Loading...
HomeMy WebLinkAbout20072019 Ver 1_Stormwater Plans_20071203^ Storm Drainage and Erosion Control Calculations f.7-2019 Lufkin Road and Ten Ten Road Roadway Improvements Apex, North Carolina ;p Prepared for: o~ ~ ~ znu ~ Town of Apex ~~r~~ _ wA-r~~ cxf~--lr~ ©Kimley-Horn and Associates, Inc., 2007 iNETI_AlJt~gAA'D ~T4~M!".'''~~ER 9RAHun ^ ~ ^ Kimley-Horn ~ and Associates, Inc. LUFKIN ROAD AND TEN TEN ROAD ROADWAY IMPROVEMENTS APEX, NORTH CAROLINA STORM DRAINAGE AND EROSION CONTROL CALCULATIONS Prepared for: TOWN OF APEX P.O. BOX 250 APEX, NORTH CAROLINA 27502 Prepared by: KIMLEY-HORN AND ASSOCIATES, INC. P. O. BOX 33068 RALEIGH, NORTH CAROLINA 27636 MARCH 2007 REV. SEPTEMBER 2007 011200019 ~ TABLE OF CONTENTS OVERVIEW . USGS QUADRANGLE MAP SOIL CLASSIFICATIONS • SOIL CLASSIFICATION SUMMARY USDA SOIL SURVEY MAP - FEMA FLOOD INSURANCE RATE MAPS STORM DRAINAGE CALCULATIONS PLAN VIEW - INLET REPORT PIPE REPORT • HYDRAULIC GRADE LINE PROFILES WATER QUANTITY - PRE-DEVELOPMENT DRAINAGE AREA MAP . POST-DEVELOPMENT DRAINAGE AREA MAP FLOW EVALUATION (PRE-DEVELOPMENT VS. POST-DEVELOPMENT) • WATER QUALITY DITCH STABILIZATION CALCULATIONS - CULVERT CALCULATIONS ~ CULVERT SUMMARY HW/D CALCULATIONS STORM DRAIN DESIGN COMPUTATIONS (25-YR STORM) TEMPORARY SEDIMENT CONTROL - SKIMMER SEDIMENT BASIN SEDIMENT TRAP - RIP RAP APRON SUMMARY OVERVIEW Back rg ound This report contains stormwater calculations prepared for the Lufkin Road and Ten Ten Road roadway improvements in Apex, North Carolina. The project consists of realigning approximately 1500 LF of Lufkin Road and widening approximately 1100 LF of Ten Ten Road. Additional improvements consist of the installation of 2'-6" curb and gutter along the south side of Ten Ten Road and along Lufkin Road near the intersection with Ten Ten Road. The majority of stormwater runoff from Lufkin Road and a portion of the stormwater runoff from Ten Ten Road will flow through the proposed roadway drainage system and discharge into an upper tributary of Middle Creek. The proposed storm drainage has been designed to maintain the natural flow of water; therefore, no diversions are proposed. Water QuantitX The proposed stormwater system has been sized for the 10-year storm as required by the North Carolina Department of Transportation. The standard NCDOT drainage structures and reinforced concrete pipe are proposed for this project, including 6 catch basins, 2 grate inlets, 1 junction box, 5 piped-end sections, and reinforced concrete pipe. The proposed catch basins were placed using a maximum spread of '/z a lane width with a 4-inch per hour intensity. The culverts were designed for the 25-year storm as required by NCDOT. Since the proposed runoff at all three analysis points meets the pre- vs. post-development runoff requirement of less than a 10% increase, no stormwater detention or treatment facilities are required or proposed for this project. Erosion Control The appropriate erosion control measures have been taken to minimize sediment-laden stormwater runoff created as a result of the project's land disturbance. Proposed erosion control measures include temporary inlet protection, silt fence, grass Swale, ditch stabilization matting, temporary diversion ditch, temporary sediment trap and temporary skimmer basin. The proposed project will disturb approximately 5.25 acres of land. Methods The attached calculations, prepared using Haestad Method's StormCAD and FlowMaster software, North American Green software and other spreadsheets, provide support documentation required for review. Conclusion Based on the analysis provided herein, this design meets the stormwater and erosion control requirements of the Town of Apex and NCDOT. a~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~s~~~~~ d r b i. -."; ". i ti z~ alt f '. ^ ~ : .\ _ J1< . _ + r:: ~ / 1 - f • I i ~ ,_ ~ ~`. Fr Vanoo Ptsql ~/ rq b ~ $ 639 ypT \ ~ t \ l J-ems -~---,_ ~'. ta~oRr ~.. ~ f I___- ~~ .~J_ ~ ;4~• I ~samr i,/r~i ~ •~r-. • , ,- !~ ., _ _l oak . w r , - f" ~\\ . - ` , '4s - v~ ~~~4-1-r~t ° _ ~-- V "j ~~~ _J 1 eru Park f 1`?~ ~ 4 C.-i .v ~ I'y •` ~ ~ )law\ {~ ) ~ try ~ ~y ,~ r-, ~ ~~ T\_ ~~ r ? kh ~i_ ~ ~ . ;;;r (~` ,\ SuCsta[Mp - / t i ,_ . ,, `~ - r ,, ~.5 `~ ,. ~ .A F,<~4.~ Tranlr ~J ~~,~429~ /'~~ at ~~ ~l , t i 'ork ~ --- . ~~ : :~' ~ I _ _ ~ Tanks ~ ~ 4~` ~~"~~ z ti . _ L.: ~ ( t ~tN~9 ~-,~' 9 Tc,v/e ` Lookout, __~ X . ~ ~ --•~- P+p~i _ / ~~ \ / \ ~ ABM awes ~ ji~. ~x _- !~ py ~th `_o i~~ ~~ ~~- ~ •' 680 !-~~"~ ~".' i \ .'s, ~ ) ~'ticet' '-_ ~ ~ ~ ~ + ~ _ • ~~ - '"~ i ~ ~ j! Title: USGS Quadrangle Map (Apex , NC 1987) Project: Lufkin Road and Ten Ten Road Roadway Improvements Kimley-Horn Apex, North Carolina ~ and Associates, Inc. Date: Scale: Project No. Figure: 3/6/07 NTS 011200019 1 0 H U w H L/~ U ¢; •••s•••••••••••••••~•s••s•••••••••••••••••~• ^ .. ' ' SOIL LEGEND d ; 1 . , , r•a wl. ,~ ,. ~ Ilr 1 .I. pa ~~ Aks.l , ynJ ~ol.~~wntwu,~o elo(n. Ivnm ur. tla„a al l l n• n w .,.1 lr lu .Ii, ..,I 1 Lul r innd „nn ,na Iw 1 ( ' 71 .., „I „ 11,. ,,.,,~ .oa r V.~1n1,VV.sr..r ,s,n .,,~I .s er~dnJw .. ,nr.~l, n .. ri .s , ...i. ~- ~ `y ~/~I.~ ~ SYMBOL NAPE SYMBOL NAME SYMBOL NAME T (/J ~ ~ A(A A{sV alln. ,xl.ly „iy sl:,r~na 'y r~1e+111.. ..,Ir IV: _ nV.er: nn :I.~l ea 11nA Vorfolk loamy .onJ, ("n er.n <IVyws Aal 4 43 A! I- II S 1 I p A II 1 I f I d d l .1! II p I 1ni t II - 1 I I E J tiJ I 1. 4 lean r .w.J. i~l ik l O d '/1 ~ 1 pp nl e I, It r+l I fl 1 r y . n, ii ~ I I !1 I :I...I p lep ml 1 oanv nan , i .1 ,Ik I.,.anv s r,d, I1 1 ~ Ay J 1pp1 , ,x II I 1 .. r . ,pn r..;1..J ,.. I i 1 .s pn,em .Ia.Vn. +..J~J J• IJ•xle.k Iwmy sor d, - r., I; pare en _Iwpa a, ...,./JM ~ ~ J O Ar ~ + .wr /v 1 J I ) I„ - i I n, ^'~' Lrai ...I yl, 1~1 i ' i - 1 ., II I ` . d ~ - I n' yl 1 p C ~~//~~ V/ As A~ <.~ . +/ ns , ,J 1 1 'y pl r L I 1 ~ I ~Jaa ~ i ,r .,, .v J I Yc 1 I. 1 I I . •hr , r I p I .la:, J.c 1 L xy e, a. ,1, w r I s u, E rvJ.-i ~y A, c ~.:raw,r ly,pl r 1 nr la,a, 1 I :;rci ern Y,IIa am aY I, un 6 N) r« n,od<1 ` -.Ir f I 1 r. L. dYl 0.~r..1 s ~I 1 5.v bL ) i. 4 6e 1 I . Vi A." a~ld • I. I .n+n n ., I,In,I 1,,, ykP m J~ I o i p. r V+. Vf 4ss A/ylo 1 , anndy Icon t . 111 s.~ , u alw., r ! L, nnrr .. nr1 ~ a A l- Fys(n 1 d ,., IU I,rrre ,+ ,uPa;, u::.ii~l ~• IseU 1 1 1 I - y ~ y{ Au A.. / ,u n . r,dy 1 w , I l.,li: t „ u lo.. -+, cpc ., arrrJvJ ~ ~ ~ ~ f f a f .xlJV Iww i ~j naa Ifal.x... n > Ir. o ..,r, . ..iw.+., v. , .,en.,y. llr., a ,ndy sown, l5•, Iiwn~,n,L. s..l l~, 11e, lal, r n ~wiiv I„ P r }U pm,...n s. a, ~..I.J a lil a 1` I nu w,J v+ ,> ,w ..w n '~ Ira 1 - d - 1 I n - ~ 1 i. y.- + , -. v - - J - _ ~-y W V ~ ~I~a~ - R ( -d 3Y I p i roJr. i 11 II 1 i 1 .1..d V tl a- N 1 1 n Prrr rr •hPa+ Q1 d CD O ~' Ir _J I w x.Jr •w,n c I( p 1 p ~ (ua,l •a,d. loon, o IV I r.deJ I 1r: Hr r.? H - Ir 1.nr, L w Ili y,a I y ~ pe I 1 redaJ H- d I,.Jm U,v W v L1. Vn, lw:~.. J I.- r. pare am rl<,pns uad .'ro rr J,n,v '.u',r laa v Iw IU yw,. sn1 ,Iwlw•%, ur cdvJ (~ ~1 eL Lw.ll cooly loo„ Ill o ,..ri .I.n.,e+ N, [>~ Hero i.,n . NJ ro ya . r~1.1 a'a ~ I +w,Jr I .u I fh I~ trk •:, p - >t '1. lu WrA Ww ir,m I ,w x J, U n -s ff!\ H - yr nv+~lr -unJ1 1 J r,- I yc fi h d p I p: r 3i ~ r VII 1 Irav..r if swnd. 1 1 L.i< t .' ' t I 1. - 1 J- n 1 f IO r ~ I, ,n~. ~ ~ ~ My F / It ~,I .Is nvr=IIY v>••dy I 5 r~ 11 l -I. 1 : l I ~ d t . I) i I l:s A W y; I - J J w 4 pwe: o-,. .loya~s ~ a ~ / - ,1 •-1. rv.lly • urdv 1 Ill I d.•d 1i J: I I d I ifi I I d d M f J 1„ (j x r+ l i 11 • lu. l., ln, . Inl I J L ~F I.~ t t I I (. ' 4 'N A ~ 1 - V I ~V• ~ i ~` 1~ ~1 -I Y I II 1 nY :.f i L G 1 k[ I IJ - 1. (p 0~ Q If 4 ,1 l I. C •, ll e..., r ~.1 W ....-. •. r, 1..1 ,I, 4 1 .J IJ I 1 W 1 I x I- ry ly _ • F ~ 1 ..1 1 n lay ~ L L h 1 I hn(s d 1 d I 0 p W J ~ 9 ' 7. ~ (17 p+ ~ Ii.. JY I C an 1, mdr lounl F .+Ii_ Lw, ,, Lou .. -~IeA was :..nvla. G M1J Vax <v , inlw-. od.J X ~ w c NaJaw,: W Jy I(„un 0 n IU 4arce sl Was, wrw/ed ^ ll~ Ql Ir ~I /•J ({ aslclw., +.c, Y'e ;IC r, Ily r .<.s, r. Jan sY C - IV ro lS r.c er:•d..d ~ ~ .7 ~ r' edm ,a1dY In.n o O V.. I 1 ,.r LY :niwrU =•n,lY low, W L 1 M, wdY I~ I', to svr.a, :I V1,r. 0 C Q _ . a.x.dy t•.n , ., .« r ,I,n .. ,Jel Jmn, •iw„ Jkea ,lawn ,I ~ ~ • I-j ~ wrl,.x w.JV Iw•m I 1 ...,. I Mw M--,,. -., ' n.. wanodkea ,,.I 1r,on a•>da . ~ ~ (P ` 0 C L traa In w,s sanJV low I!) c IW vdad MdHl . ndy t m a parcem slope. rednd rJa J, sor W:li w'h,se S,we sandy loom, : to L pmcrnr .Inpa ' pi K .y ~ f_r L (.raulrw ordv low IJ rv G par..ns siwp;a µyt.: Mwli s.rr s Y I-a . A r, IU c< r slvs av, nrwla,. WsE'i W Wf, 1 .`.,ura ar dy lawn J [n L ymcs+n ~ a riad v ip „r lsH Craadmua stir Isom ~ u 5pmcoal slays; Mdt%.! Madraur. sondr loam, IU :v IS yarcenr mo(A;. <rodad :. .n,re >swa >w+J/ leom, 0 V pcrcunr al oVa'. c O rn ~ N ~ <rf , .t„ ,., aim.nx a,ll 1„wn, to Irr pa,; .mr !<, l.NI Iha ASUdrs+ anJy I.. IF `~ p.,,. e,. •I..p... r„d.:J 1lunsoclna ;crl: W.: W:L. vA„ . u aw,Jr 1.,. h., IU p rn,l vlar,w .+1.•J 'M~n re lrax< su1Jr Iuw,, V) r,r ,rJ par am slnna... (p yy ~ 11.ft Eh,rtmro IunnrY vnnd, n h parcxn .I.,p•.a Mff1 M.~rr.diw+ sa1Jv I.nxn, i 1. C: par~anr sl win. 'Ntr vA.l l.. $rorti sir loom, 2 ru b prr~vns Ylonns ti Q V [' 3. I)wrlw I y J L-- I.V 1 1 Mf11[ A YodV udy l' 1 VGV I owlet W 1 vfl le. I vex J 1 r„,I as,a. ~~ w ~rE 1) C ~ Y nd L I(p _ I CVartw I 1(l l 1 I l I N.K. IAII M ad a-,dr I a lU P 1 p n lr 1 .kJ l 1 l l Ww I i ., Ir ,. .I•. W14 ro o a , ~ d ~ l\ / ynrcan a• ryae a.x Ur wn .n l . .,.-, . . sy, ,~ w n ~ p y . I d] N ~ C I l .1 J 1 7 I 1 ME~2 IA11 MV od d I 10 IS p -Icp a r„ded .4 J 1 I> p I r a W+.1 par.mr slupre. ^ A ,e Wllkva au ye.carn r O O `~ t 137 L. r, 1 e I 1 < p I V 1..J ' rkt F3 M.. 1 vail ml - G p ~a - Wit wnka I 11 ra fr pnrca .l al,.,es ~ tr ) I r. I. 1+., 1' 1 I h r I M4N ru~WJ e o pmra sl rMVWw Yura,.tl a Wr vlvr stw ur dY Iwo tn~1 Lnon f,n aundr Iw 0 rw IV pa a slWa. crvded µJ~_ Matadan yrevelly s y lar L ,o IU para nr siWC. ~ [nC).' Envn ilna aandv I.,am, ICl Iv 1'. p.. ~anr si.pcs, erwaad µJ( EAwvwinn gra.al ly sondr Isom, 6 ra NI ymcan, slwVcs. •x ~:•lud MaH May Wan s,lt lu. , •. er, alu/., FvP I~rn, villa .waJY lo.-.m, ? O percen MYO~ Moya.lon .,Ir Ivan, ,n fi p9 corn slopes, . wau r Foul •-~xo.llle sawly Ivum, _'. r, pm<en, rlapas, modad Mv( Marudo~. sllr I<, o,n, rhm, G ry 10 tarcam slVpo, l a~:' F~w nvillx xxrJy I..an, r.. ICi nal. el, sIW' n,x1aJ MY(- MaYwdm stir lo.m rinr IUP «e slnyc~, rvdnJ M;I". I+b r..i.n, •llr 1... ,rhrn, I(I Sa I',p ,a.~l at wl N U~Q • • • • • Title: USDA Soil Survey Map (Wake County, 1970) Project: Lufkin Road and Ten Ten Road Roadway Improvements ~ Kimley-Horn Apex, North Carolina ^ ~ ^ and Associates Inc. Date: Scale: Project No. Figure: 3/6/07 NTS 011200019 3 •~~~~~~~~~~~~~~~~~~~~~~~ii~t~~~~~~~~~~~i~~~~~ r 0 0 d ~~ ~~ ~~~ ~n~ ~~~ 4 APPROXIMATE SCALE IN FEET 400 0 400 i` NATIONAL FL000 INSURANCE PROGRAM FIRM FLOOD INSURANCE RATE MRP WAKE COUNTY, NORTH CAROLINA AND ` INCORPORATED AREAS PANEL 492 OF 810 ISEE MAP INDEX FOR PANELS NOT PRINTED) PO CONTAINS: COMMUNIT9 NUMBER PANEL SUFFIX !. APEX, TOWN OF 370461 0492 E CART, TOWN OF 370238 0492 E UNINCORPORATED AREAS 310368 0492 E PANEL LOCATIpN i l sa MAP NUMBER: 3118300492 E EFFECTIVE DATE: MARCH 3, 1992 \ ~I Federal Emergency Management Agency \ ~ ~~ I~ ~. ~-i • ---~ l • • • = o ~ ~ , Y • y~ • • ~ .Town of Apex ~ctraterritorial Jurisdiction . 310461 . \ • 1 ~ D • o~ 1 ~i, _ CORPORA °`\. '~, ,;' Town of Apex Extraterritorial Jurisdiction 310461 ZONE X To determine if Flood insurance is available, contact an insurance agent or call the National flood Insurance Program at (800) 638-6620. 4 APPROXIMATE SCALE IN FEET 400 0 400 NATIONAL FLOOD INSURANCE PROGRAM FIRM FLOOD INSURANCE RATE MAP WAKE COUNTY, NORTH CAROLINA AND INCORPORATED AREAS PANEL 4910E 810 (SEE MAP INDEX FOR PANELS NOT PRINTEDI CONTAINS: COMMUNITY NUMBER PANEI SUFFIX APEX, TOWN OF 370461 0491 E UNINCORPORATED AREAS 370368 0491 E PANEL LOCATION MAP NUMBER: 3118300491 E EFFECTIVE DATE: MARCH 3, 1992 Federal Emergency Management Agency 1 \~ O M--+ ~ a A ~ ~ a ~ ~ o v H ••••~•••••i•••••••••S••••/••••~•••••••®•••~• __ ~~~, ~ , ~ ~ 96 ,x ~ j g~,~; ~i`i'~ ~~ ~ ~~ 6 ~ ~~~ %~b:~~~ ' o° ~/ ~ ~% i~,~ '~/ i~i /~/~~~ i~/' ~ "i i i h~~ /~ /; , / / , ~~/~i / ~~ ; ~ r ~~ sx i~~ .'~i 439 ~ i ~~~ ~~~ ~ ~ IJi~ 1~ ~! o~ ~ ~- a~ ~~z,a~,~~ ~ ~ ,,; ; ; i/' ~ ~ r ~1// ~~ ~~~ 'I ~~ 4,~~ % ~ ~ it f ~ ~ 'Qr ~~ it~ i ,~I ~ " ,yl y /~< ~ ;" m 'G i' ;~, 0 0~ ;' ~~% p L. 7i~ ~ ~~(/ ~~ ~ ' ~~? / „Y ~% ~. ,~ ~ ~ ~ ~~ l~ ~~ ~ ~' /s. [`i/ `, 1~ ` o r-~ ~ ~, ~ `~ ~~ N o 01 ~~ l6 t ~p a ~o ~~ N ~ N W L' ~ ~U m ~ c o W ~ N .o a` ~~= -_ \\~ \°_`y°~~ ~r ~~~ b ,~, 'OT ~ ~ / ~ e Scenario: Base Inlet Report Label Rim Elevation (ft) Sump Elevation (ft) Longitudinal Slope (ft/ft) Road Cross Slope (ft/ft) Area (ftZ) Inlet C Time of Concentration (min) Intercepted Intensity (in/hr) Total Intercepted Flow (cfs) Total Carryover Flow (cfs) Total Bypassed Flow (cfs) Gutter Ditch Spread (ft) CB-7 437.30 433.55 0.040000 0.060 3,917 0.81 5.00 4.00 0.41 0.12 0.01 1.31 CB-9 439.91 436.19 0.045900 0.060 8,998 0.80 5.00 4.00 0.72 0.06 0.00 1.58 CB-11 451.18 447.46 0.069800 0.037 6,379 0.94 5.00 4.00 0.85 0.35 0.06 1.88 CB-12 456.75 452.73 0.012200 0.060 24,896 0.85 5.00 4.00 1.65 0.00 0.31 3.51 CB-13 456.57 452.85 0.012600 0.060 11,346 0.76 5.00 4.00 0.76 0.00 0.04 2.14 DI-14 457.99 455.29 0.001400 0.060 14,287 0.95 5.00 4.00 1.23 0.00 0.03 4.48 DI-10 440.45 437.75 0.045900 0.060 11,788 0.95 5.00 4.00 0.95 0.03 0.12 1.82 CB-8 437.48 433.96 0.040000 0.060 8,747 0.71 5.00 4.00 0.57 0.00 0.00 1.48 PES-5 427.50 427.50 0.060 0 0.00 5.00 0.00 0.00 0.00 0.00 0.00 PES-2 427.60 427.40 0.020 0 0.00 5.00 0.00 0.00 0.00 0.00 0.00 Title: Lufin Road and Ten Ten Road Project Engineer: Elizabeth Waller, EI h:\...\drainage\stormcad\lufkin_rev6-11-07.stm StormCAD v5.6 [05.06.012.OOj 09/13/07 06:23:40 PM ©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Scenario: Base Pipe Report fb ~~ 5~'DQ.NI Upstream Node Downstream Node Label Length (ft) Upstream Invert Elevation (ft) Downstream Invert Elevation (ft) Material Section Size Constructed Slope (ft/ft) Upstream Inlet Area (ft~) Upstream Inlet CA (ft~) System C (ft~) System Flow Time (min) System Intensity (in/hr) Average Velocity (ft/s) Total System Flow (cfs) Full Capacity (cfs) Excess Full Capacity (cfs) CB-7 PES-6 P-10 40.00 433.55 432.85 Concrete 18 inch 0.017500 3,917 3,173 77,090 5.88 7.05 8.90 12.57 13.90 1.32 CB-12 CB-11 P-2 53.00 452.73 447.66 Concret 15 inch 0.095660 24,896 21,210 15,925 5.00 7.22 11.31 2.66 19.98 17.32 CB-11 CB-9 P-3 182.00 447.46 436.39 Concret 15 inch 0.060824 6,379 5,984 45,382 5.27 7.17 12.80 7.53 15.93 8.40 CB-13 CB-11 P-8 123.00 452.85 447.66 Concret 15 inch 0.042195 11,346 8,628 20,422 5.05 7.21 9.06 3.41 13.27 9.86 DI-14 CB-13 P-9 28.00 455.29 453.05 Concret 15 inch 0.080000 14,287 13,573 12,789 5.00 7.22 9.96 2.14 18.27 16.13 DI-10 CB-9 P-4 15.00 437.75 436.39 Concrete 15 inch 0.090667 11,788 11,199 11,915 5.00 7.22 10.20 1.99 19.45 17.46 CB-9 CB-7 P-7 62.00 436.19 433.75 Concrete 15 inch 0.039355 8,998 7,204 66,186 5.51 7.12 11.72 10.90 12.81 1.91 CB-8 CB-7 P-12 43.00 433.96 433.75 Concrete 15 inch 0.005000 8,747 6,178 5,993 5.00 7.22 0.82 1.00 4.57 3.57 PES-5 JB-4 P-13 56.00 427.50 426.40 Concrete 24 inch 0.019643 0 0 0 5.00 0.00 10.92 22.24 31.70 9.46 JB-4 PES-3 P-14 81.00 426.20 425.20 Concrete 24 inch 0.012346 N/A N/A 0 5.09 0.00 9.03 22.24 25.13 2.89 PES-2 PES-1 P-15 127.00 427.40 425.50 Concrete 36 inch 0.014961 0 0 0 5.00 0.00 7.61 9.06 81.58 72.52 Title: Lufin Road and Ten Ten Road Project Engineer: Elizabeth Waller, EI h:\...\drainage\stormcad\lufkin_rev6-11-07.stm StormCAD v5.6 [05.06.012.00] 09/13/07 06:00:53 PM ©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Profile Scenario: Base Profile: LUFKIN PES-2 TO PES-1 Scenario: Base Z5Y Label: PES-2 Rim: 427.60 ft Sump: 427.40 ft Label: PES-1 Rim: 425.70 ft Sump: 425.50 ft 0+00 L Label: P-15 1+00 Up. Invert: 427.40 ft Dn. Invert: 425.50 ft L: 127.00 ft Size: 36 inch Station (ft) S: 0.014961 ft/ft 430.00 _ , 425.00 2+00 Elevation (ft) Title: Lufin Road and Ten Ten Road Project Engineer: Elizabeth Waller, EI h:\...\drainage\stormcad\lufkin_rev6-11-07.stm StormCAD v5.6 (05.06.012.00] 09/13/07 06:01:37 PM ©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 •••••••••••~•••••••~••••••••••••••i~~••••••• Profile Scenario: Base Profile: LUFKIN PES-5 TO PES-3 Scenario: Base (Z5 Y8A'Q S~6KM~ Label: JB-4 Rim: 433.10 ft Sump: 426.20 ft Label: pES-5 Rim: 427.50 ft Sump: 427.50 435.00 430.00 Elevation (ft) 0 425.00 00 Title: Lufin Road and Ten Ten Road Project Engineer: Elizabeth Waller, EI h:\...\drainage\stormcad\lufkin_rev3-13-07.stm StormCAD v5.6 [05.06.012.00] 04/04/07 05:24:40 PM ©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 L: 56.00 ft La~ei: r- i 4 Size: 24 inch Up. Invert: 426.20 ft S: 0.019643 ft/ft Dn. Invert: 425.20 ft L: 81.00 ft Size: 24 inch Station (ft) S: 0.012346 ft/ft Profile Scenario: Base Profile: LUFKIN DI-14 TO PES-6 Scenario: Base Label: DI-14 Rim: 457.99 ft Sump: 455.29 ft 0+00 Label: CB-13 Rim: 456.58 ft Sump: 452.86 ft ,, \ Label: CB•11 ~~ Rim: 452.25 ft ~ Label: P-9 Sump: 448.53 ft Up. Invert: 455.29 ft Dn. Invert: 453.06 ft L:26.OD K IZe:~S IAC S: 0.085769 ftlft ~ Label: P-8 Up. Invert: 52.86 ft Dn. Invert: 48.73 ft L:112.~ h Size:15 inc S: 0.03687 ftlft \\ % abel: CB-9 i i i I Rim:439.91 ft ~' ~ Sump:436.19ft ~ Label: P•3 ~ Up. Invert: 448.53 ft Label: CB•7 Dn. Invert: 436.39 ft \ Rim: 437.30 ft ~ i L:198.00 fl ~~ Sump: 433.55 ft Size:l5inch S: 0.061313 iUft Label: PES-6 Label: P-l / Rim: 433.38 ft Up.lnveri:436.19fl Sump:432.85h Dn.lnverl:433J5fl ~ ~Label:P-1D L:62.ODft S¢e:l5inch Up.lnvert:433.55ft S: 0 039355ft1ft Dn.lnved:432.8`~ft . L: 40.00 h ¢e:1 in h Title: Lufin Road and Ten Ten Road h:1...ldrainagelstormcadllufkin_rev3-13-07.stm 04/04107 05:20:21 PM 1+DO 2+DO Station (ft) 3+OD ©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 4+00 S: 0.017500 ftlft 460.00 455.00 450.00 445.00 440.00 435.00 430.00 5+00 Elevation (ft) Pro]ect Engineer; Elizabeth Waller, EI StormCAD v5.6 [05.06.012.00] Page t of t •••s•••••••••••••••s••••••••••••s~•••~•••••s Profile Scenario: Base Profile: LUFKIN CB-8 TO CB-7 Scenario: Base 440.00 Label: CB-8 Rim: 437.48 ft Sump: 433.96 ft Label: CB-7 Rim: 437.30 ft Sump: 433.55 ft 435.00 ~ L Label: P-12 Up. Invert: 433.96 ft Dn. Invert: 433.75 ft , L: 43.00 ft Size: 15 inch ' S 0 005000 ft/ft _ -- -___..... _ -____ 430.00 0+00 1+00 Elevation (ft) Station (ft) Title: Lufin Road and Ten Ten Road Project Engineer: Elizabeth Waller, EI h:\.-.\drainage\stormcad\lufkin_rev3-13-07.stm StormCAD v5.6 [05.06.012.00] 03/19/07 10:33:07 AM ©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 __ _ Profile Scenario: Base Profile: LUFKIN DI-10 TO CB-9 Scenario: Base Label: DI-10 Rim: 440.45 ft Sump: 437.75 f Station (ft) 445.00 440.00 435.00 Elevation (ft) Title: Lufin Road and Ten Ten Road Project Engineer: Elizabeth Waller, EI h:\...\drainage\stormcad\lufkin_rev3-13-07.stm StormCAD v5.6 [05.06.012.00] 04/04/07 05:18:49 PM ©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 0+00 Up. Invert: 437.75 ft 1+00 Dn. Invert: 436.39 ft L: 15.00 ft Size: 15 inch S: 0.090667 ft/ft •••••••••••••••••••~•!•••••i•••••••••••••••• Profile Scenario: Base Profile: LUFKIN CB-12 TO CB-11 Scenario: Base Label: CB-12 Rim: 456.78 ft Sump: 453.26 ft 0+00 Label: CB-11 Rim: 452.25 ft Sump: 448.53 ft i~ L Label: P-2 Up. Invert: 453.26 ft Dn. Invert: 448.73 ft L: 53.00 ft Size: 15 inch S: 0.085472 ft/ft 460.00 455.00 Elevation (ft) 450.00 445.00 1+00 Station (ft) Title: Lufin Road and Ten Ten Road Project Engineer: Elizabeth Waller, EI h:\...\drainage\stormcad\lufkin_rev3-13-07.stm StormCAD v5.6 [05.06.012.00] 04/03/07 09:19:55 AM ©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 h N a x w H `~•••••••••••••~••i••••••i•~••••••~••••••••••• LUFKIN ROAD AND TEN TEN ROAD PRE-DEVELOPMENT FIGURE ~~~ DRAINAGE AREA MAP Kimley-HornantlAssociales,lnc. ROADWAY IMPROVEMENTS 4 SCALE 1 =200 THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. ^~~ LUFKIN ROAD AND TEN TEN ROAD POST-DEVELOPMENT FIGURE ROADWAY IMPROVEMENTS DRAINAGE AREA MAP 5 Kimley-Horn and Associates, Inc. SCALE 1 "=200' THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. U:\01 1 20001 9 Lufkin Road\EXHIBITS\Lufkin_Drainaae Area Mao.dwa • • • i i ICmley-Horn ~~~ and Aasaciates, Inc. Flow Evaluation Pre-Development vs. Post-Development Project: Lufkin Road and Ten Ten Road Roadway Improvements Job Number: 011200019 Date: 3/15/07 Prepared by: EKW Checked by: AMK ('nnctantc• Rational C: Rainfall Intensities: C I (in/hr) Woods 0.25 2-yr 5.76 Grass 0.35 10-yr 7.22 Pavement 0.95 AREA 1 Pre-Development Flows Area (Ac) C A ` C Woods 12.719 0.25 3.180 Grass 7.210 0.35 2.524 Pavement 2.381 0.95 2.262 22.311 7.966 Composite C = (A ` C) /Total Area = 0.357 Q2=C`I"A= 45.88 cfs Quo=C"I"A= 57.51 cfs Post-Development Flows Area (Ac) C A * C Woods 10.696 0.25 2.674 Grass 8.677 0.35 3.037 Pavement 3.082 0.95 2.928 22.455 8.639 Composite C = (A ` C) /Total Area = 0.385 Q2=C"I*A= 49.76 cfs Quo=C"I`A= 62.37 cfs Percent Increase: Q2 = (Post-Pre)/Pre = 8% Quo = (Post-Pre)/Pre = 8% Page 1 of 3 AREA 2 Pre-Development Flows Area (Ac) C A " C Woods 0.372 0.25 0.093 Grass 0.458 0.35 0.160 Pavement 0.210 0.95 0.199 1.040 0.452 Composite C = (A " C) /Total Area = 0.435 Qz=C"I"A= 2.61 cfs Quo=C'`I"A= 3.27 cfs Post-Development Flows Area (Ac) C A * C Woods 0.372 0.25 0.093 Grass 0.457 0.35 0.160 Pavement 0.207 0.95 0.196 1.036 0.449 Composite C = (A " C) /Total Area = 0.434 Qz=C*I"A= 2.59 cfs Quo=C`I*A= 3.25 cfs Percent Increase: Q2 = (Post-Pre)/Pre = -1 Qto = (Post-Pre)/Pre = -1% Page 2 of 3 i i AREA 3 Pre-Development Flows Area (Ac) C A " C Woods 0.000 0.25 0.000 Grass 0.318 0.35 0.111 Pavement 0.034 0.95 0.032 0.353 0.144 Composite C = (A ` C) /Total Area = 0.408 Q2=C'`I*A= 0.83 cfs Quo=C*I*A= 1.04 cfs Post-Development Flows Area (Ac) Woods 0.000 Grass 0.249 Pavement 0.026 0.275 C A'C 0.25 0.000 0.35 0.087 0.95 0.025 0.112 Composite C = (A " C) /Total Area = 0.407 Qz=C"I`A= 0.64 cfs Quo=C*I*A= 0.81 cfs Percent Increase: Qz = (Post-Pre)/Pre = -22% Quo = (Post-Pre)/Pre = -22% Page 3 of 3 E"{ a x w H •~~••••••••~•••~t•••••••i•~!••~'~•~•••••r••~~• DWQ Project No DIVISION OF WATER QUALITY -GRASSED SWALE WORKSHEET I. PROJECT IN Project Name Contact Person: Swale ID: Grass Swale Length Tributary Drainage Area Impervious Area Max. Velocity from 2 Yr. Storm Max. Velocity from 10 Yr. Storm Min. side slopes Steepest Effective Slope Cover Crop 60o ft. K.7 ac. Z.O ac. LJ.78 fps ~C~_ fps ~ ; - ratio ~'la ft/ft trR.k~S (at least 100 ft. per tributary acre) (on-site and off-site drainage to the swale) (on-site and off-site drainage to the swale) (2 fps max.) (3:1 min.) (check dams may be used) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials ~KW Vegetation Plan provided on plans FiK.h1 The underlying soils are permeable and non-compacted ,EKW Swale carries only stormwater flow $KVJ Water table depth is greater than 1 foot. ~~W Plan details for the swale provided. L~1 Plan details for the inlets and outlets are provided. I~ W Check dams provided. f,,~W The operation and maintenance agreement includes annual erosion and vegetation repair, and at least twice G annual mowing. Tim The operation and maintenance agreement signed and notarized by the responsible party is provided. GRASS SWALE SYSTEM OPERATION AND MAINTENANCE AGREEMENT (3/2007) Name of Project: Lufkin Road and Ten Ten Road Roadway Improvements Address: Lufkin Road (near the intersection with Ten Ten Road) Maintenance activities shall be performed as follows: MAINTENANCE ACTIVITY FREQUENCY Post-construction monitoring-inspect for vegetation, Check after every heavy rainfall for first 6 months grading, and erosion. following construction. Remove excess sediment, especially from the Once a month and after heavy rainfalls/storms. upstream edge, to maintain original contours and grading. Inspect vegetation and revegetate the swale to Once a month and after heavy rainfalls/storms. maintain a dense growth of vegetation. Repair any erosion and regrade swale to ensure that Once a month and after heavy rainfalls/storms. the runoff flows evenly in a thin sheet through the swale. Check for damaged turf reinforcement or riprap rolling downhill. Mow grass to a 6" height. As needed during growing season (at least twice annually). Page 1 of 2 GRASS SWALE LOCATION ON SITE DESCRIBE HOW WILL IT BE ACCESSED? 1 Along the North side of Lufkin Road near the intersection with Ten Ten Road Lufkin Road I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Bruce Radford Title: Town Manaaer Address: PO Box 250, Apex, NC 27502 Phone Signatur Date: , ~ `~. ..- Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, ~~p~Q~Q,, ~ . ~VCUnq~~~ST , a Notary Public for the State of tJ U STN LA20l.1 Na., County of I~JA~E , do hereby certify that ~Q.P,(U~ IZA~~o2p personally appeared before me this 20+~ day of tJOitErv~[3~ ~0°`7 ,and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, ~G~P A. E V~~G'\ ~ ~10TA/3y <N - --~ '~OOt-Jt~ `~~ SEAL My commission expires Page 2 of 2 l ~-au-aooq Z E"~ O N a ~ a ~ ~ v v H A •••~•••••••~••••••••••••••~~•••~••••••i••••• '~ ~~; I~' _ -- z ~- g m N 1~ _-_ D ••~•••••••i••••••••••••••••••••••••••••••••• w • i • • • Worksheet for Lufkin Ditch Sta 16+85 to 20+95 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Channel Slope 0.02000 ft/ft Left Side Slope 2.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Discharge 17.74 ft'/s Results Normal Depth 1.22 ft Flow Area 3.71 ft2 Wetted Perimeter 6.58 ft Top Width 6.09 ft Critical Depth 1.26 ft Critical Slope 0.01696 ft!ft Velocity 4.78 ft/s Velocity Head 0.36 ft Specific Energy 1.57 ft Froude Number 1.08 Flow Type Supercritical GVF Input Data , Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 1.22 ft Critical Depth 1.26 ft Channel Slope 0.02000 ft/ft Critical Slope 0.01696 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 9!17/2007 12:56:16 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 0 h a U U E-~ W a v ~r Lufkin Road and Ten Ten Road Roadway Improvements Kimley-Horn and Associates, Inc. Apex, North Carolina Date: 3/15/2007 Culvert Summary Prepared by: EKW NCDOT Guidelines were referenced in the following culvert calculation. The site met the criteria for using the Urban Watershed Peak Discharge Method for calculating peak design discharge as outlined under Section VI, Hydrology, page 13. The guidelines state that if the watershed is less than 10 acres and is primarily composed of pavement, grassed shoulders and slopes, and/or other mixed surface type runoff, the rational formula should be used for discharge determination. PROPOSED 24" RCP AT STA 18+50 (Lufkin Road) A.) Is Pipe Adequately Sized? Drainage Area = 5.73 acres (,),o = 22.24 cfs Design Storm = 25 year Ozs = 25.2 cfs Pipe Size = 24 inch HW/D = 1.9 Pipe Invert Elevation = 427.5 Overtopping Elevation = 431.6 025 Elevation = 431.3 Road is not overtopped, therefore proposed 24" RCP is adequate. PROPOSED 36" RCP AT STA 15+77.5 (Lufkin) A.) Is Pipe Adequately Sized? StormCad output (Rational Method) (Table 4-3, page 18 for Secondary) StormCad output (Rational Method) (HW for culverts w/Inlet Control Nomograph) Drainage Area = 3.45 acres Q,o = 9.06 cfs StormCad output (Rational Method) Design Storm = 25 year (Table 4-3, page 18 for Secondary) Ozs = 10.3 cfs StormCad output (Rational Method) Pipe Size = HW/D = 24 0.85 inch (HW for culverts w/Inlet Control Nomograph) Pipe Invert Elevation = 431.6 Overtopping Elevation = 437.5 025 Elevation = 433.3 Road is not overtopped, therefore proposed 24" RCP is adequate. Use 36" RCP to match pipe upstream. Exhibit 11 0 Ito ,0,000 . Ift ~ t,0Q0 EXAMPLE ~ ~~' ~Z~ ~3~ ~. iSt ~ 000 a..i Lw. U.! fa'11 6~00o Q.1:o tf\ d. 144 ~ `. '. 13 L 4' ~ !!~ ~ M • f.~ 4, S 3,000 (11 :.s •~ Ito a) :.1 ~.. 2 0 0 ~ , 0 tai t.t ~.i ' 3 to• . •0 1• twt s • I o00 ~ s. . s0o t4 ~ _ _ . t.. t.oo i soo / , ... TZ 400 , e :. 300 ~*~ / i.b ~ t0 0 Y00 ~ ~ ~ LS _ _ ~ ~ W _ O s4 a ~ ~ t ._._.. _ .. 4rf ~ ~ o •~ z'' t.1 / ~ J v t' ~ ~ _ 4= u SO ~ 1.0 ~ EN CE 40 p SCALE TYPE t L0 W li W .! W < !0 tt) at».. .,t~ s c ll rr ,«..... .s =T ~ tanl•.nM t'~ ~ ~ T..w N.1. r!) « ICI Nd«t 4 u\ \tni~\t I•ali.N Uw t\rMM O ..~ O M.IN~ K ff..rN ~. 3 i11Htr.N~. la t Is Lo .7 1 T 4. 3. t- 1.0 _ !.0 .~ .t :r .t' ~ .S L .s ~- .s L .S `- I= HEADWATER DEPTH FOR ME~-OwiTE>~t SC~l.ES 2s3 CONCRETE PIPE CULVERTS ~nsm MAY ~ WITH INLET CONTROL •wtcw a n,~tc Ito.a +•x IrA ' YI-11 _,~ •~•••••~!•••••••••••!t•!!~!••i~•••••••••••#~, Scenario: Base Pipe Report 5 yF~A~2. S'i1~RWt Upstream Node Downstream Node Label Length (ft) Upstream Invert Elevation (ft) Downstream Invert Elevation (ft) Material Section Size .- Constructed Slope (ft/ft) Upstream Inlet Area (ftZ) Upstream Inlet CA (ftZ) System C (ft~) System Flow Time (min) System Intensity (in/hr) Average Velocity (fUs) Total System Flow (cfs) Full Capacity (cfs) Excess Full Capacity (cfs) PES-5 JB-4 PES-2 JB-4 PES-3 PES-1 P-13 P-14 P-15 56.00 81.00 127.00 427.50 426.20 427.40 426.40 425.20 425.50 Concrete Concrete Concret 24 inch 24 inch 36 inch 0.019643 0.012346 0.014961 0 N/A 0 0 N/A 0 0 0 0 5.00 5.09 5.00 0.00 0.00 0.00 10.92 9.03 7.61 22.24 22.24 9.06 31.70 25.13 81.58 9.46 2.89 72.52 Title: Lufin Road and Ten Ten Road Project Engineer: Elizabeth Waller, EI h:\...\drainage\stormcad\lufkin_rev6-11-07.stm StormCAD v5.6 [05.06.012.00] 09/13/07 06:01.09 PM ©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 •••!••••i!•••••~••••••~•i~•S••••••!•••!~••••=: y t~J ~d O n ~ O d ~ ~ O ~ r y w • • • • • • • • • C ~ ~ Kimley-Hom ~ and Associates, Inc. EROSION CONTROL CALCS (SKIMMER SEDIMENT BASIN) Project Information Project Name: Lufkin Road and Ten Ten Road Roadwa y Improvements KHA Project #: 011200019 Designed by: EKW Date: 3/22/2007 Checked by: AMK Date: 3/30!2007 Skimmer Basin #1 Drainage Area Total, AT= 5.73 Ac Disturbed, Ao= 3.5 Ac 10-year Runoff (Qto) C = 0.40 T~ = 5.00 min I,o = 7.08 inlhr Qta = 16.2 cfs Surface Area Required SA = 325sf x Qta SA = 5,274 sf Volume Required VR = 1800 cf/Ac x Ao VR = 6,300 cf Sediment Trap Dimensions L = 104 ft (Spillway Length) W = 52 ft (Spillway Width) D = 2 ft (Depth of Storage) Side Slopes = 2 :1 40 = Ltop = 110 ft Lbot= 96 ft Wto Wbot WtoP= 58 ft Lbot= Wbpt= 44 ft LIW Ratio= 2.0 :1 (must be 2:1 to 6:1) Elevations Description Elevation Top of Bem1 428.50 (allow 1ft freeboard above spillway flow height) Emergency Spillway 427.00 Cleanout Mark 426.00 (half of storage height) Bottom 425.00 Provided SAP= 5,408 sf > 5,274 VP = 9,632.0 cf > 6,300 Emergency Spillway - 25 Year SI I25 = 7.78 Qz6 = 17.83 cfs h = 0.5 ft C„, = 3 Lw= 17 ft (sized to pass Q25) Skimmer Basin #1 (Continued) Skimmer Size Dewatering Volume 9,632 ct Skimmer Size 2.0 in. Average Head { h }: 0.167 ft Select: Orifice Diameter { d }: Area { A }: Discharge Coefficient (C): Flowrate { O }: Draw Down Time { T }: Skimmer S¢e Head 2" 0.167 ft. 2.5" 0.167 ft. 3" 0.25 ft. 4" 0.275 ft. 5" 0.333 ft. 6" 0.417 ft. 2 in = 0.167 0.022 sq ft 0.60 O =CA sgrt(2gh) = 0.043 224,376 seconds = 2.6 2.6 ft cfs days > 1 day days < 3 days • • • ~ Kimley-FIWn C t~ ~ and Assodates, Inc. EROSION CONTROL CALCS (SEDIMENT TRAP) Project Information Project Name: Lufkin Road and Ten Ten Road Roadway Improvements KHA Project #: 011200019 Designed by: EKW Date: 3/26/2007 Checked by: AMK Date: 3!30/2007 Sediment Traa #1 Drainage Area 10-year Runoff (Qte) Surface Area Required Total, AT= 2.41 Ac Disturbed, Ao= 0.47 Ac C = 0.40 To = 5.00 min Ite = 7.08 inlhr Q~e = 6.8 cfs SA = 435sf x Qte SA = 2,969 sf Volume Required VR = 3600 cflAc x Ao VR = 1,692 cf Sediment Trap Dimensions L = 78 ft (Spillway Length) W = 39 ft (Spillway Width) D = 3 ft (Depth of Storage) Side Slopes = 3 :1 Lto = 87 LtoP = 87 ft Lbat= 63 ft Weot= 24 Wtop = 48 ft Ltot= 63 WtoP 48 Weot= 24 ft LIW Ratio= 2.0 :1 (must be 2:1 to 6:1) Elevations Description Elevation Top of Beml 439.50 (allow tft freeboard above spillway flow height) Emergency Spillway 438.00 Cleanout Mark 436.75 (haK of storage height) Bottom 435.50 Provided SAP= 3,042 sf > 2,969 VP = 5,692.5 cf > 1,692 Emergency Spillway - 25 Year S1 IZS = 7.78 Qzs = 7.50 cfs h = 0.5 ft Cw = 3 Lw= $ ft (sized to pass l]26) ••••~•~~••••~•~••••••••••••••••i•~••!!•~•••• b ~ ~ ~ b ~ ~ ~ o ~ z RIP RAP APRON SUMMARY (NYDOT Dissipator Method) Lufkin Road and Ten Ten Road Roadway Improvements Apex, North Carolina Prepared by: EIC1N Job Number: 011200019 Date: 3/15/07 1. PES-1 CULVERT: Diameter 24 inches Q,o 9.1 cfs V, 0 11.0 ft/s Zone (1-4) 2 APRON DIMENSIONS: Length 12 Width 14 Thickness 22 Class Stone B 2. PES-3 (StormCAD output) (StormCAD output) (Figure 8.06.b.1) feet (Figure 8.06.b.2) feet (Figure 8.06a) inches (Figure 8.06.b.2) CULVERT: Diameter 24 inches Q, 0 22.2 cfs V, 0 8.2 ft/s Zone (1-4) 2 APRON DIMENSIONS: Length 12 Width 14 Thickness 22 Class Stone B (StormCAD output) (StormCAD output) (Figure 8.06.b.1) feet (Figure 8.06.b.2) feet (Figure 8.06a) inches (Figure 8.06.b.2) 3. PES-6 CULVERT: Diameter 18 inches Q,o 13.3 cfs V, 0 8.8 ft/s Zone (1-4) 2 APRON DIMENSIONS: Length 9 feet Width 10.5 feet Thickness 22 inches Class Stone B (Storm CAD output) (StormCAD output) (Figure 8.06.b.1) (Figure 8.06.b.2) (Figure 8.06a) (Figure 8.06.b.2)