Loading...
HomeMy WebLinkAboutNCS000290 DMR SWrm Permit Number NCS 000290 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT RECEIVED 2015 MAY 262015 CENTRAL FILES FACILITY NAME MCIEAST-MCB Camp';`' RelBunL-- PERSON COLLECTING SAMPLE(S) M. Taylor; B. Parkin CERTIFIED LABORATORY(S) Environmental Chemists, Inc. Lab # 37729 MCIEAST-MCB CAMLEJ Lab Lab # 37807 SAMPLES COLLECTED DURING CALENDAR YEAR: (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) Part A and Part B: Specific Monitoring Requirements; Vehicle Maintenance Activity Monitoring Requirements COUNTY Onslow PHONE NO. ( 910) 451-9657 SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Outfall No. Date Sample Collected 50050 Total Flow (if app.) Total Rainfall 00556 Oil & Grease (if app.) 00530 00400 New Motor OR Used Oil Collected Non -polar Total Usage Facility Wide mo/dd/ r MG inches OWL PH ga mo gallmo OAS -005 03/30/2015 1.5016 .20 <5 N/A <5 <5 <5 <5 42 <5 <5 8.12 8.08 7.47 8.0 8.88 8.90 8.49 * See note below Average of 3800 gal/mo OAS -018 03/30/2015 0.3525 .20 <5 OHP -008 03/30/2015 1.2253 .40 <5 OHP -004 03/30/2015 0.3411 .40 <5 OFC -003 03/30/2015 0.5025 .40 <5 OTC -003 03/30/2015 0.2703 .30 <5 OWC-001 03/30/2015 0.2489 .40 <5 <5 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? lyes F--210 (if yes, complete Part B) 'MCIEAST--MCB Camp Lejeune collects and recycles used motor oil base wide to include MCAS New River. This is currently being tracked through the Pollution Abatement Section (PAS). Camp Lejeune does not track the amount of new motor oil distributed to units. Since standard operating procedures requires used oil to be collected and disposed of through the PAS, this data is representative of the amount of new motor oil usage aboard the installation from October 12014 through March 30 2015. Form SWU-247, last revised 2/2/2012 Pagel of 2 STORM EVENT CHARACTERISTICS: - Date 03/30/2015 Total Event Precipitation (inches): MCAS: 0.60" Event Duration (hours): 8 (only if applicable — see permit.) (if more than one storm event was sampled) Date 03/30/2015 Total Event Precipitation (inches): MCBCL: 0.60" Event Duration (hours): 10 (only if applicable - see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 2015 O.r .t1 (Sign u e of Permittee) ( (ate)/ Form SWU-247, last revised 2/2/2012 Page 2 of 2