Loading...
HomeMy WebLinkAboutGW1--02601_Well Construction - GW1_20240426 WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: ' 1. ell Contractor Innation: (�,/ (f r i A i 1 don �13i6b l/ f4/is 14.WATER ZONES., W I ContractorName • FROMecp DESCRIPTION 5ft. ft. - ' tt.' ft. NC Well Contractor Certification NumberNei(\ 15..OUTER CASING'(for multi-cased'wells)ORLINER(if ap llcable)�I�� 11I I I I FROM TO DIAMETER THICKNESS MATERIAL H�ft. jl ' ft. tO73 t/in. 2 5 j7 Company Name r� ( (/ t 5 /j "� f t( J -16:INNER.CASING:ORTUBING'c(geother'mandosed-loop); .. 2.Well Construction Permit#: (V0�/ Vv FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC, ounty.State,Variance,etc.) ft. ft. in. _ 3.Well Use(check well use): ft ft. in. _ Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural OMunicipal/PublicAesidential ft. ft in.❑Geothermal(Heating/Cooling Supply) Water Supply(single) ft. ft in. - ❑lndustrial/Commercial ❑Residential Water Supply(shared) •. . . 18: ❑irrigation ❑Wells>100,000 GPD . FROM TO MATERIAL EMPLACEMENT MET OD&AMOUNT Non-Water Supply Well: G ft. ft. hei en1 i i , a red- ❑Monitoring ❑Recovery ft. ft. Injection Well: ft. ft. , ❑Aquifer Recharge ❑Groundwater Remediation 19,SAND/GRAVEL PACK(ifapplicable) - . - - ❑Aquifer Storage and Recovery OSalinity Barrier FROM TO . MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) OTracer •.20.DRILLING LOG(attach additional sheets if necessary).;,-;: :-. .:.. ' .,-:.. :-•.- .•.;°• FROM TO DESCRIPTION(color,hardness,soil/rock type,grain size,etc.) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) ® ft. y fr. clot ( � -1 4.Date Well(s)Completedx. ) —1`OG Well ID# sr ft. ...?1,...?1, ft 54 n Y 53 Well Location: -.�. ft. )�s it /�t��5 �� �( P �j`�C�V'— as"_ '� a .—) Sit f7�ft' 9/ra v1 I fe.-... • Facility/Owner Name F:f dity ID#(if applicable) ft. It. ci(?)( ') � at t n 4-� /t ft. ft. ; P ical A ress,City,and Zip It ft. Cj�..nus 1PR2 )fi2r 21:'REM ARKS - County Parcel Identification No.(PIN) lr>•tp 7r••• 7-''• P''`'f''' '`•-" '1," C)W/20C) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if wellfield,one IaV[[long is sufficient) �(n u fl 22.Certification: I > /�• //, t /t �jJ ,ri166o N l)lJ 't� L� J W 7lP v��Y' 7140 �� 3—,"i- Z 6.is(are)the well(s): ❑Permanent or ❑Temporary Signature of Certified Well Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance.tvitlt 7.Is this a repair to an existing well ❑Yes or No RSA NCAC 02C.0100 or ISA NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair fill out known well construction u formation n explain the nature of the of this record has been provided to the well owner. , repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9,Total well depth below land surface: L a o (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if difierent(example-3@200'and 2@100') 1 24a. For All Wells: Original.form to Division of Water Resources (DWR), 10.Static water level below top of casing: �0 (fL) •Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing.use"+"11.Borehole diameter: G 74 "I (in.) 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: '(1 Ro/Af2 I �' 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 0 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA NYC)U . Method of test: 13a.Yield(gpm) �r' Permit Program,1611 MSC,Raleigh,NC 27699-1611 11 l 13b.DIsinfection type: ri-(`T` Amount: 1pi—