Loading...
HomeMy WebLinkAbout20181097 Ver 2_Full_Task_3_Credit_Release_Request - Dogtown_4.2024_20240426    3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400   April 26th, 2024 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Daniel Dixon (ddixon@res.us, 864.567.7761) Through: Environmental Banc and Exchange, LLC We formally request a credit release for the Dogtown Riparian Buffer Mitigation Bank (DWR ID# 2018-1097v2) for completion of Task #3 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #3 and have already been approved: Dogtown Riparian Buffer Mitigation Bank Parcel As-Built Report, Dogtown Riparian Buffer Mitigation Bank Parcel Adaptive Management Plan. Approved RES Dogtown Mitigation Banking Instrument Credit Schedule. Approved Dogtown BPDP Credit Table. Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 10 98,975.637 (Additional 55% of credits generated from within pond footprint) Buffer Preservation 10 4,071.820 Signature: Attachments: 1) Approved BPDP Credit Table, 2) Approved RES Dogtown Mitigation Banking Instrument Credit Release Schedule, 3) Dogtown Credit Release Schedule, 4)As-Built Credit Table, 5) Monitoring Performance Bond Table 1. Dogtown, 2018-1097v2, Project Credits Catawba Buffer Project Area N Credit Conversion Ratio (ftz/pound) P Credit Conversion Ratio (ftt/pound) N/A N/A Credit Type Location Subject? (enter NO if ephemeral or ditch') Feature Type Mitigation Activity Min -Max Buffer Width (ft) Feature Name Total Area (ftz) Total (Creditable) Area of Buffer Mitigation (k') Initial Credit Ratio (x:l) Full Credit Final Credit Ratio (x:l) Convertible to Riparian Buffer? Riparian Buffer Credits Convertible to Nutrient Offset? Delivered Nutrient Offset: N (Ibs) Delivered Nutrient Offset: P (Ibs) Buffer Rural No In -Line Pond Restoration 0-50 3 Ponds (PA, PB, PC) 63,848 63,848 1 100% 1.00000 Yes 63,848.000 No Buffer Rural No I/P Restoration 0-50 S1 107,826 107,826 1 100% 1.00000 Yes 107,826.000 No Buffer Buffer Rural No I / P Restoration 101-200 S1(151-200) 10,221 1 10,221 1 33% 1 3.03030 Yes 3,372.933 No Buffer Buffer Rural No I/P Restoration 0-50 S2 26,465 26,465 1 100% 1.00000 Yes 26,465.000 No Buffer Rural No I/P Restoration 0-50 S3 75,836 75,836 1 100% 1.00000 Yes 75,836.000 No Buffer No Buffer Rural No I/P Restoration 0-50 DTI 32,368 32,368 1 100% 1.00000 Yes 32,368.000 No Buffer Buffer Rural No I/P Restoration 0-50 DT2 3,294 3,294 1 100% 1.00000 Yes 3,294.000 No Buffer Rural No I/P Restoration 0-50 DT3 92,742 92,742 1 100% 1.00000 Yes 92,742.000 No Buffer Rural No I/P Restoration 0-50 DT4 97,361 97,361 1 100% 1.00000 Yes 97,361.000 No Buffer Rural No I/P Restoration 0-50 Baker's Creek 87,770 87,770 1 100% 1.00000 Yes 87,770.000 No Totals: 597,731 597,731 Enter Preservation Credits Below Eligible for Preservation (ft):F 199,244 Credit Type Location Subject? Feature Type Mitigation Activity Min -Max Buffer Width (ft) Feature Name Total Area (sf) Total (Creditable) Area for Buffer Mitigation (k) Initial Credit Ratio (x:1) Full Credit Final Credit Ratio (x:1) Riparian Buffer Credits Rural No I / P 0-50 DT1, DT2, DT3, DT4, 51, S2, S3 483,424 199,244 5 100% 5.00000 39,848.800 Rural No I / P 101-200 Baker's Creek, S2, DT2, DT4, DT3 203,974 0 5 33% Rural Yes I/P 10 Rural Yes I/P 10 Rural Yes I/P 10 Rural Yes I/P 10BufferPreservation Rural Yes I/P 10 Rural Yes I/P 10 Rural Yes I/P 10 Rural Yes I/P 10 Rural Yes I/PI 1 10 Preservation Area Subtotal (ft'): 199,244 Preservation as %Total Area of Buffer Mitigation: 25.0% Ephemeral Reaches as %Total Area of Buffer Mitigation: 0.0% 1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a). last updated O1/17/2020 TOTAL AREA OF BUFFER MITIGATION (TABM) Mitigation Totals Square Feet Credits Restoration: 597,731 590,882.933 Enhancement: 0 0.000 Preservation: 199,244 39,848.800 Total Riparian Buffer: 796,975 630,731.733 TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Square Feet Credits Nutrient Offset: Nitrogen: 0 a.oao Phosphorus: o.oao DocuSign Envelope ID: C6580047-982B-4ED0-9A89-52BA73C64D21 VIII. CREDIT RELEASE SCHEDULE A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by DWR, it is agreed that the riparian buffer credits associated with the Bank Parcel will become available for sale to a third party in accordance with the Credit Release Schedule below in Table 3.0. Table 3.0 - Credit Release Schedule for Riparian Buffer Credits Credit Credit Release Task Project Milestone Release within the Pond Footprints Instrument and BPDP Approved by DWR, Draft Stream Mitigation Plan No credits released I Approved by the IRT, Conservation Easement Recorded and Assigned 25 for areas withinaccordingtoItemB (1) of Section X in this Instrument* and Financial pond footprintsAssurancePosted Mitigation Site Earthwork, Planting and Installation of Monitoring Devices No credits released 2 Completed and all Applicable Permits Obtained 20 for areas within and oot rints 3 Monitoring Financial Assurance Posted and Approval of As -Built Report 10 55 4 Monitoring Report #1: Approved by the DWR** & financial assurance 10 10 renewed 5 Monitoring Report #2: Approved by the DWR** & financial assurance 10 10 renewed 6 Monitoring Report #3: Approved by the DWR** & financial assurance 10 10 renewed 7 Monitoring Report #4: Approved by the DWR** & financial assurance 5 5 renewed 8 Monitoring Report #5: Approved by the DWR** and final site visit by 10 10 DWR has been conducted Total 100% 100% For specification, please see Section V in this Instrument DWR Approval provided upon a determination that the site is meeting performance standards contained within the approved BPDP B. DWR may modify the credit release schedules based on the information submitted or the order in which required information is received. DWR will notify the Sponsor of any modification to the credit release schedule. C. DWR may consider a Credit Release Schedule for a Bank Parcel based on the extent of change between current onsite conditions and proposed post construction conditions. D. The Sponsor must initiate implementation of the approved BPDP for the site under this Instrument in concurrence with all stream mitigation activities proposed in the approved Mitigation Plan referenced in Item D of Section IV of this Instrument. 10 As‐Built BUFFER PLAN (AS ACCEPTED 9.4) Riparian Buffer Credits (Excluding  In‐Line Pond)570,384.200 566,883.73 In‐Line Pond Credits 81,107.000 63,848.00          Approved BPDP Credits 630,731.733 Credit Release Schedule for Riparian Buffer Credits TOTAL (As-Built) Credits: 651,491.200 Task Project Milestone % Credit Release % Credit Release within the Pond Footprints As‐Built Credits Released  Credits Credit  Difference Anticipated  Release Date Released Date Notes 1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded* and Financial Assurance Posted 25%No Credits Released for Areas within Pond  Footprint 142,596.050    141,720.933    875.117            2/10/2021 2/10/2021 2 Mitigation Site Earthwork, Planting and Installation of Monitoring Devices Completed, Acceptance of Adaptive Management Plan 15%No Credits Released for Areas within Pond  Footprint 85,557.630       85,032.560       525.070            10/30/2023 10/24/2023 Credits Released  Full implementation of Supplemental Planting and Adaptive Management Plan 5%No Credits Released for Areas within Pond  Footprint 28,519.210       28,519.210        ‐                     7/30/2024 Submit w/ MY1, Credits Released currently estimated 3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10% 55% 101,647.270    103,047.457    5/30/2024 **Includes additional credits from Task 1 & 2, Credits Released currently estimated 4 Monitoring Report #1: Approved by the DWR** & financial assurance renewed 10% 10% 65,149.120       3/30/2024 5 Monitoring Report #2: Approved by the DWR** & financial assurance renewed 10% 10% 65,149.120       3/30/2025 6 Monitoring Report #3: Approved by the DWR** & financial assurance renewed 10% 10% 65,149.120       3/30/2026 7 Monitoring Report #4: Approved by the DWR** & financial assurance renewed 5% 5% 32,574.560       3/30/2027 8 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been conducted 10% 10% 65,149.120       3/30/2028 Total 100% 100% 651,491.200    226,753.493    1,400.187          Table 1. Dogtown, 2018‐1097v2, Project Credits Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter  NO if  ephemeral or  ditch 1) Feature Type Mitigation Activity Min‐Max Buffer  Width (ft)Feature Name Total Area (ft2) Total (Creditable)  Area of Buffer  Mitigation (ft2) Initial Credit  Ratio (x:1)% Full Credit  Final Credit  Ratio (x:1)   Convertible to  Riparian  Buffer?   Riparian Buffer  Credits   Convertible to  Nutrient Offset?   Delivered  Nutrient  Offset: N (lbs)   Delivered  Nutrient  Offset: P (lbs)  Buffer Rural No In‐Line Pond Restoration 0‐50 3 Ponds (PA, PB, PC) 81,107 81,107 1 100% 1.00000 Yes 81,107.000 No — — Buffer Rural No I / P Restoration 0‐50 S1 107,998 107,998 1 100% 1.00000 Yes 107,998.000 No — — Buffer Rural No I / P Restoration 0‐100 S1 (51‐100) 10,432 10,432 1 100% 1.00000 Yes 10,432.000 No — — Buffer Rural No I / P Restoration 0‐50 S2 29,074 29,074 1 100% 1.00000 Yes 29,074.000 No — — N/A — N/A — — Buffer Rural No I / P Restoration 0‐50 S3 79,886 79,886 1 100% 1.00000 Yes 79,886.000 No — — Buffer Rural No I / P Restoration 0‐50 DT1 29,425 29,425 1 100% 1.00000 Yes 29,425.000 No — — Buffer Rural No I / P Restoration 0‐50 DT2 5,387 5,387 1 100% 1.00000 Yes 5,387.000 No — — Buffer Rural No I / P Restoration 0‐50 DT3 96,783 96,783 1 100% 1.00000 Yes 96,783.000 No — — Buffer Rural No I / P Restoration 0‐50 DT4 94,390 94,390 1 100% 1.00000 Yes 94,390.000 No — — Buffer Rural No I / P Restoration 0‐50 Baker's Creek 76,291 76,291 1 100% 1.00000 Yes 76,291.000 No — — ——— ——— ——— ——— ——— ——— ——— ——— Totals (ft2):610,773 610,773 610,773.000 0.000 0.000 Total Buffer (ft2):610,773 610,773 Total Nutrient Offset (ft2):0 N/A Total Ephemeral Area (ft2) for Credit:00 Total Eligible Ephemeral Area (ft2):203,591 0.0%Ephemeral Reaches as % TABM Enter Preservation Credits Below Total Eligible for Preservation (ft2):203,591 25.0%Preservation as % TABM Credit Type Location Subject? Feature Type Mitigation Activity Min‐Max Buffer  Width (ft)Feature Name  Total Area (sf)  Total (Creditable)  Area for Buffer  Mitigation (ft2) Initial Credit  Ratio (x:1)% Full Credit  Final Credit  Ratio (x:1)   Riparian  Buffer Credits  Buffer Rural No I / P0‐50 DT1, DT2, DT3,  DT4, S1, S2, S3 478,959 203,591 5 100% 5.00000 40,718.200 Rural No I / P 101‐200 Baker's Creek, S2, DT2,  DT4, DT3 190,731 0 5 33% — — — — Preservation Area Subtotals (ft2):669,690 203,591 Square Feet Credits 610,773 610,773.000 0 0.000 203,591 40,718.200 814,364 651,491.200 Square Feet Credits Nitrogen:0.000 Phosphorus:0.0000 TOTAL AREA OF BUFFER MITIGATION (TABM) TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Nutrient Offset: Preservation: Total Riparian Buffer: Catawba Buffer N/A N/A Restoration: Enhancement: Mitigation Totals 1.  The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a). last updated 08/03/2020 DocuSign Envelope ID: C3317E77-9A0A-4742-AF62-27496979836F DocuSign Envelope ID: C3317E77-9A0A-4742-AF62-27496979836F DocuSign Envelope ID: C3317E77-9A0A-4742-AF62-27496979836F 4/25/2024 DocuSign Envelope ID: C3317E77-9A0A-4742-AF62-27496979836F DocuSign Envelope ID: C3317E77-9A0A-4742-AF62-27496979836F