Loading...
HomeMy WebLinkAbout20151242 Ver 1_More Info Letter_20160112Water Resources ENVIRONMENTAL QUALITY January 12, 2016 CERTIFIED MAIL #7013 1710 0002 1922 2552 RETURN RECEIPT REQUESTED Williams Gas Pipeline Attn: Michael Naeger 2800 Post Oak Blvd Houston TX 77056 Subject: REQUEST FOR ADDITIONAL INFORMATION Williams 2016 DOT Replacement Project MP1350 Dear Mr. Naeger: PAT MCCRORY DONALD R. VAN DER VAART SC' 11401 S. JAY ZIMMERMAN Do,, I r DWR # 15-1242 Guilford County On December 1, 2015, the Division of Water Resources — Water Quality Programs (Division) received your application dated November 23, 2015, requesting a 401 Water Quality Certification from the Division for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. The land exhibit provided with this PCN appears to indicate that the limits of disturbance my impact the stream bank and/or existing buffers at Stream 1. Please provide a more detailed plan sheet at an increased scale of this area to show the LOD, the parallel stream, the existing woods line and any impacts that may occur to the buffer and/or stream as a result of construction. [15A NCAC 02H .0506(f) and (g)] If impacts are to occur to the buffer in this area please provide a buffer authorization from Guilford County. If impacts are to occur to Stream 1, please update the PCN accordingly. If the stream will be avoided during construction please provide a detail of additional measure to be taken to ensure that construction and/or sediment control measures will not impact the streambank. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. 450 W. Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105 Phone: 336-776-98001 FAX: 336-776-97971 Customer Service 1-877-623-6748 Internet: www.ncdenr.gov - www.ncwater.org Williams Gas Pipeline DWR# 15-1242 Request for Additional Information Page 2 of 2 Please respond in writing within 30 calendar days of receipt of this letter by sending three copies of all of the above requested information to the Wetlands, Buffers, Stormwater — Compliance and Permitting (Webscape) Unit, 1617 Mail Service Center, Raleigh, NC 27699-1650. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact me at 336-776-9693 or Sue. Homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Sue Homewood Winston-Salem Regional Office cc: Darren Peine, S&ME, Inc (via email) David Bailey, USACE Raleigh Regulatory Field Office (via email) DWR WSRO 401 files DWR 401 & Buffer Permitting Unit