Loading...
HomeMy WebLinkAbout20110089 Ver 8_Stormwater Info_20231220Baker, Caroline D From: Riyad Baroudi <rbaroudi@stewartinc.com> Sent: Wednesday, December 20, 2023 2:58 PM To: Mcdaniel, Chonticha Cc: Cody Herbert; Anwar Issa; Paul Garafola Subject: [External] Huber Technology - Manufacturing Expansion and Passivation - Sand Filter BMP Certification Attachments: 2023.12.19 - Stormwater Asbuilts.pdf, Certification Letter.pdf, 0904ASB_Pond_ 12.13.23.dwg CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon! I hope you are doing well. I have attached my letter of certification for the sand filter bmp for the Huber Technology project in Lincoln County NC. They are working on final stabilization (hydroseed washed out over weekend rain event and never established). Otherwise the pond is built per construction documents and comply with NCDEQ MDC. The attached report will confirm that the pond is built satisfactory. Please let me know if there is anything else you will need from me to close out this permit and I will provide it right away. Thank you so much, Riyad Baroudi, PE Project Manager Civil Engineering STEWART STRONGER BY DESIGN Connect with us. We value your feedback. Direct 704.909.3543 Office 704.334.7925 Visit us at www.stewartinc.com