Loading...
HomeMy WebLinkAboutB-5372 Revsied Cover Letter PCN Attachment PackageSTATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR April 29, 2024 U. S. Army Corps of Engineers Charlotte Regulatory Field Office 8430 University Executive Park Dr, Suite 615 Charlotte, NC 28262 ATTN: Mr. Steve Brumagin, NCDOT Coordinator J.R. "JOEY" HOPKINS SECRETARY NC Division of Water Resources Transportation Permitting Branch 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Ms. Beth Plummer, NCDOT Coordinator Subject: Application for Section 404 Nationwide Permit 14, and Section 401 Water Quality Certification for the Proposed Replacement of Bridge No. 109 on SR 1706 (Martin Luther King Jr. Avenue) over US 29 (N. Cannon Blvd.) in Cabarrus County, Division 10, TIP No. B-5372, Debit $767 from WBS 46087.1.1. Dear Sir and Madam: The North Carolina Department of Transportation (NCDOT) proposes to replace bridge no. 109 on SR 1706 (Martin Luther King Jr. Avenue) over US 29 (N. Cannon Blvd.) in Cabarrus County. The new bridge will include two 12-foot travel lanes and 7-foot paved offsets, or "shoulders", on each side to accommodate bicycles. The roadway grade of the new structure will be approximately two feet higher than the existing structure to allow for the proper vertical roadway clearance over U.S. 29. The new bridge will be constructed on existing location, with traffic being detoured off -site during construction. The existing entrance and exit ramps will remain open to local business traffic during construction. The Federal Highway Administration is the lead federal agency for this project. Impact Summary As a result of the proposed project, there will be a total of 235 linear feet of permanent stream impacts due to culvert replacement and stream channel relocation, and 24 linear feet (0.003 ac) of temporary stream impacts due to construction access for stream channel relocation efforts. There are no wetland impacts associated with this project. In addition to the below -referenced documents, please find enclosed Pre -Construction Notification (PCN), Stormwater Management Plan, and Permit Drawings. A copy of this permit application will be posted on the NCDOT Website at: http://connect.ncdot.gov/resources/Environmental. If you have any questions or need additional information, please contact Rob Crowther at recrowther@ncdot.gov or (919) 707-6112. Mailing Address: Location: NC DEPARTMENT OF TRANSPORTATION Telephone: (919) 707-6000 1000 BIRCH RIDGE DRIVE ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH NC 27610 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 Website: www.ncdot.gov Attachments: • NCDMS Mitigation Acceptance Letter • USFWS ESA Section 7 Informal Concurrence Letter • No Archaeological Survey Required Form • Historic Architecture and Landscapes No Survey Required Form • Tribal Coordination Correspondence (Catawba Nation) • Type II(A) Categorical Exclusion Action Classification Form (Signed 10/05/2022) Sincerely, Michael A. Turchy Environmental Coordination and Permitting Group Leader ec: NCDOT Permit Application Standard Distribution List Mitigation ROY COOPER Governor ELIZABETH S. BISER Secretary MARC RECKTENWALD Director Mr. Jamie Lancaster, P.E. Environmental Analysis Unit North Carolina Department of Transportation Mail Service Center 1598 Raleigh, North Carolina 27699-1598 Dear Mr. Lancaster: NORTH CAROLINA Environmental Quality February 16, 2024 Subject: Mitigation Acceptance Letter: TIP B-5372, Replace Bridge 120109 over US 29 (North Cannon Boulevard) on SR 1706 (Martin Luther King Jr. Avenue), Cabarrus County The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the mitigation for the subject project. Based on the information supplied by you on February 15, 2024, the impacts are located in CU 03040105 of the Yadkin River basin as follows: Stream and Wetlands River Basin Cu Location Eco- Region g Stream Wetlands Cold Cool Warm Riparian Non- Coastal Riparian Marsh Impacts Yadkin 03040105 SP 0 0 235.000 0 0 0 *Some of the impacts may be proposed to be mitigated at various ratios. See permit application for details. DMS will provide the amount of stream and wetland mitigation included in the environmental permits. DMS commits to implementing sufficient mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In -Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from NCDEQ-DMS. If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420. Sincerely, Elizabe7A. Harmon DMS NCDOT ILF Coordinator cc: Mr. Monte Matthews, USACE — Raleigh Regulatory Field Office Ms. Amy Chapman, NCDWR Mr. Brad Chilton, NCDOT File: B-5372 AEQNorth Carolina Department of Environmental Quality I Division of Mitigation Services ®Jl� 217 West Jones Street 1 1652 Mail Service Center I Raleigh, North Carolina 27699-1652 NUIi I H li�fi0.1NA 0"p "m&Emirtomental�uaiHy\ r 919.707,8976 Permit Drawings I l ghway Stormwater (Version 3.00; Released August 2021) North Carolina Department of Transportation 1 Highway Stormwater Program 64 STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS WBS Element: 46087.1.1 TIP/Prof No: B-5372 County(ies): Cabarrus Page 1 of 3 General Project Information WBS Element: 46087.1.1 ITIP Number: B-5372 I Project Type: I Bridge Replacement I Date: 2/9/2024 NCDOT Contact: David Stuffs, PE Contractor / Designer: Jon Ford, PE Address: 1000 Birch Ridge Drive Raleigh, NC 27610 Address: 2550 West Tyvola Road Suite 120 Charlotte, NC 28217 Phone: 919-707-6442 Phone: 704-357-0488 Email: dstuffsna ncdot.gov Email: icford(a)'mt.com City/Town: Kannapolis County(ies): Cabarrus River Basin(s): Yadkin -Pee Dee CAMA County? No Wetlands within Project Limits? No Project Description Project Length (lin. miles or feet): 885 feet Surrounding Land Use: ISuburban Proposed Project Existing Site Project Built -Upon Area (ac.) 0.2 lac. 1.7 lac. Typical Cross Section Description: 2-lane road to bridge with sidewalks over 4-1ane divided highway 2-lane road with 5' bike lanes and curb and gutter to bridge over 4-1ane divided highway Annual Avg Daily Traffic (veh/hr/day): I Design/Future: 5600 1 Year: 2040 I Existing:1 3,520 1 Yearl 2020 General Project Narrative: (Description of Minimization of Water Quality Impacts) B-5372 involves replacing bridge number 109 on SR-1706 (Martin Luther King Jr Ave) in Kannapolis, NC. The existing road and bridge is a 2-lane road without curb and gutter. The proposed typical section is a 2-lane road with curb and gutter and sidewalks before and after the bridge. The improvements will include the installation of a surface drainage network that will outfall into the jursidictional stream on site. Rip rad pads will be installed at pipe outlets across the project to reduce flow velocities and erosivity. The existing 66" RCP culvert for the unamed tributary to Cold Water Creek will be removed and replaced with a 72" welded steel culvert, the channel will be shifted to align with the new culvert. Highway North Carolina Department of Transportation btormwater <.,_.., Highway Stormwater Program �= STORMWATER MANAGEMENT PLAN _ (Version 3.00; Released August 2021) FOR NCDOT PROJECTS WBS Element: 46087.1.1 TIP/Prof No.: B-5372 County(ies): Cabarrus Page 2 of 3 General Project Information Waterbody Information Surface Water Body 1 : UT to Cold Water Creek NCDWR Stream Index No.: 13-17-9-4-2- 1 NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV (WS-IV) Supplemental Classification: None Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: SA Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I Surface Water Body 2 : 1 UT to Cold Water Creek NCDWR Stream Index No.: 13-17-9-4-2- 1 NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV (WS-IV) Supplemental Classification: None Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: SB Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? I N/A Deck Drains Discharge Over Water Body? N/A I (If yes, provide justification in the General Project Narrative) I (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Body (3): 1 UT to Cold Water Creek NCDWR Stream Index No.: 13-17-9-4-2- 1 NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV (WS-IV) Supplemental Classification: None Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: SC Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? I N/A Deck Drains Discharge Over Water Body? N/A I (If yes, provide justification in the General Project Narrative) I (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) High IWateY StOYwaIYy (Version 3.00; Released August 2021) North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS WBS Element: 46087.1.1 TIP No.: B-5372 County(ies): Cabarrus Page 3 of 3 Additional Waterbody Information Surface Water Body (4): UT to Cold Water Creek NCDWR Stream Index No.: 13-17-9-4-2-(1) NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV WS-IV Supplemental Classification: None Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: SD Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? I N/A Dissipator Pads Provided in Buffer? I N/A Deck Drains Discharge Over Water Body? N/A I (If yes, provide justification in the General Project Narrative) I (If yes, describe in the General Project Narrative; if no, General Project Narrative) justify in the (If yes, provide justification in the General Project Narrative) C L T �N Ln 'n � o' m U. v� N o� N � mod. N� 200 J ne 1008 �P 200 215 yCanno io High ch of I& ch of 1706 E ick Scho 0 2154 BEGIN PROTECT,,, a Ba / K NN4-p'bLI IOv 4� �04 K nnapo 's mmum 194 ap ol'�hmrh VICINITY MAP (N.T.S.) OFF -SITE DETOUR STATE OF NORTH CAROLINS �SyIT 1Tfiy j�P�CRO�53 RRP7RR(R�N�R NQ �QT DIVISION OF HIGHWAYS TR PRO.NO P.APRDI.NO. DRPCR PT DN 46087.1.1 P.E. 46087.2.1 ROW CABARRUS COUNTY L LOCATION: BRIDGE NO.109 ON SR 1706 (MLK JR. AVE) OVER US 29 TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT =O THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARY OF KANNAPOLIS THIS PROJECT IS PARTIAL ACCESS CONTROL. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2020 = 3,520 ADT 2040 = 5,600 K = 11% D = 55% T = 5% V = 40 MPH * TTST =1% DUAL =4% FUNC CLASS = MINOR COLLECTOR SUB —REGIONAL TIER PROJECT LENGTH LENGTH ROADWAY TIP PROJECT B-5372 = 0.133 MILES LENGTH STRUCTURE TIP PROJECT B-5372 = 0.035 MILES TOTAL LENGTH TIP PROJECT B-5372 = 0.168 MILES _ Johnson, Mirmiran, & Thompson Inc. JFBI Charllot No G28217 ola Road, Suite 120, 3097 2024 STANDARD SPECIFICATIONS REECE M. SCHULER, P.E, P.L. RIGHT OF WAY DATE: PROJECT ENGINEER APRIL 26, 2024 JON FORD, P.E. PROJECT DESIGN ENGINEER LETTING DATE: DAVID STUTTS, P.E. NOVEMBER 29, 2024 NCDOT CONTACT PERMIT DRAWING SHEET 1 OF 7 .OJECT B-5372 . 25 + 85.00 HYDRAULICS ENGINEER P.E. IRE: ROADWAY DESIGN ENGINEER P.E. Z O w o, DENOTFS IMPACTS IN SURFACE SURFACE WATER ENOCTESIMPAS ITESUR FA R WATER WETLAND & STREAM IMPACTS o V o TEMPORARY IMPACTS IN $URFACE`WATER _ F \ I - � I I N IMPACTS IN SURFACE WATER \\ I F - ANN(SgeCHANNEL RELOCATION) \ \ e I1 SEE ETAIL 4 \ SITE 1 25 S D IMPACTS IN SURFACE WATE� I \\ \ (72" WELDED STEEL CULVERT) II �a \ \\\ EST 2 RIP TONSP �E ADETAIIT 2H \ \ EST 7 SYGF i II I I \ RAP EST 2 TONS T CL B RIP RAP DAVID H. \ SPECIAL CUT DITCH BAN ENT / I z SEE DETAIL 1 D AIL 3 EST 7 SYGF ��� �� / I - w D/E \ Fl DHM HOLDIt \ ` - G E L 2Ulm / i \ ip O� W D S REMbW W v i �� FkisT�� ---1 t A FYPE vs � WOODS �\ T �� WOODS o \\ \ \ \ \ S Fl C�/ P e 0. IMPACTS IN SURFAC AT \ SITE (72 WELDED STEEL CU R SD ----__ _ F - \\ \ z\ \ \ IMPACTS IN SURFACE\ WATER \ \ \ F CHANNEL CHANGE (STREAM_ CHANNEL RELOCATIO o �� \\ SEE DETAIL 5 3 \ G E F �\ NQ \ \ \ \ \ \\ �' TEMPORA Y IMPACTS / IN SURFACE WATER Ni v *�' 25' 0' 25' 50' 75' oE• L �a GRAPHIC SCALE m� N PROJECT REFERENCE NO. = SHEET NO. B-5372 I 5A PW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Onk PERMIT DRAWING SHEET 4 OF 7 DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER WETLAND & STREAM IMPACTS PROJECT REFERENCE NO. SHEET NO. B-5372 5B PW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER O� , Z PERMIT DRAWING SHEET 5 OF 7 25' 0' 25' 50' 75' GRAPHIC SCALE ..................................................................................................................... ......................................................................................................................ROADWAY ...................................................................................................................... ......................................................................................................................ENGINEER ENGINEER ...................................................................................................................... ...................................................................................................................... ...................................................................................................................... ....................................................................................................................... ........................................................................................................................ ........................................................................................................................ .........................................................................................■.............................. ........................................................................................................................ .........................................................................................■.............................. ........................................................................................................................ ........................................................................................................................ .........................................................................................■.............................. ........................................................................................................................ ........................................................................................................................ PERMIT DRAWING ........................................................................................................................ SHEET 6 OF 7 ........................................................................................................................ ........................................................................................................................ ........................................................................................................................ ........................................................................................................................ ........................................................................................................................ HUM. M ................................................................................................................................ ...................................................................................................................................................... ...................................................................................................................................................... ...................................................................................................................................................... ...................................................................................................................................................... ...................................................................................................................................................... .......................................................................................................................■.............................. ...................................................................................................................................................... ...................................................................................................................................................... - ...................................................................................................................................................... ...................................................................................................................................................... ...................................................................................................................................................... ...................................................................................................................................................... MOMEMEMMEMEMMEMEM...................................................................................................................................................... ...................................................................................................................................................... ................................................................................ ................................................................................ .................................................■.............................I :::::::::::::::::::::::::::::::............................. 0:.................. .................................................■.............................. ................................................................................ .................................................■.............................. :::::::::::::::::::::::::::::::::::: .................................................■.............................. ................................................................................ .................................................■.............................I :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::................... WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Stream Name Stream ID Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 UT to Cold Water Creek -Y- 18+73 to 19+17 LT Replacement 72" Welded Steel Culvert, New Headwall 45 ft Upstream 0.009 45 1 UT to Cold Water Creek -Y- 17+76 to 18+73 LT Stream Channel Relocation, Inlet Channel Change 0.017 0.002 85 12 2 UT to Cold Water Creek -Y- 20+77 to 21+22 LT Replacement 72" Welded Steel Culvert, New Outlet 53 ft Downstream 0.009 50 2 UT to Cold Water Creek -Y- 21+22 to 21+71 LT Stream Channel Relocation, Outlet Channel Change 0.014 0.001 55 12 TOTALS`: 0.05 < 0.01 235 24 *Rounded totals are sum of actual impacts NOTES: *1: Emedding Riprap *2: No Riprap in Channel 2018 Feb Protected Species/ Section 7 QPP�MENT OF Tye, FIS SERVICE L 2_J3 United States Department of the Interior o 9 ' FISH AND WILDLIFE SERVICE �9RCH 3 aA Asheville Field Office oF' 160 Zillicoa Street Suite B Asheville, North Carolina 28801 April 11, 2024 Robert Crowther Environmental and Permitting Group, Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699 Subject: Informal Conference for Replacement of Bridge 109 over US 29 on SR 1706 in Cabarrus County (TIP No. B-5372, Service Log #24-198) Dear Robert Crowther: On February 14, 2024, we received your request to initiate informal conference procedures for effects the subject project may have on federally proposed species. We have reviewed the information you submitted, and the following is provided in accordance with the provisions of the National Environmental Policy Act (42 U.S.C.§ 4321 et seq.); the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661 - 667e); and section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 - 1543) (Act). Proiect Description According to the information provided, the North Carolina Department of Transportation (NCDOT) proposes to replace Bridge 109 over US 29 on SR 1706 in Cabarrus County. The existing bridge is a four -span structure with concrete deck, end walls, and guard rails. The overall length of the existing bridge is approximately 190 feet. One culvert meeting NCDOT's Standard Operating Procedures for Preliminary Bat Habitat Assessments was identified meeting the criteria of greater than 3 feet wide and 60 feet in length during this site visit. This culvert is a 66-inch reinforced concrete pipe that currently carries an unnamed tributary to Cold Water Creek. Percussive activities could include but are not limited to; pile driving, guardrail installation, pneumatic chipping, hydromulching, pavers, drill rigs, cranes, pumps, generators, compressors, concrete trucks, ground compactors, rollers, and concrete vibrators. Tree clearing surrounding the bridge location is expected. The project is scheduled to Let in October of 2024. The Federal Highway Administration (FHWA) is the federal lead for this project for section 7 purposes, with authority delegated to NCDOT. NCDOT has agreed to implement the following conservation measures for the project: 1. Tree clearing will take place from October 16 to March 31. 2. Bridge demolition will occur outside of the bat active season. 3. Should night work occur during the bat active season (April 1-October 15), temporary lighting will only be used to illuminate work areas and will avoid lighting the surrounding landscape. 4. No additional permanent lighting will be added to the roadway. 5. No blasting will occur. Federally Listed Species The information provided indicates that a "No Effect" (NE) determination has been made for Schweinitz's sunflower (Helianthus schweinitzii) and that a determination for Michaux sumac (Rhus michauxii) is "unresolved". In instances of suitable habitat being absent from the action area, we would agree that NE determinations are appropriate. In instances where suitable habitat is present and botanical surveys conducted during the optimal survey window and within the past 1 or 2 years (depending on the species) have negative results, we would concur with a biological determination of "may affect, not likely to adversely affect" (NLAA). This information is provided for the sake of the administrative record. The correspondence received from NCDOT requests a conference for the tricolored bat (Perimyotis subflavus) and little brown bat (Myotis lucifugus). A suitable bridge roost, culvert, and suitable commuting and foraging habitat for tricolored bat occur within the action area. The bridge and culvert have not been surveyed for bats. The proposed conservation measures minimize effects to bats potentially occurring within the action area. However, effects from construction noise to unknown tree roosts within the action area but outside the construction limits, while minimized, are not avoided. Bats that are present in proximity to transportation corridors are expected to be tolerant of baseline noise and vibration levels (or have already modified their behaviors to avoid them). How temporary increases in noise and vibration from construction activities effect bats within existing transportation corridors has not been well studied to our knowledge, though one study found that bats habituated rapidly to traffic noise (Luo et al. 2014). Given the information available and conservation measures above, we do not believe any response to project noise and vibration by bats that are already tree -roosting in the area is expected to rise to the level of harm (as defined at 50 CFR 17.3). On September 14, 2022, the U.S. Fish and Wildlife Service (Service) published a proposal in the Federal Register to list the tricolored bat as endangered under the Act. As a result, NCDOT has requested a conference for the tricolored bat as the project may be on -going after the effective date of any final listing rule, if one is published. Little brown bat is considered an at -risk species. At -risk species are not legally protected under the Act and are not subject to any of its provisions, including section 7, unless they are formally proposed or listed as endangered or threatened. While lead federal agencies are not prohibited from jeopardizing the continued existence of an at -risk species unless the species becomes listed, the prohibition against jeopardy and taking a listed species under section 9 of the Act applies as soon as a listing becomes effective, regardless of the stage of completion of the proposed action. USACE has requested a conference for the little brown bat, as the project may be on -going after a potential proposal for listing and effective date of any final listing rule, if one is published. Based on the information provided, the noted bat inactive season during which the project will occur, the analysis above, and the commitments to minimize project impacts, we have determined that the proposed project will not jeopardize the continued existence of the tricolored bat or little brown bat. Additionally, we would concur with the NCDOT's determination that the project is NLAA the tricolored bat and the little brown bat should the species become listed. Conservation Recommendations Conservation recommendations are discretionary agency activities to minimize or avoid adverse effects of a proposed action on listed species or critical habitat, to help implement recovery plans, or to develop information. General recommendations for the benefit of fish and wildlife resources are provided here: • Structure Surveys: Survey the bridge and culvert structures within 14 days of project work, regardless of season, to ensure absence of roosting bats. Contact the Service immediately if bats are observed. • Riparian Replanting: Because the removal of forested riparian habitat can affect the quality and suitability of foraging and commuting habitat for bats and the water quality for aquatic organisms, we recommend replanting the riparian zone with native, fast-growing trees and shrubs that would serve to stabilize the stream bank, filter runoff and reduce erosion and sedimentation, block light pollution, and generally improve the quality of the habitat for bats and aquatic species. 2 Examples of potential native tree species to plant include: Sycamore, tulip poplar, black cherry and river birch. Planting with established (e.g. containerized) young trees can increase the survival rate of plantings and contribute to faster improvement of riparian habitat. Noise Considerations for Bats: If suitable roost trees are present near high -decibel activity (81 — 162 dBA) and would experience noise above background levels (41 — 70 dBA), avoid conducting those high -decibel activities during the bat maternity and pup season (May 15 — August 15). To minimize noise levels, incorporate sound -dampening devices such as noise shrouds for pile driving. Reinitiation Notice We believe the requirements under section 7 of the Act are fulfilled for the federally listed species discussed above. However, obligations under section 7 must be reconsidered if. (1) new information reveals impacts of this proposed action may affect listed species or critical habitat in a manner not previously considered, (2) this proposed action is subsequently modified in a manner that was not considered in this review, or (3) a new species is listed, or critical habitat is determined that may be affected by the proposed action. We appreciate the opportunity to provide these comments. Please contact Ms. Holland Youngman of our staff at hollandyouungman@fws.gov if you have any questions. In any future correspondence concerning this project, please reference our Service Log #24-198. Sincerely, - - original signed - - Janet Mizzi Field Supervisor Archaeology Project Tracking No.: 15-02-0043 Revised NO ARCHAEOLOGICAL SURVEY REQUIRED FORM This form only pertains to ARCHAEOLOGICAL RESOURCES for this project. It is notes valid for Historic Architecture and Landscapes. You must consult separately with the Historic Architecture and Landscapes Group. PROJECT INFORMATION Project No: B-5372 County: Cabarrus WBS No: 46087.1.1 Document: CE F.A. No: na Funding: ® State ❑ Federal Federal Permit Required? ® Yes ❑ No Permit Type: USACE Project Description: The project calls for the replacement of Bridge No. 109 on SR 1706 (East 1st Street) over US 29 in Cabarrus County. The archaeological Area of Potential Effects (APE) for the project is defined as an approximate 2, 900 foot (883.92 m) long corridor running along East I st Street. From the center of the bridge, the corridor extends approximately 2,200 feet (670.56 m) to the northwest and 700 feet (213.36 in) to the southeast. The corridor has a variable width of 200 feet (60.96 m) at its northwestern end and expands to 850 feet (259.08 m) towards the southeast. The APE includes all existing ramps and a portion of US 29 extending approximately 825 feet (251.46 m) to the north and 420 feet (128.02 m) to the south along US 29 from the bridge. In all, the APE encompasses approximately 32 acres, which will cover all ground disturbing activities. It is anticipated that this project will require federal permits. Therefore, the archaeological review of Bridge No. 109 was conducted pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance (36 CFR Part 800). SUMMARY OF CULTURAL RESOURCES REVIEW Brief description of review activities, results of review, and conclusions: Bridge No. 109 is located in Kannapolis and west of I-85 at the northern boundary of Cabarrus County, North Carolina. The project area is plotted in the northwest corner of the Concord USGS 7.5' topographic quadrangle (Figure 1). A map review and site file search were conducted at the Office of State Archaeology (OSA) on February 19, 2015 with a subsequent review on December 18, 2019 due to the project's resubmittal. No previously recorded archaeological sites have been identified within the APE or a mile of the bridge. According to the North Carolina State Historic Preservation Office online data base (HPOWEB 2015), the boundary for the Study Listed and Determined Eligible Kannapolis Mill Village (CA 264a) is just south of the archaeological APE. However, no surveyed or contributing archaeological resource falls within the APE. Topographic maps, USDA soil survey maps, aerial photographs (NC One Map), and historic maps (North Carolina maps website) were examined for information on environmental and cultural variables that may have contributed to prehistoric or historic settlement within the project limits and to assess the level of ground disturbance. Bridge No. 106 and East 1 st Street cross US 29 from the northwest to southeast. Unnamed tributaries to Cold Water Creek run alongside East 1 st Street to the north and south crossing under the road west of the bridge. These waterways are part of the Yadkin -Pee Dee drainage basin. The APE is situated mostly on ridges and side slope adjacent to the drainages, but the majority of the landforms has been modified "No ARCHAEOLOGY SURVEY REQUIRED " form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 1 of 5 Project Tracking No.: 15-02-0043 Revised (Figure 2). It is likely that some of the area was in floodplain prior to the construction of US 29 and the ramps. The channels for the tributaries have also been modified to improve drainage and prevent flooding. Although the APE is forested in places, it is characterized by urban development and residential properties. Overall, ground disturbance is very heavy. The USDA soil survey map suggests that the APE is composed of two soil types (see Figure 2). The Cecil -Urban land complex (CeB) covers most of the project area. These are mixed soils, where most of the natural soils have been altered or covered as the result of grading or digging. The series also contain households, pavement, and building complexes. It is very unlikely for intact deposits to be found in these altered soils. The second series, Cecil sandy clay loam (CcD2), is situated along the side slopes next to the tributaries. These are well drained but eroded soils with a slope of 8 to 15 percent. Due to soil erosion, it is unlikely for a significant site to be present. A review of the site files shows few archaeological surveys and no sites within a mile of the project area. Although the current APE has not been reviewed or included in any previous studies, nearly all properties surround the project have been reviewed and cleared by OSA as low potential due to disturbance. The current project area shares the same characteristics as these other reviewed properties. Lastly, a historic map review was conducted. Early and accurate historic maps of the project vicinity are rare. The 1910 soil map of Cabarrus County is the earliest map to depict the project area with any accuracy (Figure 3). This map shows no roads or structures in the vicinity of the current bridge. Likewise, subsequent early 20th century maps illustrate no additional features. As a result, it seems that no historic archaeological deposits should be affected by the proposed bridge replacement. Brief Explanation of why the available information provides a reliable basis for reasonably predicting that there are no unidentified historic properties in the APE: The defined archaeological APE for the proposed replacement of Bridge No. 109 over US 29 consists of heavily disturbed soils associated with past urban development and road construction. It is very unlikely intact and significant archaeological deposits will be encountered within the APE. In addition, OSA has cleared many neighboring properties with similar characteristics as low potential for significant sites. Lastly, the historic maps suggest that no former historic structures and/or features are in the area. As long as impacts to the subsurface occur within the defined APE, no further archaeological work is recommended for the replacement of Bridge No. 109 in Cabarrus County. If construction should affect subsurface areas beyond the defined APE, further archaeological consultation might be necessary. Please note, this project falls within a North Carolina County in which the Catawba Nation have expressed an interest. It is recommended that you contact each federal agency involved with this project to determine their Section 106 Tribal consultation requirements. SUPPORT DOCUMENTATION See attached: ® Map(s) ❑ Previous Survey Info ❑ Photocopy of County Survey Notes FINDING BY NCDOT ARCHAEOLOGIST NO ARCHAEOLOGY SUR VEY REQ UIRED 0 C. Damon Jones NCDOT ARCHAEOLOGIST II ® Photos ❑Correspondence Other: Images from historic maps 1 /2/20 Date `No ARCHAEOLOGY SURVEY REQUIRED " form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 2of5 Project Tracking No.: 15-02-0043 Revised A n Im pop MA u OWN b , n c.� :!,!P -,� w. g�g� G f 7 tii ter' v 1, 21"1 V J l +f 12 1 N 2.000 w E Cabarrus County Figure 1. Topographic Setting of the Project Area, Concord (1969; photorevised), Kannapolis (1993). Enochville (1993), and China Grove (1970; photorevised 1987), NC, USGS 7.5' Topographic Quadrangle. 'No ARCHAEOLOGY SURVEY REQUIRED "form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 3 of 5 144 Soils • u r at 20 feet Streams Z Lk Project Tracking No.: 15-02-0043 Revised Figure 3. The 1910 Soil Survey Map for Cabarrus County showing the location of the project area. `No ARCHAEOLOGY SURVEY REQUIRED " form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 5 of 5 Historic Architecture and Landscapes Aroject T racking No. (Internal Me) 20-01-0002 HISTORIC ARCHITECTURE AND LANDSCAPES . NO SURVEY REQUIRED FORM This form only pertains to Historic Architecture and Landscapes for this project. It is not valid for Archaeological Resources. You must consult separately with the Archaeology Group. PROJECT INFORMATION Project No: B-5372 County: Cabarrus WBS No.: 46087.1.1 Document Type: PCE or CE Fed. Aid No: N/A Funding: ❑ State X Federal Federal Permits : ❑ Yes ® No Permit T e s : NIA Project Descri ti2g: Replacement of Bridge No. 109 on SR 1706 (E. I" Street) over US 2$. SUMMARY OF HISTORIC ARCHITECTURE AND LANDSCAPES REVIEW Description of review activitiesresults, and conclusions: *Previously reviewed under 15-02-0043* Review of HPO quad maps, HPO GIS information, historic designations roster, and indexes was undertaken on January 7, 2020. Based on this review, there are no existing NR, SL, LD, DE, or SS properties in the Area of Potential Effects, which is defined on the fallowing maps. All properties over fifty years of age within the APE were visually inspected, and no properties warrant further evaluation. The Study Area borders the Determined Eligible/Study Listed Kannapolis Mill Village Historic District: Black Section (CA0264A), however the district will not be affected by this project and does not fall within the APE. Bridge No. 109 is not eligible for NR listing. There are no National Register listed or eligible properties. if design plans change, additional review will be required. Why the available information Provides a reliable basis for reasonably predictinA, that there are no unidentified significant historic architectural or landscape resources in the project area: HPO quad maps and GIS information recording NR, SL, LD, DE, and SS properties for the Cabarrus County survey and Google Maps are considered valid for the purposes of determining the likelihood of historic resources being present. There are no National Register listed or eligible properties within the APE and no survey is required. SUPPORT DOCUMENTATION ❑Map(s) ❑Previous Survey lit[o. ❑Photos ❑Correspondence []Design Plans FINDING BY NCDOT ARCHITECTURAL HISTORIAN Historic Architecture and Landscapes --NO SURVEY REQUIRED NCDOT Architectural Historian Date W Historic Arcllifecfrireand Lamiscapes NO SURVEY RF.Q(11R&D form for Minor T ramporfafion ?mjeas as QAuhfred in the 10071'rogrommaric Agreemen7. Page 1 of 2 W, g al W ti III 029 Proposed Project > K a fin itji4ts Kannapois 2" ARR Cv nt Cano Conc ord .40 Smilh st 0 5,000 10,000 20,000 0111 0 Feet � VICINITY MAP IN County: CABARRUSI 14ORTH CAROLINA DEPARTMENT BRIDGE REPLACEMENT Figure OF TRANSPORTATION BRIDGE NO 109 OVER Div: ID I TIP# B-5372 DIVISION OF HIGHWAYS PROJECT DEVELOPMENTAND US 29 ON SR 1706 VVBS: 46087.1.1 ENVIRONMENTAL ANALYSIS UNIT CABARRUS COUNTY Date: JA= TIP PROJECT B-5372 � a u u :e o ircyy � a c ontl 4ir+}J a tFsa4 � onV 41n� nnV ''74rry N J� b IS+l179 q` m v u 4�r = 9t dn,rr++ 51 H Y 4 za a�b rArrrr�W �" n i _a y a +[] Poorr`n V+l z — a r rCnollwaod OS •� w P e'J ead �•19 a aRV 4fro� ]ro-� W tiw w QAV rrr�yy7u� N rS uu,UFJ 5` a a �1oc 16� ! 0 4j� H4 r, x n o HPD G1S. National Register LISTED properties outlined in blue. There are no rational Register listed properties within the APE, defined in red. Hisroric Archireclure and Lawhmpec No Sr1R VEY RliQUIP 'D form for Minor 7iausporrarrwi !'rujeclx ax aa!lfred in rlie 2IH77 YroKramrrrailc Agrereirrir_ Page 2 of 2 Tribal Coordination Catawba Indian Nation Tribal Historic Preservation Office 1536 Tom Steven Road Rock Hill, South Carolina 29730 Office 803-328-2427 Fax 803-328-5791 January 31, 2020 Attention: David Stutts NC Department of Transportation 1581 Mail Service Center Raleigh, NC 27699 Re. THPO # Project # Project Description 2020-193-116 B-5372 Replacement of Bridge No. 109 on SR 1706 (East First St.) over US 29 in Cabarrus County Dear Mr. Stutts, The Catawba have no immediate concerns with regard to traditional cultural properties, sacred sites or Native American archaeological sites within the boundaries of the proposed project areas. However, the Catawba are to be notified if Native American artifacts and / or human remains are located during the ground disturbance phase of this project. If you have questions please contact Caitlin Rogers at 803-328-2427 ext. 226, or e-mail caitlinh@ccpperafts.com. Sincerely, Wenonah G. Haire Tribal Historic Preservation Officer NEPA/SEPA Document DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 Type I or II Categorical Exclusion Action Classification Form TIP Project No. WBS Element Federal Project No. A. Project Description: B-5372 46087.1.1 N/A The proposed project involves replacing Bridge No. 109 on S.R. 1706 (Martin Luther King Jr. Avenue) over U.S. 29 (N. Cannon Blvd) in Cabarrus County. It will also add curb and gutter and sidewalks along both sides of U.S. 29. Bridge No. 109 is 190 feet long and the replacement structure will be a bridge approximately 175 feet long, providing a minimum 49-foot clear deck width. The new bridge will include two 12-foot travel lanes and 7-foot paved offsets, or "shoulders", on each side to accommodate bicycles. 5-foot 6-inch sidewalks and a 54-inch two bar metal rail will be provided on both sides of the bridge. The roadway grade of the new structure will be approximately two feet higher than the existing structure to allow for the proper vertical roadway clearance over U.S. 29. Along S.R. 1706, the roadway approaches will extend approximately 265 feet from the west end of the new bridge and 433 feet from the east end of the new bridge. The approaches will be widened to provide two 12-foot travel lanes, 7-foot bicycle lanes, 5-foot 6-inch sidewalks, and 10-foot grassed shoulders on both sides. Along U.S. 29 (under the bridge), improvements will extend approximately 330 feet north of S.R. 1706 and 230 feet south of S.R. 1706. Improvements include upgrading U.S. 29 to a curb and gutter section, with 5- foot paved offsets, and 5-foot sidewalks along each side of U.S. 29. The new bridge will be constructed on existing location, with traffic being detoured off site during construction. However, the existing entrance and exit ramps will remain open to local and business traffic during construction (see Figure 1). S.R. 1706 will be designed as a Minor Collector and U.S. 29 will be designed as an Urban Collector, both utilizing Sub -Regional Tier Guidelines with a 40 mile per hour design speed. B. Description of Need and Purpose: The purpose of the proposed project is to replace a structurally deficient bridge. NCDOT Bridge Management Unit records indicate Bridge No. 109 is considered structurally deficient due to a deck condition and superstructure condition appraisal of 4 out of 9 according to Federal Highway Administration standards. C. Categorical Exclusion Action Classification: Type I(A) - Ground Disturbing Action D. Proposed Improvements: 28. Bridge rehabilitation, reconstruction, or replacement or the construction of grade separation to replace existing at -grade railroad crossings if the actions meet the constraints in 23 CFR 771.117(e)(1-6). v2019.1 B-5372 Type I(A) CE Page 1 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 E. Special Project Information: Estimated Traffic: Current Year (2020) 3,520 vpd Future Year (2040) 5,600 vpd TTST 1% Dual 4% Alternatives Evaluation: No Build — The no build alternative would result in eventually closing the road, which is unacceptable given the volume of traffic served by S.R. 1706. Rehabilitation — The existing bridge was constructed in 1953 and is reaching the end of its useful life. Rehabilitation would only provide a temporary solution to the structural deficiency of the bridge. Remove Bridge No. 109, Replace with At -Grade Signalized Intersection - Offsite Detour — A Planning -Level Study was performed by NCDOT Congestion Management, in which the results of this study showed that replacing the existing bridge with a signalized at -grade intersection would be a viable option. A detailed traffic analysis confirmed these findings. In addition, by replacing the bridge with an at -grade intersection, the cost of replacing and maintaining the bridge would be saved. Bridge No. 109 would be removed, and a new at -grade signalized intersection would be installed just north of the existing bridge. During the construction period, the existing ramps and the existing bridge would remain open to local and business traffic. However, as a result of comments received from the public and further coordination with the City of Kannapolis, this alternative was not selected. Staged Construction — Staged construction was not considered because of the availability of an acceptable offsite detour. Replace Bridge No. 109 In -Place with a New Bridge — Offsite Detour (Recommended) — Bridge No. 109 will be replaced on its existing alignment. Traffic will be detoured offsite (see Figure 1) during the construction period. NCDOT Guidelines for Evaluation of Offsite Detours for Bridge Replacement Projects considers multiple project variables beginning with the additional time traveled by the average road user resulting from the offsite detour. The offsite detour for this project would include S.R. 1706, N. Main Street, Jackson Park Road, and Little Texas Road. The majority of traffic on S.R. 1706 is through traffic. The existing ramps would remain open to local and business traffic during construction. The detour for the average road user would result in 4 minutes of additional travel time (2 miles of additional travel). Up to a 12-month duration of construction is expected on this project. Based on the Offsite Detour Guidelines, the criteria above indicate that, on the basis of delay alone, the proposed offsite detour is acceptable. Cabarrus County Emergency Services has indicated that the detour is acceptable. NCDOT Division 10 has indicated the condition of all roads, bridges and intersections on the offsite detour are acceptable without improvement and concurs with the use of the detour, as identified in Figure 1. Pedestrian and Bicycle Accommodations: The existing bridge is within an established residential area with pedestrian and bicycle trip generators, including schools, churches and commercial establishments in close proximity. The Kannapolis Bicycle Plan indicates that S.R. 1706 carries the Central/East Bike Route. The current bridge includes sidewalks. The City of Kannapolis requested that striped bike lanes and sidewalks be included on both sides of S.R. 1706 within the construction limits for this project. In addition, the City of Kannapolis requested that curb and gutter, wide outside shoulders, and sidewalks be included v2019.1 B-5372 Type I(A) CE Page 2 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 along U.S. 29. These bicycle and pedestrian accommodations have been incorporated into the designs. Construction of sidewalks is contingent upon the completion of a cost -sharing municipal agreement between the City of Kannapolis and NCDOT. Estimated Costs: The proposed project is included in the NCDOT State Bridge Program. Right of way acquisition and construction are scheduled for Fiscal Year (FY) 2022 and FY 2023, respectively. Current cost estimates, based on 2022 prices, are as follows: Right of Way: $ 9,600 Utilities: $ 125,000 Construction: $ 5,324,500 Total: $ 5,459,100 Design Exceptions: There are no anticipated design exceptions. Public Involvement: STIP Project B-5372 was originally scoped as a bridge replacement project. However, in early 2018, NCDOT Congestion Management did a high-level traffic capacity analysis and determined that replacing the existing bridge with an at -grade intersection was a viable, cost -saving alternative to replacing the bridge. Based on this capacity analysis, NCDOT changed the scope of the original B-5372 project from a bridge replacement to a conversion of the interchange to an at -grade signalized intersection. On November 15, 2018, a Local Officials Meeting and Public Meeting was held. The meetings were held at the Faith Baptist Church in Kannapolis, NC. The Local Officials Meeting was held from 3:00pm until 4:00pm, and the public meeting was held from 5:00pm until 7:00pm. Six local officials were in attendance at the Local Officials Meeting. Approximately nine persons signed in to the informal "open house" public meeting. Written comments were submitted by 11 people at the meeting and during the comment period. The majority of the comments received were related to concerns with removing the bridge, and the assumption that additional traffic may occur with a new signalized intersection in this area. Based on input received during and after the public meeting, the City of Kannapolis requested that the scope return to its original concept of replacing Bridge No. 109 with a new bridge on existing location. To announce this change of scope back to a bridge replacement, a newsletter was developed and mailed out to the public. This newsletter provided updated project information including updated design data, project schedule, project decisions, and graphics. The newsletter was mailed out on July 21, 2022. No comments have been received to date. Threatened and Endangered Species As of August 22, 2022, the United States Fish and Wildlife Service (USFWS) lists two federally protected species for Cabarrus County (Northern long-eared bat [NLEB] and Schweinitz's sunflower). Norther long-eared bat (NLEB) - Habitat for NLEB is present within the project study area. According to the North Carolina Natural Heritage (NHP) Biotics Database, most recently updated July 2021, the nearest NLEB hibernacula record is approximately 79 miles west of the project and no known NLEB roost trees occur within 150 feet of the project area. NCDOT has also reviewed the Asheville Field Office website (http://www.fws.gov/asheville/htmis/project_review/NLEB_in_WNC.html) for consistency with NHP records. This project is located entirely outside of the red highlighted areas (12 digit HUC) that the USFWS Asheville Field Office has determined to be representative of an area that may require consultation. The closest 12 digit (030501010502) red HUC is approximately 74.5 miles to the west (Upper Wilson Creek) in Avery County.A Section 7 Survey for NLEB was conducted on August 10, 2021. Bridge No. 109 was assessed for potential NLEB habitat. Some crevices suitable for roosting were present on the structures, but no evidence (bats, staining, and guano) of bats was observed. Based on the lack of evidence of bats using the bridge, and no known roost trees within 150 feet of the project area, NCDOT recommends a Biological Conclusion of May Affect Not Likely To Adversely Affect for the v2019.1 B-5372 Type I(A) CE Page 3 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 northern long-eared bat. Final design, tree clearing, and percussive activities information will be provided in the permit application. Schweinitz's sunflower (Helianthus schweinitzii) — Habitat for Schweinitz's sunflower is present within the project study area. On October 18, 2021, a plant -by -plant survey for Schweinitz's sunflower was conducted within the project site. Marginally suitable habitat for Schweinitz's sunflower was present within the project site in areas with moderate disturbance regimes and little -to -no canopy cover. However, no individuals were present. Additionally, no typical associate species were identified. A review of the North Carolina Natural Heritage Program (NCNHP) October 2021 dataset revealed no known Schweinitz's sunflower occurrences within the study area or within one mile of the project site. Due to the negative survey results of this survey and the lack of known occurrences within one mile of the project, the Biological Conclusion rendered for the species is No Effect. Bald Eagle and Golden Eagle Protection Act - Habitat for the bald eagle primarily consists of mature forest in proximity to large bodies of open water for foraging. Large dominant trees are utilized for nesting sites, typically within 1.0 mile of open water. A desktop-GIS assessment of the project study area, as well as the area within a 1.13-mile radius (1.0 mile plus 660 feet) of the project limits, was performed on March 25, 2015 using 2014 color aerials. No water bodies large enough or sufficiently open to be considered potential feeding sources were identified. Since there was no foraging habitat within the review area, a survey of the project study area and the area within 660 feet of the project limits was not conducted. Additionally, a review of the NCNHP database on 25 March 2015 revealed no known occurrences of this species within 1.0 mile of the project study area. Due to the lack of habitat, known occurrences, and minimal impact anticipated for this project, it has been determined that this project will not affect this species. v2019.1 B-5372 Type I(A) CE Page 4 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 F. Project Impact Criteria Checklists: F2. Ground Disturbing Actions — Type I (Appendix A) & Type II (Appendix B) Proposed improvement(s) that fit Type I Actions (NCDOT-FHWA CE Programmatic Agreement, Appendix A) including 2, 3, 6, 7, 9, 12, 18, 21, 22 (ground disturbing), 23, 24, 25, 26, 27, 28, &/or 30; &/or Type II Actions (NCDOT-FHWA CE Programmatic Agreement, Appendix B) answer the project impact threshold questions (below) and questions 8 — 31. • If any question 1-7 is checked "Yes" then NCDOT certification for FHWA approval is required. • If any question 8-31 is checked "Yes" then additional information will be required for those questions in Section G. PROJECT IMPACT THRESHOLDS Yes No (FHWA signature required if any of the questions 1-7 are marked "Yes".) 1 Does the project require formal consultation with U.S. Fish and Wildlife Service ❑ R1 (USFWS) or National Marine Fisheries Service (NMFS)? 2 Does the project result in impacts subject to the conditions of the Bald and Golden ❑ R1 Eagle Protection Act (BGEPA)? 3 Does the project generate substantial controversy or public opposition, for any ❑ R1 reason, following appropriate public involvement? 4 Does the project cause disproportionately high and adverse impacts relative to low- ❑ R1 income and/or minority populations? 5 Does the project involve a residential or commercial displacement, or a substantial ❑ R1 amount of right of way acquisition? 6 Does the project require an Individual Section 4(f) approval? ❑ 2 Does the project include adverse effects that cannot be resolved with a 7 Memorandum of Agreement (MOA) under Section 106 of the National Historic ❑ R1 Preservation Act (NHPA) or have an adverse effect on a National Historic Landmark (NHL)? If any question 8-31 is checked "Yes" then additional information will be required for those questions in Section G. Other Considerations Yes No 8 Is an Endangered Species Act (ESA) determination unresolved or is the project ❑ R1 covered by a Programmatic Agreement under Section 7? 9 Is the project located in anadromous fish spawning waters? ❑ [1 Does the project impact waters classified as Outstanding Resource Water (ORW), 10 High Quality Water (HQW), Water Supply Watershed Critical Areas, 303(d) listed ❑ [1 impaired water bodies, buffer rules, or Submerged Aquatic Vegetation (SAV)? 11 Does the project impact Waters of the United States in any of the designated ❑ R1 mountain trout streams? 12 Does the project require a U.S. Army Corps of Engineers (USACE) Individual ❑ 0 Section 404 Permit? 13 Will the project require an easement from a Federal Energy Regulatory ❑ u Commission FERC licensed facility? v2019.1 B-5372 Type I(A) CE Page 5 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 Other Considerations for Type I and II Ground Disturbing Actions (continued) Yes No Does the project include a Section 106 of the National Historic Preservation Act 14 (NHPA) effects determination other than a No Effect, including archaeological ❑ [� remains? 15 Does the project involve GeoEnvironmental Sites of Concerns such as gas ❑ R1 stations, dry cleaners, landfills, etc.? Does the project require work encroaching and adversely affecting a regulatory 16 floodway or work affecting the base floodplain (100-year flood) elevations of a 2 ❑ water course or lake, pursuant to Executive Order 11988 and 23 CFR 650 subpart A? 17 Is the project in a Coastal Area Management Act (CAMA) county and substantially ❑ R1 affects the coastal zone and/or any Area of Environmental Concern (AEC)? 18 Does the project require a U.S. Coast Guard (USCG) permit? ❑ [1 19 Does the project involve construction activities in, across, or adjacent to a ❑ R1 designated Wild and Scenic River present within the project area? 20 Does the project involve Coastal Barrier Resources Act (CBRA) resources? ❑ 21 21 Does the project impact federal lands (e.g. U.S. Forest Service (USFS), USFWS, ❑ 2 etc.) or Tribal Lands? 22 Does the project involve any changes in access control or the modification or ❑ R1 construction of an interchange on an interstate? 23 Does the project have a permanent adverse effect on local traffic patterns or ❑ 2 community cohesiveness? 24 Will maintenance of traffic cause substantial disruption? ❑ [� 25 Is the project inconsistent with the STIP, and where applicable, the Metropolitan ❑ 2 Planning Or anization's MPO's Transportation Improvement Program (TIP)? Does the project require the acquisition of lands under the protection of Section 6(f) of the Land and Water Conservation Act, the Federal Aid in Fish Restoration Act, 26 the Federal Aid in Wildlife Restoration Act, Tennessee Valley Authority (TVA), ❑ u Tribal Lands, or other unique areas or special lands that were acquired in fee or easement with public -use money and have deed restrictions or covenants on the property? 27 Does the project involve Federal Emergency Management Agency (FEMA) buyout ❑ u properties under the Hazard Mitigation Grant Program HMGP ? 28 Does the project include a de minimis or programmatic Section 4(f)? ❑ 2 29 Is the project considered a Type I under the NCDOT Noise Policy? ❑ 2 30 Is there prime or important farmland soil impacted by this project as defined by the ❑ 2 Farmland Protection Policy Act FPPA ? 31 Are there other issues that arose during the project development process that ❑ affected the project decision? v2019.1 B-5372 Type I(A) CE Page 6 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 G. Additional Documentation as Required from Section F (ONLY for questions marked `Yes'): Response to Question 16 - Floodplain: This project involves construction activities on or adjacent to FEMA-regulated stream(s). Therefore, the Division shall submit sealed as -built construction plans to the Hydraulics Unit upon completion of project construction, certifying that the drainage structure(s) and roadway embankment that are located within the 100-year floodplain were built as shown in the construction plans, both horizontally and vertically. The NCDOT Hydraulics Unit will coordinate with the NC Floodplain Mapping Program (FMP), to determine status of the project with regard to applicability of NCDOT'S Memorandum of Agreement, or approval of a Conditional Letter of Map Revision (CLOMR) and subsequent final Letter of Map Revision (LOMR). v2019.1 B-5372 Type I(A) CE Page 7 Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 H. Project Commitments: NCDOT PROJECT COMMITMENTS TIP Project No. B-5372 Replace Bridge No. 109 in S.R. 1706 (Martin Luther King Jr. Ave Cabarrus County Federal Aid Project No. N/A WBS Element 46087.1.1 ) over U.S. 29 Continued Coordination and Outreach (NCDOT Division 10, NCDOT Structures Management Unit [SMU]) • In order to have time to adequately reroute school buses, Kannapolis City Schools will be contacted at (704) 938-4848 at least one month prior to road closure. • Kannapolis Fire and EMS departments will be contacted at (704) 920-4260 at least one month prior to road closure to make the necessary temporary reassignments to primary response units. • The Division will coordinate with the officials from the "Rider — Concord Kannapolis Area Transit" [(704) 920-7433] regarding temporary impacts to the "Blue Route" bus route and associated transit stops. • The A.L. Brown High School athletic director [(704) 932-6125] will be notified at least one month prior to the project construction. Sidewalks (Financial Management Division, Division 10 Construction, NCDOT SMU) • The City of Kannapolis has committed to cost share for the construction of sidewalks on the project. NCDOT-SMU and Division 10 will continue to coordinate with the City in the development of a municipal agreement. FEMA Floodplains and Floodways (Division 10 Construction, NCDOT SMU) • This project involves construction activities on or adjacent to FEMA-regulated stream(s). Therefore, the Division shall submit sealed as -built construction plans to the Hydraulics Unit upon completion of project construction, certifying that the drainage structure(s) and roadway embankment that are located within the 100-year floodplain were built as shown in the construction plans, both horizontally and vertically. Floodplain Mapping Coordination (NCDOT Hydraulic Design Unit) • The Hydraulics Unit will coordinate with the NC Floodplain Mapping Program (FMP), to determine status of project with regard to applicability of NCDOT'S Memorandum of Agreement, or approval of a Conditional Letter of Map Revision (CLOMR) and subsequent final Letter of Map Revision (LOMR). B-5372 — Categorical Exclusion Page 1 of 1 October 2022 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 I. Categorical Exclusion Approval: TIP Project No. WBS Element Federal Project No. Prepared By: 10/5/2022 Date Prepared For: Reviewed By: 10/5/2022 Date [1 Approved B-5372 46087.1.1 N/A —DocuSigned by: d Jac le bediente, PE Three Oaks Engineering North Carolina Department of Transportation —DocuSigned by: Jon amison NCDOT Environmental Policy Unit • If NO grey boxes are checked in Section F (pages 2 and 3), NCDOT approves the Type I or Type II Categorical Exclusion. • If ANY grey boxes are checked in Section F (pages 2 ❑ Certified and 3), NCDOT certifies the Type I or Type II Categorical Exclusion for FHWA approval. • If classified as Type III Categorical Exclusion. DocuSigned by: 10/5/2022 Date Kevin Ischer, PE, Asst. State Structures Engineer North Carolina Department of Transportation FHWA Approved: For Projects Certified by NCDOT (above), FHWA signature required. N/A Date for John F. Sullivan, 111, PE, Division Administrator Federal Highway Administration Note: Prior to ROW or Construction authorization, a consultation may be required (please see Section Vll of the NCDOT-FHWA CE Programmatic Agreement for more details). v2019.1 B-5372 Type I(A) CE Page 9 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 Legend w salh sr�L * Bridge 109 W S61h Sl E trih SS j Mary 5 F 14111 5l m Offsite Detour Cay sr �, ee=are5l 9• a v X-mluxi sly�9e park R6 P� p� Nr dnQefa l Ly.'. �m 4 a Q N L or•ugr �!! ? L rill, S! - 1f3H" �. N �ry3r N F'fY1ar aR7 A G � atrra,r sto 4y, .1. ° e c N far nia Sr F c .-ur EIrib $1 F C 94 d 81h Sr � y A E laln sr c3 3 $ n M m H J m � ° AoriNs! N Kamhl+n S� W lri S 8l m R yv 7rh St` v ° m �n 3 y er°aNtlare 3r = a .. . . - -• 1± Ffrelr°use Sl ' � e ` " ci°riwoo.� - — - — - c � WUadlawn S! � C°r1Sl o � �Kannapolis---`"— -__—___,�_ - --��K ?_-___.� R 0_W A N— C _p-U-N _T Y F'Jo CABARR.US CO `Y- p a a r = av real nr ` .p c Q v e •` dry r rirlll"ooa u, "] a m uer SI V Fa SI l=ry f2 �° ° ■ ..:an $l� Je amnl°lrnn 5! z o- n 9 as P�� r� nas'r = e y 29 ' t -". Hran r7vy R T ti �neH� jYq,! Willow[i,'_ "+ ❑eL6le5= d Ffan +a' { $r Se e5! r !.. C o F1vat} # l�l° C ve 7rLat eranrr°v Creek nr [inn AF nlY. } rf f10 u 6L t . �].,. _ yHanr.° Slu Q < Shepard sr 5arnan+na pr v N<0TH$R�� eellySrx 1 j'++•r sr F�kN'!:,!!. chla°la 5, I�•r i O 4 ¢ �R19 r w' �FSt " Q•° i vE tCSr � �9 t lF,P sfDy pl14, a° v �9` ..i �i .ter• TF v r°°�etan ar O EFsr r�,lcrryor, Cerlta rvinw• q` 29 sfy y�P°s a �d a. � � ,T �1 6 % i� yo rrpQ sae - � t v ,P, ac'° Proposed Project .T �° smllf sl �_ uw wn�Pr cefrrr s. '. � .. � ar er e BPry+ $Pry C c r7` i > Faily iew sf e!h trl v#P pa�P Rq, 3r 04 @fir afb Vim'$ s st t plym°, OabO �� I,l a4 M1 y 9L - �s Y If0i, +' i ❑` es 51 n - +rincr 5l 1 7� aN Qelanr S! AM Mrasrq,r a =� s 'tick Pro 51 w Calnwall5 cyst 3 Valwaod5 trakas F]uha qva a � 0 u Gt Ly11u �^, Ste a. + ryra s a �►Dr Fanraee St 4�6` garesrP fr a o-Ave 'fijrD Stds RdE i ya4 i aarn°lssl 5` yde yl a oc` ry Glass .v� s S1n ri A09'° a 74 4:,03 0 1,000 2,000 4,000 E,atwO° Feet Al lon : -!I,h SI 0� NORTH Cq VICINITY MAP County: CABA yaw 90. NORTH CAROLINA REPLACE BRIDGE NO. 109 N Div: 10 TIP# RRUS RRUS Figure DEPARTMENT ON SR 1706 OF TRANSPORTATION (MARTIN LUTHER KING JR BLVD) WBS: 46087.1.1 's? Q4e DIVISION OF HIGHWAYS OVER US 29. 4jFNrdF r8PN5QC CITY OF KANNAPOLIS Date: JULY 2022 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 ti H See Sheet l A For Index of Sheets 200 / Lane 1008 • 200 <� 2154`� yCanno io Highs ch Ol l Br w ch of 1706 X END PRO ECT Ln IST 2154 � oCl< SChO ra. BEGIN PROTECT q�e \� Ba d O- K N�Nt' • �� 104 K nnapo 's mmuni y Ba 1947 u apti -- h bol C ch VICINITY AAA P (N. T, S. OFF -SITE DETOUR REVISED 25% PLANS (DECEMBER 2020) THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARY OF KANNAPOLIS THIS PROJECT IS PARTIAL ACCESS CONTROL. STATE OF NORTH ,ROf,[C DIVISION OF HIGHWAYS CABARR US COUNTY LOCATION.- BRIDGE 1110.109 0111 SR 1706 (E. lst ST.) OVER US 29 TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE SR 1706 -------------------------- -------------- TO SR 1008 BEGIN PROJECT B-5372 —L— STA. 17 + 00.00 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. BEGIN —Y— STA z 0 V AV A V A\\\ 0 0 \ \\ \ \ C O N ST. I\� \ \\ \\ \\ \\ �/ �N-1 1A+71 :10 �,X i BEGIN BRIDGE STATE STATE PROJECT REFERENCE Na SHEET NO. TOTAL SHEETS NA"-7o ID-5372 1 STATE PROD. NO. F. A. PROD. NO. DWRIPTION 46087.1.1 P.E. \ \ END BRIDGE\\ II END PROJECT B-5372 \ \ \I\ —L— STA. 21 + 52 +/-11 I II —L— STA. 25 + 85.00 —LPC— EAST 1ST STREET g END CONST. /\�\\\\\�\\\ \i� O -Y- STA 21 + 59.64 j L� �� \�\ \X\ \ O T 0 - DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES 50 25 0 50 100 DESIGN DATA 2020 = 3520 ADT 2040 = 51600 K = 11% ° D = 55 /o T = 5% * V = 40 MPH * TTST =1% DUAL = 4% F U N C CLASS = MINOR COLLECTOR SUB —REGIONAL TIER PROJECT LENGTH LENGTH ROADWAY TIP PROJECT B-5372 = 0.133 MILES LENGTH STRUCTURE TIP PROJECT B-5372 = 0.035 MILES TOTAL LENGTH TIP PROJECT B-5372 = 0.168 MILES Prepared in the Office of. VAUGHN & MELTON, INC..ADT 3509 Haworth Dr. #loo, Raleigh NC, 27609 Phone (919)-977-9455 HYDRA ULICS ENGINEER P.E. SIGNATURE: r, -7 ❑ Boone. NC 828-355-9933 ❑ Tri-cities, TN 423.467.8401 ❑V&" Knoxville, TN Vaughn &Nel/on 865 546 5800 Consulting Engineers ❑ Spartanburg, SC 864 -574 .4775 Asheville, ❑ 843-9 4-5650 ❑ North Carolina 843�974.5650 828.253-2796 Middlesboro, KY ■ Raleigh, NC ❑ Charlotte, NC 606 248.6600 919.977-9455 704.357.0488 ❑ Atlanta, GA 3509 770. ese ved CoDYright ® 2006 Vaughn & Melton, Inc. All Rights Reserved__) 2018 STANDARD SPECIFICATIONS REECE M. SCHULER P.E P.L.S PLANS 50 25 0 50 100 RIGHT OF WAY DATE: OCTOBER 25, 2022 PROJECT ENGINEER JON FORD, P.E. ROADWAY DESIGN ENGINEER P.E. SIGNATURE: —.0000 PROFILE (HORIZONTAL) 10 5 0 10 20 LETTING DATE JUNE 232023 , PROJECT DESIGN ENGINEER DAVI D STUTTS, P.E. NCDOT CONTACT PROFILE (VERTICAL)_11111 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 cc D_ -L- P/ Sta 22 +20.05 P/ Sta 24 +04.92 PI Sta 25 +44.94 PI Sto 26 +96.20 0 = 25° 03' 06.3u (LT) 0 = 78' 39' 33.1" (LT) p = 37° 52' 24.5" (LT) Q = 52' 17' 47.1, (LT) D = 22° 55' 05.9" D = 35° 48' 35.5" D = 38• /// 49.9" D = 35° 48' 35.5" L = 109.31" L = 219.66' L = 99.15' L = 146.04' PROJECT REFERENCE NO. SHEET NO. \\ \ \ z \ ' ``� - B -5372 4 v D RW SHEET NO. \\ c \ \ z3 -L POT Sta. 28 +04.38 \ Z\ \ o \ ROADWAY DESIGN HYDRAULICS \ ENGINEER ENGINEER \ D \ \gyp cn C \ \ \ -L - PT Sto. 27+63.69 `� , CASTLE AND COOKE CHIPOLA \ �\ \ N\ \\ DB 8845 PG 16 a\PB 56 PG 2 -A\ T = 55.54' T = 131.10' T = 51.46' T = 78.55. ............ ka6o3 R = 250.00" R = 160.00" R = /50.00' R = 160.00 BM3 ELEVAT ION = 730 ° 45 P PANS ANS - - PANS N 638638 E 1520445 BM-3 PRELIMINARY RY PLANS DO NOT USE FOR CONSTRUCTION INCOMPL]E EPLANS DO NOT USE 1FOR // W ACQUISITION R.O. - SEE L R.O. - SEE L R.O. - SEE L SE = 0.04 SE = 0.04 SE = 0.04 BY STATION 7 , 57. 00 94 RIGHT o o \ \ \ N J V = 30 mph V = 25 mph = RR SPIKE IN BASE OF 15 INCH*PIN\ p V ** \\ \ \ \ r p 25 mph * \ \ \ Q DOCUMENT NOT CONSIDERED FINAL -Y- \ \ \�� \ UNLESS ALL SIGNATURES COMPLETED \ \ a y PI Sta 13+58.32 P/ Sta 18+08.02 0 = 7 00 57.1 (LT) A _ 6.43 45.3 (LT) \ \ \ \ x D = l 301 28.0 D = l 351 29.6 \ \ ESP �r L = 465.3/ L - 422.8/ \ \ �\ \ \ a �2z' g� T = 232.95' T = 2/1.65' \ \ -< MTL S I II I, sT / o. \ \ \ \s} R - 3,800.00' R - 3,600.00' M \ \ \ L - P St . 2017.65 _ l , r I \ \ \ \ III / - �� alS riNc \ / ��\ \ l0 \ \ BM 2 WOODS CORNERSTONE CABARRUS, LLC ^1 DB 11220 PG 022 I \ �\ w - - / III \ GRASS 11L� PIS Sto. 25*92.63 � PB 46 PG 63 l \\ � � �I I `I 0 N \ 3\ -\ \ \ ti �� I F M ELEVATION 726.34 O L\ I 38 52 E 1520970 a• 15 BY -I ( o \ END TlP PROD C-T - o , 000S T,�t � 9� \ S 5 \ \ \ \ - - B 5372 I BL STATION 26, 15. 00 67 RIGHT \ RR S IKE IN BASE OF 30 INCH PINE -L- +82.12 �`f��' 103.56 \ � �, rro L ST 5 f65o00 F \ II ...... * .. 229.79j Q• ,. .. enua or \ , ` E I P /% / 5\� \ \ \ \ i BEGI CURB A D GUT T R \\ \ - - >y ST• \\ \ �\ \ Y STA.17109.42 \ \ L PCC Sta. 24+93.48 wooDs /ii / / j A• 16+7/ 3 \ \0 \ F -L - PC Sta. 21 +64.51 \ ;✓�, WOODS /�°�c , F \ 96 6' 25) ,o„ C / / ,r o \ 3 L FCC Sto.22+73.82 I I -L- +60.00 Cl ` I I � \ N\� EXIST. R/W ---- ---- \ \ \ C I 4' FDPS I 4' FDPS /4 ss S / 7 EIP � � +A9. DAVID H. MURDOCK F vv \ o� �, \ \ � v�p2� / I z D/B/A es'' I DHM HOLDING COMPANY J: �c - _ _\ _ _ ,8 ° RCP -L - POT Sta. 20 +59.44 \ \ , , _F, i � \ � Iy DB 606 PG 766 -T lP PROJECT 72 STONEWALL \� /� _ _ \ - _ sc \ I -Y - POC Sta. 19 +20.58 -LPC- PC Sta. 11 +90.85 l 0.00_L- �\ _ 13+60.71 STONEWALL ------------- ------ F/ \ \ \ go\ III 49.41' EXISTING R/W � \ \ F-,,--\ \ Eev.=HF L737.571+15.00 GREU TLWOODS BL-5 I �`\ // \ - 000s ` 0 F - PC- PT Sta. 12+55.19 (-RnssBL-6 - oo�s -LPC- +60.00 30" C&G �1l CB _ 30"C&G \f�aD/ \� \ \\\ GRE W Y / BL_ y EXIST. RIVy - - s - • 16R _ - - - 367s� - 8 ° C P - - �_ - - - - - - - - 8 c P- - - - - - - S 63" 20' 48.6" can �, N -LPC- PC Sto. 12 +66.25 _ _ - "C&G- c \- - O O O O O O O �� 4' FOPS CB 30"C&G _j CB BM-1 aII + ss 12" VC III�� \ cR ,a 1 III \------- GREU T -2 111 • _ 12 0l 50.59' I o \ G \\ \ YPE 111 GREU L-2 - 1 Ilo +75.72 \\ WooDS \ WOODS +71a69 EXISTING R/W- 54°71' \\ \ \ TYF. �i�90 I 5 0 , 7 6' WOODS 11 S� \\ \ \ 66°43'49" \ \ \ \ \ \ I _ /9 Jc o \\ \ `- _ _ _ \ `\ s E D CURB A D UTT R 1 10" VC �� 0 �' o WOODS ° \\ \ T>'F. N \` \\ \ \ \ -LPC- STA.Ilf00.00 4'FDPs \ ' _ r 0 N _ _ _ -s� 9 � \`\ �, LPC POT Sto. 10+00.0 - --------------- �/ --� �, \\ \ F1 - - , , , � \ \ \ \ // _L - PC Sta. 2/ +64.51 S 63°20'40" E \\ \ \ - UNIFORM i5o.00' \\ \ z \ \ \ \ �\ k67.21 ------------------ F - �,1 AFER \� W ooa \ -Y - PT Sto. 20 +19.18 \ Z 29' \. \ \ o F s; - E D 0 T �\ WOODS s, S \\\\ \3 \ \ \ \ F _ / � \ g \ C - STA 14 +00 00 ` 1 CATER CO PANY AQUISITION CORP. WOODS F C/0 CITY OF KANNQPOLIS r� \ DB 734 PG 335 \ F \\\ N\ �� \ \`\ -LPC - Sto. 14+69.87 GREU TL -2C \ , �o atio DAVID H. MRDOCK� I �\ \�\ DB/A \ �o \ \ \ colt DHM HOLDING COMPANY �I \ DB 606 PG 766 S\ Wp 00 13 \ -LPC- / I. 3 s \ LPC POT .I \F 0 t 4 �I \ \ END CURB AND GUT T R Cn I \ \ \ V -Y- STA.2/f59.64 / I' x - ��-� ttenu F - Y-13R4ss II I_ I 22' BST WOODS /�5�--- FR 'S � � \ \ \ � •-12 I I II 56 °59'52" E .� \\\ \ \\ � WOODS 307°64 \ \ BM1 ELEVATION = 732.21 - U/ / E 1519571 ss`` �C\i � � � DAVID H. MURDOCK N 638516 ' BL STATION 9 77°00 74 RIGHT \ems �D CURB G TT ° �\ \\� \ \\\�\ \ D/B/A RR SPIKE IN BASE OF 24 INCH OAK Um Y STA. 6.38 N\ o \\ \ \ \ \\�\ ( DHM HOLDING COMPAN \ ...................................... - `r RC �'00 YATES INVESTMENT PROPERTIES, LLC ! \L \ l •`\\ S ��� \- j� M WOODS DB 606 PG 766 �s N DB 11475 PG 248 __-_-� \\ \ \ P\S "� \ �° \ \\ +85.57 M PB 68 PG 50 \ � �s \� 83.61' �\s�� 12" N VC LPC �, I s r\ \ .. .............. . ' END CONST.-� �\ ......... PI Sta 12+23.69 P/ Sta 14+28.38 I d \ \ �� \_ = 28° 21' 14.7" (RT) 0 = 1/6° 40' 08•/" (RT) \ -Y- STA.2/+59.64 � Q 10" C \ � � �_ BM4 ELEVATION `n�, O " �- � � 637628 E 1520558 0 \ BY s 0- 1.7. -31 ° 00 100. LEFT D = 44° 04' 25.2" D = 57° /7' 44.8" -S 5g659gg2" E I �° \ \ \ \ \ \ �_ IN A M L = 64.33 L = 203.63\`�, 75.00 S 57.57' ! ;CO o \ 6/4 PODS T = 32.84 T = 162.13 \ � 9 , � R - 130.00 R - 100.00 SEE SHEET 5 FOR L AND LPC PROFILE w �N 57 57 42" \\ \ o\ \ HOELL PROPERTIES; R.O. = SEE PLANS SE = 0.04 SEE SHEET 6 FOR Y, LPA AND RPB PROFILE LLC 5 �' SE = 0.04 V = 20 mph � DB 9440 PG 0220 o w C S 58°22'17" E V = 20 mph "' o o ,� AN � \ o a, MT I z fSQ�T.HY sD CAN�»� DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 Aroject T racking No. (Internal Me) 20-01-0002 CG�1►ti HISTORIC ARCHITECTURE AND LANDSCAPES r NO SURVEY REQUIRED FORM This form only pertains to Historic Architecture and Landscapes for this project. It " is not valid for Archaeological Resources. You must consult separately with the Archaeology Group. PROJECT INFORMATION Project No: B-5372 County: Cabarrus WBS No.: 46087.1.1 Document Type: PCE or CE Fed. Aid No: N/A Funding: ❑ State X Federal Federal Permits : ❑ Yes ® No Permit T e s : NIA Project Descri ti2g: Replacement of Bridge No. 109 on SR 1706 (E. I" Street) over US 2$. SUMMARY OF HISTORIC ARCHITECTURE AND LANDSCAPES REVIEW Description of review activitiesresults, and conclusions: *Previously reviewed under 15-02-0043* Review of HPO quad maps, HPO GIS information, historic designations roster, and indexes was undertaken on January 7, 2020. Based on this review, there are no existing NR, SL, LD, DE, or SS properties in the Area of Potential Effects, which is defined on the fallowing maps. All properties over fifty years of age within the APE were visually inspected, and no properties warrant further evaluation. The Study Area borders the Determined Eligible/Study Listed Kannapolis Mill Village Historic District: Black Section (CA0264A), however the district will not be affected by this project and does not fall within the APE. Bridge No. 109 is not eligible for NR listing. There are no National Register listed or eligible properties. if design plans change, additional review will be required. Why the available information Provides a reliable basis for reasonably predictinA, that there are no unidentified significant historic architectural or landscape resources in the project area: HPO quad maps and GIS information recording NR, SL, LD, DE, and SS properties for the Cabarrus County survey and Google Maps are considered valid for the purposes of determining the likelihood of historic resources being present. There are no National Register listed or eligible properties within the APE and no survey is required. SUPPORT DOCUMENTATION ❑Map(s) ❑Previous Survey lit[o. ❑Photos ❑Correspondence []Design Plans FINDING BY NCDOT ARCHITECTURAL HISTORIAN Historic Architecture and Landscapes --NO SURVEY REQUIRED NCDOT Architectural Historian Date W Historic Arcllifecfrireand Lamiscapes NO SURVEY RF.Q(11RFD form for Minor T ramporfafion ?mjeas as QAuhfred in the 20071'rogrommaric Agreemen7. Page 1 of 2 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 Project Tracking No.: 15-02-0043 Revised NO ARCHAEOLOGICAL SURVEY REQUIRED FORM This form only pertains to ARCHAEOLOGICAL RESOURCES for this project. It is notes valid for Historic Architecture and Landscapes. You must consult separately with the Historic Architecture and Landscapes Group. PROJECT INFORMATION Project No: B-5372 County: Cabarrus WBS No: 46087.1.1 Document: CE F.A. No: na Funding: ® State ❑ Federal Federal Permit Required? ® Yes ❑ No Permit Type: USACE Project Description: The project calls for the replacement of Bridge No. 109 on SR 1706 (East 1st Street) over US 29 in Cabarrus County. The archaeological Area of Potential Effects (APE) for the project is defined as an approximate 2, 900 foot (883.92 m) long corridor running along East I st Street. From the center of the bridge, the corridor extends approximately 2,200 feet (670.56 m) to the northwest and 700 feet (213.36 in) to the southeast. The corridor has a variable width of 200 feet (60.96 m) at its northwestern end and expands to 850 feet (259.08 m) towards the southeast. The APE includes all existing ramps and a portion of US 29 extending approximately 825 feet (251.46 m) to the north and 420 feet (128.02 m) to the south along US 29 from the bridge. In all, the APE encompasses approximately 32 acres, which will cover all ground disturbing activities. It is anticipated that this project will require federal permits. Therefore, the archaeological review of Bridge No. 109 was conducted pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance (36 CFR Part 800). SUMMARY OF CULTURAL RESOURCES REVIEW Brief description of review activities, results of review, and conclusions: Bridge No. 109 is located in Kannapolis and west of I-85 at the northern boundary of Cabarrus County, North Carolina. The project area is plotted in the northwest corner of the Concord USGS 7.5' topographic quadrangle (Figure 1). A map review and site file search were conducted at the Office of State Archaeology (OSA) on February 19, 2015 with a subsequent review on December 18, 2019 due to the project's resubmittal. No previously recorded archaeological sites have been identified within the APE or a mile of the bridge. According to the North Carolina State Historic Preservation Office online data base (HPOWEB 2015), the boundary for the Study Listed and Determined Eligible Kannapolis Mill Village (CA 264a) is just south of the archaeological APE. However, no surveyed or contributing archaeological resource falls within the APE. Topographic maps, USDA soil survey maps, aerial photographs (NC One Map), and historic maps (North Carolina maps website) were examined for information on environmental and cultural variables that may have contributed to prehistoric or historic settlement within the project limits and to assess the level of ground disturbance. Bridge No. 106 and East 1 st Street cross US 29 from the northwest to southeast. Unnamed tributaries to Cold Water Creek run alongside East 1 st Street to the north and south crossing under the road west of the bridge. These waterways are part of the Yadkin -Pee Dee drainage basin. The APE is situated mostly on ridges and side slope adjacent to the drainages, but the majority of the landforms has been modified "No ARCHAEOLOGY SURVEY REQUIRED " form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 1 of 5 DocuSign Envelope ID: FCA8FBAC-FAOB-4E9D-87EB-9DACDE92A739 Project Tracking No.: 15-02-0043 Revised (Figure 2). It is likely that some of the area was in floodplain prior to the construction of US 29 and the ramps. The channels for the tributaries have also been modified to improve drainage and prevent flooding. Although the APE is forested in places, it is characterized by urban development and residential properties. Overall, ground disturbance is very heavy. The USDA soil survey map suggests that the APE is composed of two soil types (see Figure 2). The Cecil -Urban land complex (CeB) covers most of the project area. These are mixed soils, where most of the natural soils have been altered or covered as the result of grading or digging. The series also contain households, pavement, and building complexes. It is very unlikely for intact deposits to be found in these altered soils. The second series, Cecil sandy clay loam (CcD2), is situated along the side slopes next to the tributaries. These are well drained but eroded soils with a slope of 8 to 15 percent. Due to soil erosion, it is unlikely for a significant site to be present. A review of the site files shows few archaeological surveys and no sites within a mile of the project area. Although the current APE has not been reviewed or included in any previous studies, nearly all properties surround the project have been reviewed and cleared by OSA as low potential due to disturbance. The current project area shares the same characteristics as these other reviewed properties. Lastly, a historic map review was conducted. Early and accurate historic maps of the project vicinity are rare. The 1910 soil map of Cabarrus County is the earliest map to depict the project area with any accuracy (Figure 3). This map shows no roads or structures in the vicinity of the current bridge. Likewise, subsequent early 20th century maps illustrate no additional features. As a result, it seems that no historic archaeological deposits should be affected by the proposed bridge replacement. Brief Explanation of why the available information provides a reliable basis for reasonably predicting that there are no unidentified historic properties in the APE: The defined archaeological APE for the proposed replacement of Bridge No. 109 over US 29 consists of heavily disturbed soils associated with past urban development and road construction. It is very unlikely intact and significant archaeological deposits will be encountered within the APE. In addition, OSA has cleared many neighboring properties with similar characteristics as low potential for significant sites. Lastly, the historic maps suggest that no former historic structures and/or features are in the area. As long as impacts to the subsurface occur within the defined APE, no further archaeological work is recommended for the replacement of Bridge No. 109 in Cabarrus County. If construction should affect subsurface areas beyond the defined APE, further archaeological consultation might be necessary. Please note, this project falls within a North Carolina County in which the Catawba Nation have expressed an interest. It is recommended that you contact each federal agency involved with this project to determine their Section 106 Tribal consultation requirements. SUPPORT DOCUMENTATION See attached: ® Map(s) ❑ Previous Survey Info ❑ Photocopy of County Survey Notes FINDING BY NCDOT ARCHAEOLOGIST NO ARCHAEOLOGY SUR VEY REO UIRED 0 C. Damon Jones NCDOT ARCHAEOLOGIST II ® Photos ❑Correspondence Other: Images from historic maps 1 /2/20 Date `No ARCHAEOLOGY SURVEY REQUIRED " form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 2of5