Loading...
HomeMy WebLinkAboutNC0069841_Permit (Issuance)_20240426DocuSign Envelope ID: 3936AE55-E4D9-4C74-8F9C-3B39D04BCDE9 ROY COOPER cfferrtvr ELIZABETH & EISER Secretary RICHARD E_ ROGERS, IR. raIII Nt7Is r H C::` RD-INA E'nvfronmenfat Quality April 26, 2024 Mr. Thomas Mann, CIP Program Manager Union County Water 500 N. Main St. Suite 600 Monroe, North Carolina 28112 SUBJECT Authorization to Construct A to C No. 069841A03 Union County Water Crooked Creek WRF NPDES Permit No. NCO069841 A letter of request for an Authorization to Construct was received April 17,2024, by the Division of Water Resources (Division). With additional information received on April 18, 2024, final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 1.9 MGD Crooked Creek WRF, with discharge of treated wastewater into the Crooked Creek in the Yadkin Pee -Dee Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: • Three (3) two (2) duty and one (1) standby, in -series UV light disinfection banks, each consisting of eight (8) lamps and rated for2.5 MGD at peak hourly flow. • All necessary piping and controls (if applicable); in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO069841 issued effective August 1, 2018, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NCO069841. It is the Owner's responsibility to ensure that the as -constructed project meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C. D_E North Ca oIra Deputiti 2cdF2m+ �ar,atAlQuibly I Dnai mofWdaResomes �� 512North SUkburyStieet 1 1611M2Savice Cade I Rahi North Caroluw27699-1611 NORTH CAROLINA 919.7079000 Department of Environmental quality DocuSign Envelope ID: 3936AE55-E4D9-4C74-8F9C-3B39D04BCDE9 April 26, 2024 Page 2 of 4 The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number 336-776-9800, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. The Engineer's Certification form is included with this submittal. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. All ORC site inspections must be documented in a log to be on -site and available for review at all times. A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. DocuSign Envelope ID: 3936AE55-E4D9-4C74-8F9C-3B39D04BCDE9 April 26, 2024 Page 3 of 4 You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in compliance with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ori Tuvia at telephone number (704) 235-2190 or by email at Ori.Tuvia@deq.nc.gov. Sincerely, Ev DocuSigned by: b+S V bW kuA, CE9CD2D3C45B4D4... by Douglas Dowden Environmental Programs Supervisor II Industrial Permitting Unit Division of Water Resources cc: NPDES Files ecopy: Michael Parker, PE Hazen and Sawyer Email: mparker@hazenandsawyer.com DWR Mooresville Regional Office, Water Quality Programs cc: Union County Health DocuSign Envelope ID: 3936AE55-E4D9-4C74-8F9C-3B39D04BCDE9 Union County Water Crooked Creek WRF Authorization to Construct No. 06984IA03 Issued April 26, 2024 NPDES Permit No. NC0069841 Engineer's Certification ❑ Final Engineering Certification / ❑ Partial Engineering Certification (mark all that apply) I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Mebane Wastewater Treatment Plant, located in Alamance County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction of : ❑ Three (3) two (2) duty and one (1) standby, in -series UV light disinfection banks, each consisting of eight (8) lamps and rated for2.5 MGD at peak hourly flow. ❑ All necessary piping and controls (if applicable); in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantia compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Date Registration No. Mail this Certification to: Attn: Ori Tuvia NPDES Industrial Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617