Loading...
HomeMy WebLinkAbout20030570 Ver 7_Stormwater Info_20160108 (3) Strickland, Bev From:Brian Dustin <bdustin@mulkeyinc.com> Sent:Friday, January 08, 2016 9:02 AM To:Smith, Cherri L Subject:FW: Reynold Mill phase 3 - Approval Letter Cherri, Here is a copy of the signed approval of the SMP for Reynolds Mill Phase 3 (DWR #03-057 v7). Please let me know if there is anything else you require for this project. Regards, BRIAN DUSTIN Senior Biologist Environmental Services 919.858.1926 direct MULKEY ENGINEERS & CONSULTANTS 6750 Tryon Road l Cary, NC 27518 l 919.836.4800 Connect with us: Mulkey l Facebook l LinkedIn l Twitter From: Michael Allen Sent: Friday, January 08, 2016 7:39 AM To: Brian Dustin <bdustin@mulkeyinc.com> Subject: RE: Reynold Mill phase 3 - Approval Letter Brian, Would this satisfy DWR with regards to the approved SMP? It is the signed construction drawings for the BMPs. Mike From: Brian Dustin Sent: Thursday, January 07, 2016 2:29 PM To: Michael Allen Subject: Reynold Mill phase 3 - Approval Letter Please note #2 of the conditions. You must submit an APPROVED SMP to DWR prior to construction. G:\\Project\\2011\\2011076.00\\ENV\\Permit Application\\Letters FROM Agencies BRIAN DUSTIN Senior Biologist Environmental Services 919.858.1926 direct MULKEY ENGINEERS & CONSULTANTS 1 6750 Tryon Road l Cary, NC 27518 l 919.836.4800 Connect with us: Mulkey l Facebook l LinkedIn l Twitter 2