HomeMy WebLinkAboutNCC211376_MODIFICATION Supporting Doc (LOTS 124-130)_20240426 +A N N Planning & Development Department
1*
William Jason Guess
PEOPLE TO MATCH Erosion Control Officer
OUR MOUNTAINS
LETTER OF APPROVAL
April 23, 2024 NOTICE— This is not a permit
D.R. Horton, Inc.
Debra Green
80 Peachtree Road, Suite 200
Asheville, NC 28803
RE: Project Name:THE VILLAGES AT BRADLEY BRANCH-PHASE 4C
Acres Approved: 1.0 AC
Project#: ER02024-00016
County: BUNCOMBE
City: ASHEVILLE
Address: JACA LANE
River Basin: FRENCH BROAD
Stream Classification: C
Submitted By: DEBRA GREEN
Date Received by: APRIL 15, 2024
Plan Type: RESIDENTIAL
Dear Sir/Madam,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. This approval shall
become null and void if you have not made progress on the site within six months after
the date of approval. A one-time six-month extension can be granted for good cause
shown upon receiving a written request from you before the expiration of the approved
plan. This letter of approval is being issued prior to the issuance of the
stormwater permit due to concurrent reviews, but any land disturbing activity associated
with this project shall not begin prior to issuance off all required permits including the
stormwater permit and the land disturbing permit
+A N N Planning & Development Department
1*
William Jason Guess
PEOPLE TO MATCH Erosion Control Officer
OUR MOUNTAINS
"As of April 1, 2019, all new construction activities are required to complete and submit
an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC)
under the NCGO 10000 Construction General Permit. After the form is reviewed and found
to be complete, you will receive a link with payment instructions for the applicable annual
permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this
project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form and fee details may be accessed atdeg.nc.gov/NCGOI. Please
direct questions about the eNOI form to the Stormwater Program staff in the Raleigh
central office. If the owner/operator of this project changes in the future, the new
responsible party must obtain a new COC.:"
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does not
supersede any other permit or approval.
+A N N Planning & Development Department
1*
William Jason Guess
PEOPLE TO MATCH Erosion Control Officer
OUR MOUNTAINS
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition,
it would be helpful if you notified this office of the proposed starting date for this project.
Please notify us when you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
�. - aC . W"
W. Jason Guess
Erosion Control Officer
Enclosures: NPDES NCGO1 Fact Sheet
Cc: