HomeMy WebLinkAboutNC0083071_Authorization to Construct_19950915sY .
A//1_/
State of North Carolina
Department of Environment,
Health and Natural Resources
Division of Environmental Management
James B. Hunt, Jr., Govert, r
Jonathan B. Howes, Ser-mtary
A. Preston Howard, Jr., F.E., Director
September 15, 1995
Mayor Bishop Holder
Town of Robbinsville
PO Box 126
Robbinsville, North Carolina 28771
Subject: 'errnit No. NC0083071
/wthorizatio❑ In Construct
Robbinsville WTP
Graham County
Dear Mayor Holder.:
A letter of request for an Authorization to Construct was received June 19, 1995 by the Division
and final plans and specifications for the subject project have been reviewed and found to be satisfactory.
Authorization is hereby granted for the construction of a geotextile fabric lined backwash water lagoon of
approximately 70,000 gallons with a 10 inch influent line with concrete splash pad, dual flared 8 inch
discharge lines with a height differential of one foot with discharge to a riprapped outlet into Rock Creek.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES
Permit No. NCO083071 issued August 19, 1993 and shall be subject to revocation unless the wastewater
treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No.
NC0083071.
The sludge generated from these treatment facilities must be disposed of in accordance with G.S.
143-215.1 and in a manner approved by the North Carolina Division of Environmental Management.
In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including chose as may be required by this
Division, such as the construction of additional or replacement wastewater treatment or disposal facilities.
The Asheville Regional Office, telephone number 704/251-6208, shall be notified at least forty-
eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be
made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00
a.m. until 5:00 p.m. oil Monday through Friday, excluding State Holidays.
Upon completion of construction and prior to operation of this permtted facility, a certification
must be received from a professional engineer certifying that the permitted facility has been installed in
accordance with the NPDES Permit, this Authorization to Construct and the approved plans and
specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC
27626-0535.
Upon classification of the facility by the Certification Commission, the Permittee shall employ a
certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10 % post -consumer paper
Permit No. NC0083071
Authorization to Construct
Town of Robbinsville
September 15, 1995
Page 2
facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the
classification assigned to the wastewater treatment facilities by the Certification Commission. The
Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with
the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at
least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and
must properly manage and document daily operation and maintenance of the facility and must comply with
all other conditions of Title 15A, Chapter 8A, .0202. Once the facility is classified, the Permittee must
submit a letter to the Certification Commission which designates the operator in responsible charge within
thirty days after the wastewater treatment facilities are 50% complete.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for the
life of the facility.
Failure to abide by the requirements contained in this Authorization to Construct may subject the
Permittee to an enforcement action by the Division of Environmental Management in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from complying
with any and all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is heinn forwarded to you. If -you have any
questions or need additional information, please contact Mr. Charles Alvarez, telephone number 919/733-?ow,�
5083, extension 553.
Sincerely,
-
reston H w Jr., P.E.
cc: Graham County Health Department
Asheville Regional Office, Water Quality
Training and Certification Unit
ATC Files