HomeMy WebLinkAboutNCS000040 DMR SW (7)CHARL4DTTE
PIPE and FOUNDRY COMPANY
P.O. Box 35430 • Telephone 704/332-2647
CHARLOTTE, NORTH CAROLINA 28235
Foundry Fax No. 332-4581
August 19, 2015
Division of Water Quality
Surface Water Protection Section
ATTN: Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
919.807.6300
RECEIVED
AUG 2 4 2015
CENTRAL FILES
DWR SECTIOA,
RE: Charlotte Pipe & Foundry Co.
Stormwater Analytical - SW004 Tier 2 Monthly Sampling
Stormwater Permit Number NCS000040
Sampling Timeframe: July 2015
Charlotte Pipe and Foundry (Charlotte Pipe) is sending this letter to
NCDENR in regard to monthly Tier II sampling requirements for SW004 and
semi-annual Yr6-P2 sampling for SW005.
For the month of July 2015, URS, our contractor, was unable to collect
stormwater samples from outfall SW004 due to drought conditions in the
area.
With the new outfall location for SW005, flow is only present in heavy rain
conditions; thus, no sample could be collected during the facility -wide semi-
annual sampling event that was conducted in June 2015. Plans were to make
another attempt at outfall SW005 during the monthly July sampling for
SW004. Due to the drought conditions, this was not possible.
As required in Tier II of the Stormwater Plan, Charlotte Pipe will continue to
monitor for all required parameters until such time as the site can
demonstate three consecutive samples that are below the benchmark values.
Please contact Jenny Pappalardo at (704) 348-5513 or David Waggoner at
(704) 348-5408 if you have any questions or need any additional information.
Sincerely,
4Q,r" n I U caepo."
Jenny L. Pappalardo
Charlotte Pipe and Foundry Co.
Environmental Engineer
CHARL40TTE
PIPE and FOUNDRY COMPANY
P.O. Box 35430 • Telephone 704/332-2647
CHARLOTTE, NORTH CAROLINA 28235
Foundry Fax No. 332-4581
June 18, 2015
Division of Water Quality
Surface Water Protection Section
ATTN: Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
919.807.6300
RE: Charlotte Pipe & Foundry Co.
Stormwater Analytical - SW004 Tier 2 Monthly Sampling
Stormwater Permit Number NCS000040
Sampling Timeframe: May 2015
RECEIVED
JUN 19 2015
CENTRAL FILES
DWR SECTION
Charlotte Pipe and Foundry (Charlotte Pipe) is sending this letter to
NCDENR in regard to monthly Tier II sampling requirements for SW004.
For the month of May 2015, URS, our contractor, was unable to collect
stormwater samples from outfall SW004 due to weather conditions.
As required in Tier II of the Stormwater Plan, Charlotte Pipe will continue to
monitor for all required parameters until such time as the site can
demonstate three consecutive samples that are below the benchmark values.
Please contact Jenny Pappalardo at (704) 348-5513 or David Waggoner at
(704) 348-5408 if you have any questions or need any additional information.
Sincerely,
Jenny L. Pappalardo
Charlotte Pipe and Foundry Co.
Environmental Engineer