Loading...
HomeMy WebLinkAboutNCS000008 DMR SW (3)RECEIVERENR/®ffl JAN 2 2 2015 Water Quality Regional ®eons Section Storm Water Prevention Plan Fortress Wood Products, Inc. Elizabeth City, NC STORM WATER DISCHARGE OUTFALL (SDO) SUMMARY DATA MONITORING REPORT (DMR) Calendar Year 2014 Individual NPDES Permit No. NCS000008 or Certificate of Coverage (COC) No. NCG This monitoring report summary of the calendar year is due to the D WQ Regional Office no later than March 1St of the following year. Facility Name: Fortress Wood Products, Inc., 899 Foreman Bundy Road, Elizabeth City, NC 27909 County: Pasquotank Phone Number: (252) 264-2466 Total number of SDOs monitored: 4 Outfall No. 1 Is this outfall currently in Tier II (monitored monthly)? Yes [X] No a Was this outfall ever in Tier II (monitored monthly) in the past year? Yes [X] No a If this outfall was in Tier II for the last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency a Received approval from DWQ to reduce monitoring frequency Q Other Was this SDO monitored because of vehicle maintenance activities? Yes a No [X] Page 1 of 4 Parameter, (units) Total Ammonia Copper Tier II Monthly Rainfall, BODS COD Total total TSS pH Inches (5 day) Nitrogen recoverable (Non-Trout) Benchmark N/A 30 120 7.2 0.007 100 6-9 Date Sample Collected, mm/ddlyyyy Tier II December 2014 No Flow Page 1 of 4 Storm Water Prevention Plan Fortress Wood Products, Inc. Elizabeth City, NC Outfall No. 2 Is this outfall currently in Tier II (monitored monthly)? Yes [X] No a Was this outfall ever in Tier II (monitored monthly) in the past year? Yes [X] No a If this outfall was in Tier II for the last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency Received approval from DWQ to reduce monitoring frequency Q Other Q Was this SDO monitored because of vehicle maintenance activities? Yes a No [X] Outfall No. 3 Is this outfall currently in Tier II (monitored monthly)? Yes [X] No a Was this outfall ever in Tier II (monitored monthly) in the past year? Yes [X] No a If this outfall was in Tier II for the last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency Q Received approval from DWQ to reduce monitoring frequency Q Other Q Was this SDO monitored because of vehicle maintenance activities? Yes a No [X] Parameter, (units) Parameter, (units) Ammonia Copper Total Tier Il Monthly Ammonia Tier II Monthly Rainfal BODS Total Copper (5 COD Nitrogen total TSS pH N/A 30 120 Inches day) Non -Trout recoverable Benchmark N/A 30 120 7.2 0.007 100 6-9 Date Sample Collected, December 2014 mm/dd/yyyy No Flow Tier II December 2014 No Flow Outfall No. 3 Is this outfall currently in Tier II (monitored monthly)? Yes [X] No a Was this outfall ever in Tier II (monitored monthly) in the past year? Yes [X] No a If this outfall was in Tier II for the last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency Q Received approval from DWQ to reduce monitoring frequency Q Other Q Was this SDO monitored because of vehicle maintenance activities? Yes a No [X] Page 2 of 4 Parameter, (units) Total Ammonia Copper Tier Il Monthly Rainfall, BOD5 COD Total total TSS pH Inches (5 day) Nitrogen recoverable Non -Trout Benchmark N/A 30 120 7.2 0.007 100 6-9 Date Sample Collected, mm/dd/yyyy Tier II December 2014 No Flow Page 2 of 4 Storm Water Prevention Plan Fortress Wood Products, Inc. Elizabeth City, NC Outfall No. 4 Is this outfall currently in Tier II (monitored monthly)? Yes [X] No a Was this outfall ever in Tier II (monitored monthly) in the past year? Yes [X] No a If this outfall was in Tier II for the last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency a Received approval from DWQ to reduce monitoring frequency Q Other Was this SDO monitored because of vehicle maintenance activities? Yes a No [X] Outfall No. 5 Is this outfall currently in Tier II (monitored monthly)? Yes [X] No a Was this outfall ever in Tier II (monitored monthly) in the past year? Yes [X] No a If this outfall was in Tier II for the last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency a Received approval from DWQ to reduce monitoring frequency Other Q Was this SDO monitored because of vehicle maintenance activities? Yes a No [X] Total Parameter, (units) Rainf Ammonia Copper Tier II Monthly all, BODS Total COD total TSS pH Inch (5 day) Nitrogen recoverable es Non -Trout Benchmark NIA 30 120 7.2 0.007 100 6-9 Date Sample Collected, Collected, mm/dd/yyyy mm/ddlyyyy Tier II December 2014 Tier II No Flow No Flow Outfall No. 5 Is this outfall currently in Tier II (monitored monthly)? Yes [X] No a Was this outfall ever in Tier II (monitored monthly) in the past year? Yes [X] No a If this outfall was in Tier II for the last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency a Received approval from DWQ to reduce monitoring frequency Other Q Was this SDO monitored because of vehicle maintenance activities? Yes a No [X] Page 3 of 4 Total Parameter, (units) Rainf Ammonia Copper Tier 11 Monthly all, BODS COD Total total TSS pH Inch (5 day) Nitrogen es Non-Trout)recoverable Benchmark N/A 30 120 7.2 0.007 100 6-9 Date Sample Collected, mm/ddlyyyy Tier II December 2014 No Flow Page 3 of 4 I certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Responsible Official Signature: Qt==3A— Printed Name: James Dudley Title: President, Fortress Wood Products, Inc. Date: _ January 19. 2015 Page 4 of 4