HomeMy WebLinkAboutNCC241302_ESC Approval Submitted_20240429 Srn>F
ROY COOPER ,
Governor I' dl .;-,\�l�`
if
ELIZABETH S.BISER °ten»° .
Secretary
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
03-13-2024
LETTER OF APPROVAL
Duke Energy Progress, LLC
410 South Wilmington Street
RE: Project Name: Rocky Mount-Vepco Battleboro 115kV Rebuild
Project ID: NASH-2024-00104
Acres Approved: 101.6
County: Nash
City: Rocky Mount
Address: 550 Old Mill Road
River Basin: Tar-Pamlico
Stream Classification: NSW: Nutrient Sensitive Waters; WS-IV: Water Supply IV
Submitted By: Nuwan Wijesuriya
Plan Type: New Plan (Express)
Dear Duke Energy Progress, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We hereby issue this
Letter of Approval. Any modifications required for approval are listed in the body of the email that
accompanied this attached letter. The enclosed Certificate of Approval must be posted at the job
site. This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities not explicitly exempt are required to complete
and submit an electronic Notice of Intent (eNDI) form requesting a Certificate of Coverage (COC)
under the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the annual permit fee. After the fee
is processed,you will receive the COC. As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01.
D
E�A No Department Quality , al d!/J/ 512 NorthrthCarolina Salisbury Street 1612of MaEnvironmentalil Service Center I RaleighDivision,Northof CarolinaEnergyMiner 27699-16anLan12d Resources
NOR CAROLINA
oaoann,am m eaao-oan,amai uaany 919.707.9200
Letter of Approval
Duke Energy Progress, LLC
03-13-2024
Page 2 of 2
Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this
project, the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),
this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form and on the plan, which you provided. You are requested to file an
amended form if there is any change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
"0,-,QYN
Land Quality Section