Loading...
HomeMy WebLinkAboutNCG030567 DMR SW (4)Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General neral Permit No. NCG030000 Date submitted f �- CERTIFICATE OF COVERAGE NO. NCGO3QSAMPLE COLLECTION YEAR _ FACILITY NAME O .(1�111a( c SAMPLE PERIOD iian-june❑ my -Dec: LCOUNTY ��rK� orMonthlyl ; month PERSON COLLECTING SAMPLES R E� E IV CHARGING TO CLASS ❑ORW QW []Trout ❑PNA LABORATORY" - Lab Cert. #❑Zero -flow ❑Water Supply ❑SA Comments on sample collection or analysis: SEP 0 3 2015 ❑Other Part A: Stormwater Benchmarks and Monitoring Results 3ENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION I VI No discharge this period?Z- Outfall No.Collected' Date Sample (mo/dd/yr) 24-hour rainfall amount, Inches � Total Suspended Solids pH, Standard units Copper Lead Zinc. Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organicss Benchmarks 100 mg/L or 50 mg/0 6.0-9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outran. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture, electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found -in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 - Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitorina period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significapt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature Permit Date: 11/1/2012-10/31/2017 CJ �� (D te) SWU-245, last revised 10/25/2012 Page 3 of 3