Loading...
HomeMy WebLinkAboutNCS000040 DMR SW (6)Additional Outfall Attachment Outfall No. _SWO04 Is this outfall currently in Tier 2 (monitored monthly)? Yes ® No ❑ Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No 0 * = Values for copper and zinc are net deductions from sample analytical results from upgradient outfall SW -003 SW U-264-Generic-25May2010 Total Rainfall, inches inches Oil and Grease (mg/L) Chromium lug/L) Total Kjeldahl Ni Copper (uglL) Parameter, (units) Lead Nickel Zinc Phenol (ug/L) (ug/L) (ug/L) (mg/L) Total pH Suspended (s.u.) Solids (TSS) (m /L) Chemical Oxygen Demand (mg/L) Benchmark Date Sample Collected, mm/dd/yy 5/15/2014 N/A 2.11 30 ND 1000 ND 20 3.2 7 0.0* 30 6.0 260 ND 67 82.1* 4.5 0.13 100 29.2 6-9 7.1 120 26.0 7/21/2014 1.30 ND ND ND 0.0* 2.4* ND 185.5* 0.026 0.9* 7.1 72.0 9/24/2014 0.19 N D 6.2 N D 15.5* 23.4 5.2 345.2* 0.06 55.4 6.9 27.0 11/17/14 0.67 ND ND 0.38* 4.1* 10.1* ND 154.7* 0.018* 15.8* 6.9 0.0 12/16/14 0.11 ND ND 1.1 3.6* 19.6 17.5 190.5* 0.057 36.0 7.1 85.0 1/12/15 0.82 ND ND ND 0.0* ND ND 19.7* ND ND 7.7 ND 0 * = Values for copper and zinc are net deductions from sample analytical results from upgradient outfall SW -003 SW U-264-Generic-25May2010 I certify, under penalty of law,; that this document,and all attachments were prepared under my direction or supervision in accordance with a_ system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person . or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,'to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,": including the possibility of fines and imprisonment for knowing violations." Signature Date Mail Annual DMR Summary Reports to: DWQ Regional Office Contact Information: