte, NC 28202 WWW.STEWARTINC.COM CHARLOTTE / DURHAM / RALEIGH / WILMINGTON / COLUMBIA,SC 77� . . . . . . . . . . . . o�*,A HUBER TECHNOLOGY — MANUFACTURING EXPANSION & PASSIVATION PLANT SAND FILTER — ENGINEERS CERTIFICATION ■ STEWART $TROLAGER 6Y DE$IGN Rip -rap apron inlet pipe. Charlotte - Downtown 101 N. Tryon Street 704.334.7925 Suite 1400 704.334.7926 Charlotte, NC 28202 WWW.STEWARTINC.COM CHARLOTTE / DURHAM / RALEIGH / WILMINGTON / COLUMBIA,SC 6S Post De Draina lopment Area 2 Sand Filter Subcat Reach on Link 2023.12.19 - C22007 Huber Technology - Asbuilt Prepared by Stewart, Inc Printed 12/20/2023 HydroCAD® 10.20-4a s/n 09358 © 2023 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-inch Charlotte 6-hr 1-inch Default 6.00 1 1.00 2 2 100-yr Charlotte 6-hr 100-yr Default 6.00 1 5.34 2 2023.12.19 - C22007 Huber Technology - Asbuilt Prepared by Stewart, Inc Printed 12/20/2023 HydroCAD® 10.20-4a s/n 09358 © 2023 HydroCAD Software Solutions LLC Page 3 Area Listing (selected nodes) Area CN Description (acres) (subcatchment-numbers) 2.350 69 50-75% Grass cover, Fair, HSG B (6S) 5.980 98 Paved parking, HSG B (6S) 2023.12.19 - C22007 Huber Technology - Asbuilt Prepared by Stewart, Inc Printed 12/20/2023 HydroCAD® 10.20-4a s/n 09358 © 2023 HydroCAD Software Solutions LLC Page 4 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 8.330 HSG B 6S 0.000 HSG C 0.000 HSG D 0.000 Other 2023.12.19 - C22007 Huber Technology - Asbuilt Prepared by Stewart, Inc Printed 12/20/2023 HydroCAD® 10.20-4a s/n 09358 © 2023 HydroCAD Software Solutions LLC Page 5 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 2.350 0.000 0.000 0.000 2.350 50-75% Grass cover, Fair 6S 0.000 5.980 0.000 0.000 0.000 5.980 Paved parking 6S 2023.12.19 - C22007 Huber Technology - Asbuilt Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by Stewart, Inc Printed 12/20/2023 HydroCADO 10.20-4a s/n 09358 © 2023 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 6S: Post Development Drainage Area 2 Runoff = 6.93 cfs @ 3.10 hrs, Volume= 0.222 af, Depth= 0.32" Routed to Pond 7P : Sand Filter Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-10.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description 5.980 98 Paved parking, HSG B 2.350 69 50-75% Grass cover, Fair, HSG B 8.330 90 Weighted Average 2.350 28.21 % Pervious Area 5.980 71.79% Impervious Area Subcatchment 6S: Post Development Drainage Area 2 Hydrograph ❑ Runoff 6.93 cfs Charlotte 6-hr 1-finch 6 1 1 1 Rainfal4=111.00" Runoff Area =-8 3310 ac 5 Runoff Volume=0.222 of 4 1 Runoff Depth=0.32" U. — 1— Tc=O.01I -min 3 CIS=90 2 1 1 1 1 1 1 I I 0 0 1 2 3 4 5 6 7 8 9 10 Time (hours) 2023.12.19 - C22007 Huber Technology - Asbuilt Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by Stewart, Inc Printed 12/20/2023 HydroCAD® 10.20-4a s/n 09358 © 2023 HydroCAD Software Solutions LLC Page 7 Summary for Pond 7P: Sand Filter Inflow Area = 8.330 ac, 71.79% Impervious, Inflow Depth = 0.32" for 1-inch event Inflow = 6.93 cfs @ 3.10 hrs, Volume= 0.222 of Outflow = 0.17 cfs @ 5.95 hrs, Volume= 0.095 af, Atten= 98%, Lag= 171.3 min Primary = 0.17 cfs @ 5.95 hrs, Volume= 0.095 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-10.00 hrs, dt= 0.05 hrs Peak Elev= 770.44' @ 5.95 hrs Surf.Area= 6,741 sf Storage= 7,934 cf Plug -Flow detention time= 208.1 min calculated for 0.095 of (43% of inflow) Center -of -Mass det. time= 175.2 min ( 392.2 - 217.0 ) Volume Invert Avail.Storage Storage Description #1 769.00' 39,347 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 769.00 3,903 0 0 770.00 6,281 5,092 5,092 771.00 7,336 6,809 11,901 772.00 8,553 7,945 19,845 773.00 9,725 9,139 28,984 774.00 11,000 10,363 39,347 Device Routing Invert Outlet Devices #1 Primary 766.22' 36.0" Round Culvert L= 66.6' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 766.22' / 761.96' S= 0.0640'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 769.00' Special & User -Defined Head (feet) 0.00 1.00 2.00 3.00 Disch. (cfs) 0.000 0.153 0.197 0.241 #3 Device 1 771.98' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 773.26' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.17 cfs @ 5.95 hrs HW=770.44' (Free Discharge) L1=Culvert (Passes 0.17 cfs of 56.10 cfs potential flow) L2=Special & User -Defined (Custom Controls 0.17 cfs) 3=Orifice/G rate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=769.00' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2023.12.19 - C22007 Huber Technology - Asbuilt Charlotte 6-hr 1-inch Rainfall=1.00" Prepared by Stewart, Inc Printed 12/20/2023 HydroCADO 10.20-4a s/n 09358 © 2023 HydroCAD Software Solutions LLC Page 8 Pond 7P: Sand Filter Hydrograph I I 7 , --7--7- 6 , 5 i L L 4 i _o / LL III 3 i 2 1 0 1 2 3 ■ Inflow —— —————————— ■Outflow 0 Prima Inflow Al�rea4336 ac ■ Se ondary Peak'IElevi=7701.44' - - r - - rStofage�,934 cf ----++ I I I I ------------ I I I I I I I I I I I I I ;CAMP 4 5 6 7 8 9 10 Time (hours) 2023.12.19 - C22007 Huber Technology - Asbuilt Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by Stewart, Inc Printed 12/20/2023 HydroCAD® 10.20-4a s/n 09358 ©2023 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 6S: Post Development Drainage Area 2 Runoff = 70.09 cfs @ 3.08 hrs, Volume= 2.919 af, Depth= 4.20" Routed to Pond 7P : Sand Filter Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-10.00 hrs, dt= 0.05 hrs Charlotte 6-hr 100-yr Rainfall=5.34" Area (ac) CN Description 5.980 98 Paved parking, HSG B 2.350 69 50-75% Grass cover, Fair, HSG B 8.330 90 Weighted Average 2.350 28.21 % Pervious Area 5.980 71.79% Impervious Area Subcatchment 6S: Post Development Drainage Area 2 75 — — — — — 70 — — — — — 1 65 60 55 50— w 45 40 — — — — — — LL 35 I— --�---I 30 — — — — — I— — 25I- 20 10 Hydrograph I - Charlotte 6-hr 100 y-r ---11--- 1 Raipfal=0-3-4" Runoff Areal=8.330 ac - - -I- - - T - - - I — — — r - - - - - - F - - - - -1- - - - Ru-n-off Volume=2.919-a# - - - - --1-Runpff Dgpth=,�20" - — — — — - — — — — — — — — — — — — — — Tc=0.01 min --- G"- 0 —-1— —-1———L——-1———L—— T- — — 0 1 2 3 4 5 6 7 8 9 10 Time (hours) ■ Runoff 2023.12.19 - C22007 Huber Technology - Asbuilt Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by Stewart, Inc Printed 12/20/2023 HydroCAD® 10.20-4a s/n 09358 © 2023 HydroCAD Software Solutions LLC Page 10 Summary for Pond 7P: Sand Filter Inflow Area = 8.330 ac, 71.79% Impervious, Inflow Depth = 4.20" for 100-yr event Inflow = 70.09 cfs @ 3.08 hrs, Volume= 2.919 of Outflow = 64.85 cfs @ 3.11 hrs, Volume= 2.538 af, Atten= 7%, Lag= 1.5 min Primary = 64.85 cfs @ 3.11 hrs, Volume= 2.538 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-10.00 hrs, dt= 0.05 hrs Peak Elev= 773.13' @ 3.11 hrs Surf.Area= 9,892 sf Storage= 30,269 cf Plug -Flow detention time= 34.4 min calculated for 2.525 of (87% of inflow) Center -of -Mass det. time= 21.5 min ( 220.5 - 199.0 ) Volume Invert Avail.Storage Storage Description #1 769.00' 39,347 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 769.00 3,903 0 0 770.00 6,281 5,092 5,092 771.00 7,336 6,809 11,901 772.00 8,553 7,945 19,845 773.00 9,725 9,139 28,984 774.00 11,000 10,363 39,347 Device Routing Invert Outlet Devices #1 Primary 766.22' 36.0" Round Culvert L= 66.6' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 766.22' / 761.96' S= 0.0640'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 7.07 sf #2 Device 1 769.00' Special & User -Defined Head (feet) 0.00 1.00 2.00 3.00 Disch. (cfs) 0.000 0.153 0.197 0.241 #3 Device 1 771.98' 48.0" x 48.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 773.26' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=63.87 cfs @ 3.11 hrs HW=773.12' (Free Discharge) L1=Culvert (Passes 63.87 cfs of 79.09 cfs potential flow) L2=Special & User -Defined (Custom Controls 0.24 cfs) 3=Orifice/G rate (Weir Controls 63.63 cfs @ 3.49 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=769.00' (Free Discharge) L4= Broad -Crested Rectangular Weir( Controls 0.00 cfs) 2023.12.19 - C22007 Huber Technology - Asbuilt Charlotte 6-hr 100-yr Rainfall=5.34" Prepared by Stewart, Inc Printed 12/20/2023 HydroCAD® 10.20-4a s/n 09358 ©2023 HydroCAD Software Solutions LLC Page 11 Pond 7P: Sand Filter Hydrograph 70.09 cfs I I I I 4nflow Are"- 336 ac 75 70: / / / / / 64.85 cfs — — — 64.85 cfs r T 7C' � � T 65 / / / ----+--+--StOTAge=307,269Cf 60 /' / / — — — 4- — — + — — + — — — -4 — — 55 / / — — 4- — — — — — — — — 4 — — -4 — — 50 // —— 1 L—-1—-1—-1——-i—— w 45 /'/ —— ———————— —— —— 40 o35 / / '//1 ' —— —— —— —— —— —— —— -—— —— —— —— —— u 30 / /I — — - — — — — — — 25 20 / — — - — — — — — — 15 10 1 2 3 4 5 6 7 Time (hours) LInflow wrydary