HomeMy WebLinkAbout20030570 Ver 7_Stormwater Info_20160108 (3)
Strickland, Bev
From:Brian Dustin <bdustin@mulkeyinc.com>
Sent:Friday, January 08, 2016 9:02 AM
To:Smith, Cherri L
Subject:FW: Reynold Mill phase 3 - Approval Letter
Cherri,
Here is a copy of the signed approval of the SMP for Reynolds Mill Phase 3 (DWR #03-057 v7). Please let me know if
there is anything else you require for this project.
Regards,
BRIAN DUSTIN
Senior Biologist
Environmental Services
919.858.1926 direct
MULKEY ENGINEERS & CONSULTANTS
6750 Tryon Road l Cary, NC 27518 l 919.836.4800
Connect with us: Mulkey l Facebook l LinkedIn l Twitter
From: Michael Allen
Sent: Friday, January 08, 2016 7:39 AM
To: Brian Dustin <bdustin@mulkeyinc.com>
Subject: RE: Reynold Mill phase 3 - Approval Letter
Brian,
Would this satisfy DWR with regards to the approved SMP? It is the signed construction drawings for the BMPs.
Mike
From: Brian Dustin
Sent: Thursday, January 07, 2016 2:29 PM
To: Michael Allen
Subject: Reynold Mill phase 3 - Approval Letter
Please note #2 of the conditions. You must submit an APPROVED SMP to DWR prior to construction.
G:\\Project\\2011\\2011076.00\\ENV\\Permit Application\\Letters FROM Agencies
BRIAN DUSTIN
Senior Biologist
Environmental Services
919.858.1926 direct
MULKEY ENGINEERS & CONSULTANTS
1
6750 Tryon Road l Cary, NC 27518 l 919.836.4800
Connect with us: Mulkey l Facebook l LinkedIn l Twitter