Loading...
HomeMy WebLinkAboutSW6100701_Email_20240416 Peck, Kaitlin From: Farkas, Jim J Sent: Tuesday, April 16, 2024 3:45 PM To: hccinvestments@nc.rr.com;jnobles@Ikanda.com Cc: svc_post_construction_stormwater; Joyner, Melissa Subject: RE: SW6100701; Traemoor Village (Cumberland) - Renewal Attachments: Cover Letter & Permit 4-16-24.pdf Good Afternoon, The Division of Energy, Mineral, and Land Resources(DEMLR), received a complete 8-year Stormwater Management Permit Renewal Application for the subject project on January 17, 2024. We are forwarding renewed, updated, and re-issued Permit No. SW6100701, dated April 16, 2024, as attached.This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee,Jackie Hairr, at the following address(NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): HCC Investments, LLC Attn:Jackie Hairr, Manager 3077 N. Main Street Hope Mills, NC 28348 We will hold onto our hard copy of this project for 30 days(in case any issues/typos with the permit are noticed and corrections need to be made) after which point, it will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact us at postconstruction@deq.nc.gov. Thanks, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov D- E NORTH CAROLINA7.AM Q ki ; Department of Environmental quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Wednesday,January 17, 2024 9:21 AM To: hccinvestments@nc.rr.com Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: SW6100701;Traemoor Village (Cumberland) -Renewal Good Morning, We received your post-construction stormwater permit renewal application for the subject project on 11/30/23. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deq.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected,the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW6100701 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstruction@deq.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov 2 NORTH CAROLINA Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin Sent:Wednesday,January 10, 2024 11:42 AM To: hccinvestments@nc.rr.com Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject:Traemoor Village; Hope Mills, Cumberland County Good Morning, We received your application for a post-construction stormwater permit renewal on 11/30/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 2/9/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. - 1x application fee check of$505.The previously provided check has since expired. We will void and return the previously provided application fee check to the permittee at the following address, as listed on the application (unless a different return address is indicated by close of business tomorrow). HCC Investments, LLC Attn:Jackie Hairr 3077 N. Main Street Hope Mills, NC 28348 NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 3 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov NORTH CAROLINA Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 4