HomeMy WebLinkAbout20110089 Ver 8_Stormwater Info_20231220Baker, Caroline D
From: Riyad Baroudi <rbaroudi@stewartinc.com>
Sent: Wednesday, December 20, 2023 2:58 PM
To: Mcdaniel, Chonticha
Cc: Cody Herbert; Anwar Issa; Paul Garafola
Subject: [External] Huber Technology - Manufacturing Expansion and Passivation - Sand Filter
BMP Certification
Attachments: 2023.12.19 - Stormwater Asbuilts.pdf, Certification Letter.pdf, 0904ASB_Pond_
12.13.23.dwg
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Good afternoon! I hope you are doing well. I have attached my letter of certification for the sand filter bmp for the
Huber Technology project in Lincoln County NC. They are working on final stabilization (hydroseed washed out over
weekend rain event and never established). Otherwise the pond is built per construction documents and comply with
NCDEQ MDC. The attached report will confirm that the pond is built satisfactory.
Please let me know if there is anything else you will need from me to close out this permit and I will provide it right
away.
Thank you so much,
Riyad Baroudi, PE
Project Manager
Civil Engineering
STEWART
STRONGER BY DESIGN
Connect with us. We value your feedback.
Direct 704.909.3543
Office 704.334.7925
Visit us at www.stewartinc.com