Loading...
HomeMy WebLinkAbout20151322 Ver 1_401 Application_20151215Ms. Karen Higgins NC Division of Water Resources 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 ENVIRONMENTAL SERVICES, INC. 1905 Ebenezer Road Rock Hill, South Carolina 29732 Phone 704-523-7225 • Fax 704-523-7226 www.environmentalservicesinc.com 23 December 2015 $ PAID RE: Pre -Construction Notification for NWP 12 (WQC# 3884) North Statesville Sewer Expansion Project City of Statesville, Iredell County, North Carolina Dear Ms. Higgins: 2p 1513�2 On behalf of the City of Statesville, North Carolina, Environmental Services, Inc. (ESI) is pleased to provide you with four (4) copies a permit application for the construction of a new sewer line located in Statesville, Iredell County, North Carolina. In addition, the permit fee ( in the amount of $240) is included in this package. Should you have any questions or need any additional information, please contact me by phone at 704-523-7225 or via email at ppetitgout(&esinc.cc. Sincerely, ENVIRONMENTAL SERVICES, INC. ' t2.-! S. Paul Petitgout Vice President Enclosures DEC 2 8 2015 FLORIDA GEORGIA NORTH CAROLINA MARYLAND m OHIO AGENT AUTHORIZATION FORM Project Name: North Statesville Sewer System Extension Project Location: Iredell County. NC (near the new 1-77 rest area) t Property Owner (or potential purchaser with option): City of Statesville The undersigned property owner (or potential purchaser of the property who currently holds a valid option, to purchase this property from the owner) does hereby authorize Envkdrimental Services, Inc. to take all necessary actions necessary for the preparation, submittal, processing, issuance, and/or acceptance of the jurisdictional determination, permit and/or certification. Signa a of the owner (otential purchaser with option) 4451 'p, 3�eS Printed Name of the Owner (94potentiall purchaser with option) /' ?"// D Date ot0wAT,, JR- r olqiii�< Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form - Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number. 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑x No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑x No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑x No 2. Project Information 2a. Name of project: North Statesville Sewer System Extension 2b. County: Iredell 2c. Nearest municipality / town: Statesville 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: City of Statesville - Larry Pressley 3b. Deed Book and Page No. Municipal Project (City of Statesville, NC) 3c. Responsible Party (for LLC if applicable): Larry Pressley 3d. Street address: P.O. Box 1111 3e. City, state, zip: Statesville, NC 28987 3f. Telephone no.: (704) 8783584 3g. Fax no.: (704) 878-3514 3h. Email address: I Ipressley@statesville.nc.net Page 1 of 10 PCN Form - Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: Same as Owner 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: S. Paul Petitgout 5b. Business name (if applicable): Environmental Services, Inc. 5c. Street address: 1905 Ebenezer Road 5d. City, state, zip: Rock Hill, SC 29732 5e. Telephone no.: (704) 523-7225 5f. Fax no.: (704) 523-7226 5g. Email address: ppetitgout@esinc.cc Page 2 of 10 B. Project'Inforniation and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): See attached table for..Tax ID's and Coordinates 1b. Site coordinates (in decimal degrees): Latitude: Longitude: 1c." Property size: 33.24 acres 2. Surface Waters r 2a. Name of nearest body of water to proposed project: • South Yadkin' River 2b.' Water Quality Classification of nearest receiving water: 127108-(9.7) 2c. River basin: Yadkin/Pee-Dee 3. Project Description 3a. Describe the existing conditions on the'site and the general Land use in the vicinity of the project at the time of this application; The project site consists of a mixture of open agricultural areas, forested areas and previously disturbed areas. Topography on the project site is gent) rolling, with elevations ranging from approximately 740 to 940 ft. above MSL. Soil types consist primarily of Clifford, Codorus,s Dandpple,, Fairyiew, RhodhissJomlin, and Udorthents. General land use in the vicinity of the.project is primarily residential " 3b.List the total estimated acreage of all existirig' wetlands on the property: 0.85 3c.� List the'total estimafed'hnear'feet of existing streams.(intermittent and perennial)'on the property:'1,405 3d. Explain the purpose,of the proposed project: The purpose of this'project is to provide sewer Infrastructure from an existing sewer stub'out located near Cranford Roadto a proposed new rest area. '3e. Desgnbe'thd overall .project in'detail, including'the'type of equipment to be;used: The'sewe'r willIrequire 9 stream` crossings and 2 wetland crossings. Typical excavationequipment will be used. 4. JurisdictionalDeterrriinations 4a.' Have jurisdictional wetland or stream` determinations by the. -Corps or State beemrequested orobtainedfor this property, roperty pro], ect includin ali prior 'hases 'in the` ast? Yes ''N No Unknown Corrtmerits: prelim PCN,Packa e , .•` _, r g 4b: If''tieA,:Corps made the jurisdictional detenr'ination, wfiait,type ' of determination was made?, `, " Orel'' Final ry 46. If yes,,`who delineated the jurisdictional'areas? Name• (if known) . Agency/Consultant Company: Other 4d:,..lf yes, 'listrthe dates of 04 Corps jurisdictionaldeterminations or State �deierininab ns and attach documentation.,, 5. Project History ; 56. Have-permits orcertifications 'been +requested or obtained for this projec(Including all prior phases) in; the past? t :DYe§' "'❑x No Unknown ' 0 5b. tf yes, explain' in detail`accordng to "help.file" instructions; 6. Future` Project Plans` " 6a. Isthis.a-phased project? .� ,�Yes, `Q:No 66. , If"' es, explain. . B. Project Information and Prior Project History 1. Property Identification Impact number corresponding with figures 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Impact #1 4758079648.000 Latitude: 35.901619 Longitude: -80.854733 Impact #2 4758947654.000 Latitude: 35.896408 Longitude: -80.858809 Impact #3 4758947654.000 Latitude: 35.891623 Longitude: -80.861638 Impact #4 4748832736.000 Latitude: 35.888831 Longitude: -80.863411 Impact #5 4746999865.000 Latitude: 35.850902 Longitude: -80.855622 Impact #6 4756094906.000 Latitude: 35.850887 Longitude: -80.854922 Impact #7 4757201334.000 Latitude: 35.850897 Longitude: -80.853581 Impact#8 4757201334.000 Latitude: 35.850754 Longitude:` -80.852098 Impact #9 4756264950.000 Latitude: 35.844334 Longitude: -80.847283 Impact #10 4756096836.000 Latitude: 35.850928 Longitude: -80.853635 'Impact #11 4757201334.000 Latitude: 35.849647 Longitude: -80.845776 A 91 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) , Temporary T W1 - Choose one Choose one Yes/No W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Weiland Impacts: 2h. Comments: See attached table for wetland impacts - 2 total wetland impacts. These wetlands will be converted from forested to herbaceous wetlands. 3. Stream Impacts 'If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f.' ;; 3g: , Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length' Permanent (P) or width ',(linear ;Temporary (T) (feet) . feet) S1 - Choose one - - S2 - Choose one - S3 - ;Choose one - - S4 - Choose one - - S5 - Choose one - ,S6 - Chooser one - - 3h. Total stream and tributary impacts 3i. Comments: See attached table for stream impacts - 9 total stream impacts. These impacts will be temporary in nature. All construction areas will be returned to pre -construction contours. There will be no permanent maintenance, crossings kept as a part of this project. Page 4 of 10 PCN Form —Version 1.4 January 2000 2. Wetland Impacts If there are wetland impacts proposed on .the site, .then complete this question for each wetland area impacted'. 2a.- Wetland impact number. Permanent (P) or Temporary (T) Wetland impact number corresponding' . withfi ures 2b. Type_ of impact 2c. Type of wetland 2d. Forested 2e.', Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact, (acres) W1 - P Impact #10 Excavation/ Conversion Bottomland Hardwood Forest Yes Corps 0.01 W2 - P Impact #11 Excavation/ Conversion Bottomland Hardwood Forest Yes Corps 0.24 2g. Total Wetland Impacts:, 0.25'. 2h.'Comments: Permanent impact results from a'conversion from forested'to herbaceous.' _3. Stream Impacts. If there are perennial or intermittentstream impacts'(including temporary' impacts) proposed.on, the site,' then complete this .,question for all stream sites impacted. 3a: `. ,Stream impact, . number ,.. Permanent(P)"or Temporary (T) J. Stream impact' - number 'co' ding .w*19ures,;: 3b: Type of impact 3c. Stream' name - _` 3d,.' Perennial (PER) or intermittents (INT)? 3e.', 3f.` , • Type of . ' Average, jurisdiction. stream ' `� wioth (feet) � 39 Impact length' (linear, feet) s , Z1 -T Impact #1, ,.Excavation UT-to.SouthYadkin� River 'PER, Corps 6 : 15 S2= T-. Impact #2 Excavation UT to South Yadkin River PER ' Corps 15; 15 Jmpact#3 .' ' ' . Excavation UT to South, Yadkin River , PER Corps .' 15-; 15 `54_-`T impact #4- �` 'Excavation UT to South Yadkin River., PER Corps,, :,,. 8 ,,. 15 °°55 = T;' Impact #5 UT to Fifth Creek' . INT, ., Corps. ',S6" T' . Impact #6,' Excavation UT t6 Fifth Creek . PER Corps .;"Impact#7 .Excavation UT to Fifth Creek�'�,'''=' 'INT°'",, Corps'' _� 2.:•,'' ,15.E -88 = T '' - Impact #8ExcavationJUT to Fifth'C,reek INT_ Corps ` 2.5 5 , S9 = T' Impact #9 , Excavation ° UT to Fifth Creek PER Corps 6 -.,, ,,. 16' " 3h.'Total stream:and tributaryimp'acts 125 3i. Comments: All stream impact`s are temporary in nature, All construction area's;wiil be returned to pre construction contours. There will be no permanent crossings for maintenance kept,as'a part of this project.,.,,' 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open, water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Tenfporary T 4b., Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one, Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If. and or lake construction proosed, the_ n complete the chart below. - 5a...: Pond ID number 5b. Proposed use or purpose of pond _ 5c. 5d. 5e., Wetland Impacts (acres) Stream Impacts (feet) Upland (acres)' Flooded " 'Filled Excavated ' Flooded Filled .Excavated P1 'Choose one . P2 Choose one 5f. Total: 59. Comments: N/A ;5h. Is a dam' high: hazard permit required? ❑ Yes ❑ No, .'', If yes, permit ID no: w. . Z[. Expected pond surface area (acres): '• 5j. ,Size of pond watershed(acres): 5k.''Me't1i6d of construction:. 6. Buffer Impacts (for DWQ) V If project will impact a protected riparian buffer, then complete the chart below: If yes, then individually list all buffer impacts -b ow.''If an 'im acts re"uire miti ation; then ` o'u MUST..fill out Section D of this form : - 6a. 'Project is in which protected basin,? Neuse Tar. -Pamlico Catawba Randleman Other: ❑ ❑ ❑ . , ❑ _ ❑ Buffer Irmpact number,= Permanent (P) or Tem ora ' T Rea "son for impact ' '.' „Stream name :. " Buffer mitigation required?� Zone.1 ; impact � ('sq6a n6 ' >, feet Zone 2 r .'impact,, (square :feet B1. - -Yes/No ' 62 _ Yes/No`� 63 " ° `YeS/k . gq 'B5 = Yes%No 66 _ YesMo 1 6h: Total Buffer Impacts:. .6i.'Comments: wA Page 5 of 10 ' .. D. Impact Justification and Mitigation 1l.' Avoidance and Minimization 1a. Specifically describe measures. taken to avoid or minimize the.proposed impacts in designing project. Impacts to wetlands and streams have been avoided to the maximum extent practicable. The sewer design presented in this permit application represents the most practicable end least environmentally damaging alternative while still maintaining the applicant's purpose and need. Completely avoiding impacts from this sewer infrastructure is not possible due to the position of streams and wetlands within the landscape. The design team has made tremendous efforts to reduce the amount of unavoidable impacts to wetlands and -streams. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through, construction techniques. The sewer alignment has• been modified where feasible. Stream channels will be traversed at the most feasible location in order to minimize impacts to wetlands and streams. Large-scale wetiand impacts will tie avoided by directional boring in areas where it is not feasible to cross the wetlands without significant damage to the ecosystem. All stream impacts will be temporary in nature. The construction areas will be returned to pre - construction contours at the completion of construction. No permanent crossings will remain (for use during maintenance of the sewer). 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Comperisatory.Mitigation for ❑ 'Yes ❑X No impacts'to Waters of the U.S. or Waters of the;State? 2b. If yes, mitigation is required by (check all tha f pply): ❑ DWQ ' ❑Corps 0 Mitigation bank 2c." If yes, which mitigation .option will be used for'this El Payment to in -lieu fee program ' project? ❑Permittee>Respon'sible.Mitigation , 3. ` Complete if Usin a Miti ation Bank, - ,r 3a. Name of Mitigation Bank: " Type. Choose.one . `Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity: ; „ Type: Choose one Quantity: 4. " Com fete if Makin. a Payment to In -lieu Fee Pro ram 4a. Approval letterfrom in -lieu fee,program is attached. ❑ Yes 4b: Stream'rriitigaiion r6quested linear feet 4c. NIf using, stream mitigation, stream temperature: -Choose one 4d..;13 uffer mitigation requested (DWQ only) square feet'' 4e. Riparian wetland mitigation requested:,"..' acres 4f.'Non=riparian wetlandImitigation_requested: acres 4g. Coastal,(tidal) wetland mitigation requested:,,'. acres . 4h. Comments: �. 5. "Complete if„lJsing,a Permittee Responsible Mitigation Plan 5a: If using a permittee responsible mitigation plan', providea description of theproposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes Q No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation -is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). N/A 6h. Comments: Page 7 of 10 E.' Stormwater Management and Diffuse Flow Plan (required by,DWQ) 1. Diffuse Flow Plan la. 'Does the project include'or is it adjacent to protected nparian'buffers identifiedYes rl ❑X No within one of the NO Ri arian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan 'included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is, the overall percent imperviousness of this project? 0 ojo 2b..Dobs this project require a Stormwater Management Plan? ❑ Yes ❑X No. 2c. If this project DOES, NOT require a Stormwater Management Plan, explain why: The' project consists of the construction of a new sewer line. No other impacts are anticipated. 2d: If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: . N/A ::q' ,2e. , Who.will be'responsible.for,the review of the Stormwater,Management Plan? 1;,,,,�'Certified Local Government Stormwater Review.: F. Supplementary Information 1': Environmental Documentation (DWQ Requirement) fa. Does the project involve an expenditure of public (federal/state/local) funds or the Yes ❑ No use of public (federal/state) land? 1b. If you answered ",yes" to the above, does the project require preparation of an State ❑X Yes ❑ No environmental document pursuant to the requirements of the National or ,(North�Carolina) Environmental Policy Act (NEPA/SEPA)? , 1 c. If you answered. "yes" to theabove, has the document review been finalized by the State Clearing ouse? -(If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑X No letter.) NRTR Submitted to NCDOT for Approval Comments: 2. Violations-(DWQ Requirement) 2a. Is the site in violation_ of. DWQ Wetland Rules (15A NCAC 2H .050.0),. Isolated. Wetland Rules (15A NCAC�2H .1300), DWQ Surface Water orWetland Standards, Ye s,' ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the factl3ermit application? ❑Yes M No ' 2c.' If you' answered "yes" to one or both of the above questions, providean explanation of the violation(s): 3. - Cumulative Impacts, (DWQ Requirement)., 3a'. 1Nilhthisprdoct (based on past and reasonably'an'ticipated future'impacts) result in Yes ❑X No additional develo menti which could im act nearby downstream water' uali p P Y q _ tY . . 3b. If you answered °yes" to the above, submit a qualitative or'.quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description.: 4. Sewage Disposal (DWQ Requirement) ,4a. Clearly detail th`e ultimate treatment methods anddisposition (non-discharge'or discharge) of wastewater generated. from the proposed.project;' or available capacity of,the subject facility: % N/A 4 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? GIS Shapefiles - Natural Heritage Element Occurrences (October 2015): Although small areas of potential habitat for dwarf flowered heartleaf (Hexastylis naniflora) did exist within the proposed right of way, no specimens of Hexastylis were noted during the survey of the area. 6. Essential Fish Habitat (Corps Requirement) 6a.Will this project occur in or near an area designated as essential fish habitat? Yes QX No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Essential Fish Habitat Mapper v3.0 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal govemments have designated as having historic or cultural preservation 0 Yes ❑X No ' status (e.g.,��National Historic Trust designation or properties significant in North Carolina history' and archaeology)? 7b. What data sources did you use to determine whether yoursite would impact historic or archeological resources? Ms. Terri Russ (ESI Archaeologist) visited .the Office of State Archaeology (NC SHPO). 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? QX Yes ElNo 8b. If yes, explain how project meets FEMA requirements: No Fill will be placed in the floodplain. Trenches will be dug to install the "sewer line and then the areas will be restored to pre -construction contours. 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Insurance Rate Maps - FIRM Panels 3710474800J,'3710475800J, 3710474700J, 3710474600J, 3710475600J, 3710475500J, alI effective March 18, 2008. S. Paul Petitgout 12-1.5-15 ApplicanVAgent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an; authorization letter from the applicant is rovided.) Page 10 of 10 \E,1. p . J ` am .' . St.rysbrp • x1 m n \ y ee.m � . ! caei �a r 61 • Ca—N u q r •e i a p t W r 31 1 L � sml.amna x Ci.nn.r.b.x 9Fbh pmject Study Area , ^ ♦ • _ i y, 3e r•a•. F xsoi. Hpagv � h BYE am. eMa.WW x�n••a•iFxC[Oi y/r�M � WYY bi•W R�.yyp•yV WD �. 1b • ey�l.Y er+•v P..e ` • 9rtr.9ai Co K OY•9 11 Vicinity Map Project ERid107.00 D ate:Nov 1-77 Rest Area -Statesville Sewer Iredell County, North CaMIRM a 1 fi t i 1 w 1. r �'1 Protect Study Area nra1MNMMr;FMupMq'/i�P^�MxLmi - � � � •, ~_` me Yeeremae�aenriYgnYa - ^•'.-,---`�. iN n�dM�gwuWYYeM�hyWkiY�e y- egp�r IVMBu�P V=,5 7 � Pmlecl: ER14107 W Project Study Area Map Date: Nov2015 '' 1-77 Rest Area - Statesville Sewer D.wadcnxd: Dena Iredell County, North Carolina Faro; 2 4' v 4 Jurisdictional Features Map 1-77 Rest Area - Statesville Sewer Iredell County, North Carolina Dale. Nov 2015 ;;ZiChkd 9.—I / 1 IA � y9 Mm �" Reject SwEY kea L / 3 ®Junwicoanal We ..d Junstlictimat Stream r s � pxquema.. Nc sow.a. om , Jurisdictional Features Map 1-77 Rest Area - Statesville Sewer Iredell County, North Carolina Dale. Nov 2015 ;;ZiChkd 9.—I u ks. O -b \ ©.vim � ` � g V \ ©.vim � ` � I 1 j r. r ' � �, � Projan Swdy Area JunWkboaal Wean Juns im ml Steam s�nrionama. ac sa..e. a.n.,,,v.r. .-X-0 ` rx an.. vpn eo,.a.n.eam� nes. cYy`. ., y. r' eauswenlaaua aonuanuevnef n�iu aArpuv�•nwww mhnr. vv.e..n� We Y�NPa�e Pm;eca ER14107.00 Jurisdicdwal Featwes Map Date: N. 2015 1-77 Rest Area - Statesville Sewer pwrJCIYW: DBII(7 Iredell Caw , NoM Carolina Figura: 3x '■nm.60 — Project StWy Area QJunsE tionat Weyand Junsrlicvonal Stream sa..a n rA Junsdcdonal Features Map I-77 Rest Area - Statesville Sewer Iretlell Conry, NNorthCerdina Date: Nw2a15 oemclra: oIVIR F gore: 3 Y^'r.y phi Judsdlcdonal Features Map 1-77 Rest Area - Statesville Sewer Iredell County, North Carolina — Aajen Study Area Junsdin..i wmand Jurisdictional Sueam DDrarNCn.: "DDI I IMPACTED WETLANDS and STREAMS - OVERALL MAP SEE SHEET 2 FOR LOCATIONS OF: IMPACT #i IMPACT #2 IMPACT #3 IMPACT#4 \. I Iti-.IS�o F { M I O i r North Statesville Sewer System Extension Statesville, North Carolina 1/0 L �. f 100 YR FLOODPLAIN CUMULATIVE IMPACT Dept. ' � &0 �5 LenJArea Impact#1 Stream 15 U. Impact #2 Stream 15Lf. SEE SHEET 3 FOR Stream 15 Lf. LOCATIONS OF: Steam 15 U. Impact#5 Stream 15 Lf. Impact#8 Stream 15 Lf. IMPACT #7 Stream 15 Lf. IMPACT #8 Stream 15 LfM IMPACT #9 IMPACT#11 <1 M I O i r North Statesville Sewer System Extension Statesville, North Carolina 1/0 L �. f 100 YR FLOODPLAIN CUMULATIVE IMPACT Dept. Type LenJArea Impact#1 Stream 15 U. Impact #2 Stream 15Lf. Impact#3 Stream 15 Lf. Impact" Steam 15 U. Impact#5 Stream 15 Lf. Impact#8 Stream 15 Lf. Impact#7 Stream 15 Lf. Impact #e Stream 15 LfM Impad Impact#10 Impact#H Total Stream Taal Wetlan j GRAPHIC SCALE .0 2000 4000 8000 1 inch = 4000ft. R. Joe Hams & Associates, Inc. Engineering • Planning • Management ma.c 2v u:esde w�. Fvltla.ac saYml �.��i IMPACTED WETLANDS and STREAMS - LOCATION MAP 1 pp �\ c �1 �1 1 \ I � I IMPACT #1 (See Sheet 4) IMPACTS#2 (See Sheet 6) / 100 YR FLOODPLAIN � 1I\ L / \ r ✓ ` 'A l IMPACT#3 \ \ \ North Statesville Sewer System Extension Statesville, North Carolina (See Sheet a)IMP/ (See Sh etl GRAPHIC SCALE (See Sheet l0) / o aoo soo ixoo / 1 inch = 600 ft. �— R. Joe Harris & Associates, Inc. Engineering • Planning • Management "��"' mevc�rwr.m mtrmru.icsulm,w� I IMPACTED WETLANDS and STREAMS - LOCATION MAP 2 •A OM IMPACT n$r: IMPACT #8 (See Sheet 18) \ IMPACTS #7 & #10 (See Sheets 16 & 22) \ IMPACT #6 (See Sheet 14) \ I IMPACT #5 (See Sheet 12) \� IMPACT #11 (See Sheet 23) lll \\ 100YR \ FLOODPLAIN �1I �J IMPACT #9 (See Sheet 20) — 1 a r - a / \ L_ North Statesville Sewer System Extension Statesville, North Carolina ,awn Br CRB Date:12-10-2015 lRer GRAPHIC SCALE 0 300 600 1200 1 inch = 600 ft. R. Joe Harris & Associates, Inc. Engineering • Planning • Management m m cw>Er ate. s� � i. �. eaa �c mu1ro� mnw IMPACT #1 PLAN VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SA" .......80 i STREAM IMPACTS (THIS VIEW): *15.0 LF NOTE: ALL TEMPORARY GRADE CROSSINGS WILL BE RETURNED TO ORIGINAL GRADE (PRE-CONSUCTION CONTOURS) & THE BANKS STABILIZED (SEE SHEET 24). North Statesville Sewer System Extension Statesville, North Carolina IMPACT #1 TEMPORARY STREAM CROSSING (INCLUDES PIPE INSTALLATION & ACCESS). *15LF STREAM TOP OF BANK GRAPHIC SCALE 0 25 50 100 1 inch = 50 ft. R. Joe Harris & Associates, Inc. Engineering - Planning • Management mmca¢ra:.�.sm m�.r ra ac vv�oeP�r¢axo IMPACT #1 PROFILE VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SA" PROP. PUMP STATION 1780 _.. _.. ... 1770 1760 0+00 --- PROP. SANITARY SEWER FORCE MAIN -- PROP. GRADE i EXIST. GRADE co O O / Xi \-,4,— STREAM BANK I STABILIZATION - LIVE STAKE (SEE DETAIL) HOR. SCALE: 50 0 25 50 1 inch = 50ft. VER. SCALE: 5 0 2.5 5 I 1 inch = 5ft. North Statesville Sewer System Extension R. Joe Harris & Associates, Inc. Statesville, North Carolina = Drawn By., CRB Date:1 —1 — 1 Rev: K Engineering •Planning •Management m em ea¢v a;.•. � a i. F.. nm. se suamr me.iw Fn nin P. pr CRR I Scale- As Shown I Sheet: 5 OF 24 _ IMPACT #2 PLAN VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SB" 4I` / �I I I 100 YR /', 0 / 100 YR 'FLOODPLAIN r ,FLOODPLAIN / L:''?.. ....../....; IMPACT #2 TEMPORARY STREAM CROSSING (INCLUDES PIPE INSTALLATION & ACCESS). `W ±15LF �S OSTREAM TOP OF BANK / PROPOSED SEWER / FORCE MAIN 10 40� STREAM IMPACTS (THIS VIEW): ±15.0 LF NOTE: ALL TEMPORARY GRADE CROSSINGS WILL BE RETURNED TO ORIGINAL GRADE (PRE-CONSUCTION CONTOURS) & THE BANKS STABILIZED (SEE SHEET 24). North Statesville Sewer System Extension I Statesville, North Carolina GRAPHIC SCALE 0 25 50 100 1 inch = 50 ft. R. Joe Harris & Associates, Inc. Engineering • Planning • Management IMPACT #2 PROFILE VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SB" Iso I i _ I 0 m EXIST. GRADE PROP SANITARY SEWS FORCE MAIN .... STREAM BANK STABILIZATION - LIVE STAKE (SEE DETAIL) 750 .__ L � i 740 23 00 941no.-- 1 i HOR. SCALE: 50 0 25 50 i1 inch = 50ft VER. SCALE: 5 0 2.5 5 1 inch = 5ft North Statesville Sewer System Extension R. Joe Hams & Associates, Inc. Statesville, North Carolina Engineering •Planning •Management Drown By CPR Dote: Y 2— — 2ni 131 Re, _ - lilm Cw@vPic Aee ro4Fn W.ac19A�(Rilt9-19w Eno/neer., CRB Scale: As Shown I Sheet: 7 OF 24 IMPACT #3 PLAN VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SB" \\ \ \\ \ \ A- ... 100YR FLOODPLAIN v 100 YR FLOODPLAIN IMPACT#3 TEMPORARY STREAM CROSSING / } \ (INCLUDES ±RSIE PF INSTALLATION & 28 S/ STREAM TOP OF BANK PROPOSED SEWER FORCE MAIN i STREAM IMPACTS CrHIS VIEW): ±15.0 LF NOTE: ALL TEMPORARY GRADE CROSSINGS WILL BE RETURNED TO ORIGINAL GRADE (PRE-CONSUCTION CONTOURS) & THE BANKS STABILIZED (SEE SHEET 24). North Statesville Sewer System Extension Statesville, North Carolina GRAPHIC SCALE 0 25 50 100 1 inch = 50 ft. R. Joe Harris & Associates, Inc. Engineering • Planning • Management memr�rnm..ve io�,wn�w.scvayem�manc IMPACT #3 PROFILE VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SB" 750 _.. . 0] 0 0 0 EXIST. GRADE PROP. SANITARY SEWER FORCE MAIN _ STREAM BANK STABILIZATION - LIVE -._-- I I I f STAKE (SEE DETA11_ .__ ' - I i I II I 740 - i I II I � i 730-_—.._— 3+00 44 I 00 I I HOR. SCALE: 50 0 25 50 1 inch = 50ft. VER. SCALE: 5 0 2.5 5 1 inch = 5ft. North Statesville Sewer System Extension R. Joe Harris & Associates, Inc. Statesville, North Carolina Engineering -Planning •Management RJH Drawn Br CRB Date: i2_1n_qniJRe, En ineer.• CRB I Scale: As Shown I Sheet: 9 OF 24 IMPACT #4 PLAN VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SY 100 YR /ill i FLOODPLAIN STREAM TOP OF i BANK / IMPACT if4 TEMPORARY STREAM CROSSING (INCLUDES PIPE INSTALLATION & / ACCESS). ±15LF PROPOSED SEWER FORCE MAIN / 444 100 YR FLOODPLAIN i y44 / o /y /* STREAM IMPACTS (THIS VIEW): ±15.0 LF GRAPHIC SCALE 0 25 50 100 NOTE: ALL TEMPORARY GRADE CROSSINGS WILL BE RETURNED TO ORIGINAL GRADE (PRE-CONSUCTION CONTOURS) & THE BANKS STABILIZED (SEE SHEET 24). 1 inch = 50 ft. North Statesville Sewer System Extension R. Joe Harris & Associates, Inc. Statesville, North Carolina Engineering •Planning •Management rown B . CRB Dote: _ _ Rev: m r car oma. � ,a i. r,., era.:� mutme mx.,vn IMPACT #4 PROFILE VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SY 760 I I i m m o 0 I i EXIST. GRADE PROP. SANITARY j 750 SEWER FORC MAIN I — STREAM BANK _ STABILIZATION - LIVE / \ STAKE (SEE DETAIL) I I � \ J I 740_..--- 56+00 ___._—L... _.... 57+00 HOR. SCALE: i 50 0 25 50 1 inch = 60ft. 730...._. _}._...... _,_. i .... VER. SCALE: _.._ 5 0 25 5 i 1 inch = 5ft. North Statesville Sewer System Extension R. Joe Harris & Associates, Inc. Statesville, North Carolina Engineering •Planning •Management Drawn By CRB Date: _ _ Rev: - - �n � cox u.c aw wt ro`�ra. ac mm�aq ®.nsu En ineer CRB Scale. As Shown I Sheet: II OF 24 IMPACT #5 PLAN VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SF" 100 YR FLOODPLAIN CENTERLINE STREAM \ ,\ TEMPORARY STREAM CROSSING (INCLUDES PIPE INSTALLATION & ACCESS). ±15LF TCLAD CSP: \-:°. .. ... ...... STREAM IMPACTS (THIS VIEW): ±15.0 LF GRAPHIC SCALE 0 25 50 ion NOTE: ALL TEMPORARY GRADE CROSSINGS WILL BE RETURNED TO ORIGINAL GRADE (PRE-CONSUCTION CONTOURS) & THE BANKS STABILIZED (SEE SHEET 24). 1 inch = 50 fL North Statesville Sewer System Extension R. Joe Hams & Associates, Inc. Statesville, North Carolina - Engineering •Planning •Management rawn By. CRB Date: _ Rev: - c+eArva:ia„•. s:: ioi.em�uo.acnue,em,em.i�s IMPACT #5 PROFILE VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SF M m 0 0 EXIST. GRADE PROP. SANITARY — / SEWER FORCE MAIN North Statesville Sewer System Extension Statesville, North Carolina STREAM BANK STABILIZATION - LIVE STAKE (SEE DETAIL) HOR. SCALE: 50 0 25 50 1 inch = 50ft. VER. SCALE: 5 0 2.5 5 1 inch = 5ft. R. Joe Harris & Associates, Inc. Engineering • Planning • Management �_ �n ae cw�x o,�...see. �oi.ranero.scauN�l m -ice IMPACT #6 PLAN VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SG" \ STREAM TOP OF BANK \ IMPACT #6 ..:' `. TEMPORARY REAM CROSSING 1'. (INCLUDESPIPE INSTALLATION & TEMP, SSE < ' — ACCESS). ±15LF / 20' SSE PROPOSED SEWER —( \ f—MIRCE MAIN \�7 FM FM FM _ ... .... —!_ I STREAM IMPACTS (THIS VIEW): ±15.0 LF GRAPHIC SCALE NOTE: 0 25 50 100 ALL TEMPORARY GRADE CROSSINGS WILL BE RETURNED TO ORIGINAL GRADE (PRE-CONSUCTION CONTOURS) & THE BANKS STABILIZED (SEE SHEET 24). 1 inch = 50 ft. North Statesville Sewer System Extension R. Joe Harris & Associates, Inc. Statesville, North Carolina _ Engineering •Planning •Management Drown By CRB Dote:Rev: — — ma, cw�raecsme m.wnxsscs�elmlmi-ixn IMPACT #6 PROFILE VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SG" i i I i i ° i i --....._._....._._.__, M PROP; SANITARY STREAM BANK SEWiR FORCE MAIN STABILIZATION -LIVE \ STAKE t}SEE DETAIL) I i i i i I 790 221+00 -... _. _.._g2 -mac HOR. SCALE: 50 0 25 50 i 1 inch = 50ft. VER. SCALE: 5 0 2.5 5 1 inch = 5ft. North Statesville Sewer System Extension R. Joe Harris & Associates, Inc. Statesville, North Carolina ? , Drawn By CRB Date: _ _ Re,- .. Engineering •Planning •Management _ � mmc.�vv�.cs:e wi.Fmerm.nc Pioglvplmrxr En sneer: CRB Scale: As Shown I Sheet: 15 OF 24 IMPACT #7 PLAN VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SH" SEE SHEET 22 FOR Y IMPACTED WETLANDS I Y Y Y Y Y Y Y Y y Y y Y y Y Y y Y I Y Y Y Y y Y Y y y y Y Y Y y Y Y Y y Y Y V y I .. Y Y Y Y Y y Y Y y Y Y Y Y Y Y Y Y Y Y Y Y LL TEMP. SSE_ Y Y y Y Y 20'SSE PROPOSED SEWER FORCE MAIN — FMFM �FAI�- _�_ Fy _ At IMPACT #3 �— _ TEMPORARY STREAM CROSSING — (INCLUDES PIPE INSTALLATION & 60 ACCESS). 315LF \ \ CENTERLINE OF STREAM �► 100 YR FLOODPLAIN -�7 �— \ STREAM IMPACTS (THIS VIEW): 315.0 LF NOTE: ALL TEMPORARY GRADE CROSSINGS WILL BE RETURNED TO ORIGINAL GRADE (PRE-CONSUCTION CONTOURS) & THE BANKS STABILIZED (SEE SHEET 24). North Statesville Sewer System Extension Statesville, North Carolina GRAPHIC SCALE 0 25 50 100 1 inch = 50 ft. R. Joe Harris & Associates, Inc. Engineering • Planning • Management IMPACT #7 PROFILE VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SH" bio Co m 0 0 EXIST. GRADE PROP. SANITARY' STREAM BANK I -LIVE I SEWER FORCE MAIN .STABILIZATION \',STAKE (SEE DETAIL) 227+00 HOR. SCALE: 790.--. ..._.....226+00 _.- ____. - 50 0 25 5o - 1 inch = 50ft. VER. SCALE: 5 0 2.5 5 1 inch = 5ft. North Statesville Sewer System Extension R. Joe Harris & Associates, Inc. Statesville, North Carolina Engineering •Planning •Management IE]hnfAYEYDmt 4sx IOI.Fvt"iSSCE9N1�OF1W Drown By CRB Date: 15,—in-9nid 15,——Reu Engineer., CRB Scole: As Shown I Sheet: 17 OF 24 IMPACT #8 PLAN VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SI" A 100 YR FLOODPLAIN CENTERLINE OF STREAM + + IMPACT #8 / + W + PROPOSED SEWER CROSSING 1890 STREAM ±5 LF %9 TEMP- SSEFkf Fig SSE - PROPOSED SEWER \ _ _---- FORCE MAIN 100 YR FLOODPLAIN i l STREAM IMPACTS (THIS VIEW): ±15.0 LF , GRAPHIC SCALE 0 25 50 100 NOTE: ALL TEMPORARY GRADE CROSSINGS WILL BE RETURNED TO ORIGINAL GRADE (PRE-CONSUCTION CONTOURS) & THE BANKS STABILIZED (SEE SHEET 24). 1 inch = 50 ft. North Statesville Sewer System Extension ;_. R. Joe Harris & Associates, Inc. Statesville, North Carolina Engineering •Planning •Management rown Br CRB I Dote: Y2-1n-2nid Rev u'rem ca¢rmmosm:,ai,eUasc m+ww�em..xr 1810 IMPACT #8 PROFILE VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SI" EXIST. GRADE PROP. SANITARY SEWER FORCE MAIN m m 0 0 North Statesville Sewer System Extension Statesville, North Carolina STREAM BANK j STABILIZATION - LIVE STAKE (SEE DETAIL) J HOR. SCALE: ._... 50 0 25 50 1 inch = 50ft. VER. SCALE: 5 0 2.5 5 1 inch = 5it. RJH R. Joe Harris & Associates, Inc. Engineering • Planning • Management IMPACT #9 PLAN VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SL" cb F►`J PROPOSED SEWER FORCE MAIN / STREAM TOP OF BANK IMPACT #9 TEMPORARY STREAM CROSSING \ (INCLUDES PIPE INSTALLATION & ACCESS).±15LF CIO STREAM IMPACTS (THIS VIEW): ±15.0 LF NOTE: ALL TEMPORARY GRADE CROSSINGS WILL BE RETURNED TO ORIGINAL GRADE (PRE-CONSUCTION CONTOURS) & THE BANKS STABILIZED (SEE SHEET 24). North Statesville Sewer System Extension Statesville, North Carolina rown By CRB Date: — — qnil R v`.:. GRAPHIC SCALE 0 25 50 100 I inch = 50 ft. R. Joe Hams & Associates, Inc. Engineering • Planning • Management M,,. rA ,Y.., Sii.NIF tIGO.SC 2.N%3).. f IMPACT #9 PROFILE VIEW - OPEN CUT SEWER LINE CROSSING STREAM "SU M m 0 0 EXIST. GRADE PROP. SANITARY SEWER FORCE MAIN. 1 STREAM BANK STABILIZATION - LIVE I STAKE (SEE DETAIL) �I 1 I HOR. SCALE 50 0 25 50 1 inch = 50ft. VER. SCALE: 5 0 2.5 5 1 inch = 5ft. North Statesville Sewer System Extension _ R. Joe Harris & Associates, Inc. Statesville, North Carolina Engineering •Planning •Management rown BIp,. CRB Dote: Rev IZI&afAVV Ilne.9mk IOI,Im Y�➢.ACA.W(�)}ryll� IMPACT #10 PLAN VIEW - WETLAND "WA" IMPACT #10 w WETLAND ±0.01 AC I W W W w w w W w I W W W W W W W w w w I w w w W W w W w W W W EMP. SSE W W W W J 2.O SSE — FIA FM 0 — JEL _ 100 YR FLOODPLAIN WETLANDS IMPACTS (THIS VIEW): 0.01 AC. North Statesville Sewer System Extension Statesville, North Carolina .1N FAjFU 7 190 k _ GRAPHIC SCALE 0 25 50 100 I inch = 50 ft. R. Joe Harris & Associates, Inc. Engineering • Planning • Management m am agr a+.s s:z w i, Fm ru. sc smgw, �.nw SEE SHEET 16 FOR TEMPORARY STREAM IMPACTS:7 CENTERLINE OF STREAM / PROPOSED SEWER J _ FORCE MAIN 100 YR FLOODPLAIN WETLANDS IMPACTS (THIS VIEW): 0.01 AC. North Statesville Sewer System Extension Statesville, North Carolina .1N FAjFU 7 190 k _ GRAPHIC SCALE 0 25 50 100 I inch = 50 ft. R. Joe Harris & Associates, Inc. Engineering • Planning • Management m am agr a+.s s:z w i, Fm ru. sc smgw, �.nw North Statesville Sewer System Extension Statesville, North Carolina GRAPHIC SCALE 0 25 50 0 1 inch = 50 ft. R. Joe Harris & Associates, Inc. Engineering • Planning • Management IMPACT #11 PLAN VIEW - WETLAND "WB" PROPOSED_ .— I PUMP STATION � O - L FM 9 I- Y Y//• Y•Y\ Y Y 41Y Y W Y Y Y Y p�W W • �� Y Y I Y ',� Y :'Y Y •Y Y Y y Y Y : Y Y Y Y Y Y .....{�.: Y Y I Y Y y Y y y Y y Y Y Y Y•Y Y Y Y Y Y Y W W Y Y W Y Y Y Y Y Y Y� W Y •Y/ Y Y Y Y Y I Y Y y Y Y Y Y Y Y Y Y Y Y Y Y I Y Y Y Y Y Y Y Y II Y .•� Y W y Y W Y Y Y Y Y Y I Y� 'f Y Y Y W Y Y Y W Y Y Y Y Y Y Y Y Y Y Y Y WI Y I W Y Y Y Y Y Y Y ry�ry Y I� Y Y Y Y Y Y Y Y Y Y Y Iy Y Y •y •y y y •y •y y •y 'Y `Y 'Y Y J y y W'.Y Y Y y y y y y y y y y Y Y � Y •� Y Y: Y W Y Y Illly Y Y Y Y Y Y Y Y Y Y. Y Iy Y 4 •Y Y Y Y Y Y W Y M YON Y W W Y Y W IY Y Y Y W W Y W Y Y Y W Y INS W Y �m Y Y Y Y W Y Y Y Y Y Y Y Y Y Y Y Y Y m y Y Y Y Y Y Y I Y wkY Y Y Y Y Y '{• y Y Y Y Y y Y y Y IY ,`...Y .. Y, W Y y� y y y y Y Y Y Y Y W W Y w I Y Y Y Y Y Y Y YI Y IMPACT#11 W Y W Y I Y T Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y WETLAND ±0.24 AC Y Y Y Y Y Y Y Y Y Y I PROPOSED SEWER Y Y rsw Y Y Y Y Y FORCE MAIN WETLANDS IMPACTS (THIS VIEW): 0.24 AC. North Statesville Sewer System Extension Statesville, North Carolina GRAPHIC SCALE 0 25 50 0 1 inch = 50 ft. R. Joe Harris & Associates, Inc. Engineering • Planning • Management NOTES FOR STREAM BANK STABILIZATION: 1. LIVE STAKES SHALL BE APPROXIMATELY Zr IN LENGTH 2. LIVE STAKES SHALL BE 05'- 1.S IN DIAMETER AT TIME /. UPON COMPLETION OF STREAM CROSSING WORK, CONTRACTOR SHALL BACKFILL OF PLANTING AND MECHANICALLY TAMP (NO SPECIFIC DENSITY) SOILS INTO PLACE AND DRESS 3. LIVE STAKES SHALL BE BLACK WILLOW OR SPECIES DISTURBED SURFACES. SPECIFIED BY COE/DHEC OR CONSULTANT 2. BEGINNING AT A POINT 7 ABOVE WATER SURFACE ELEVATION, GRASS DISTURBED 24"t 4. SPECIES SHALL BE DORMANT AT TIME OF ACQUISITION AREAS (SEED. FERTILIZER 6 STRAW MULCH) STREAM BANK TOP OF BANK AND AND PLANTING AND LOCALLY GROW WHARVESTED DISTURBED AREAS UPLAND OF STREAM. 3. INSTALL COIR FIBER NETIMAT STARTING MINIMUM IY BELOW WATER SURFACE 5. LIVE STAKES SHALL BE SPACED TO.C. ELEVATION AND EXTENDING A MINIMUM V BEYOND TOP OF BANK MINIMIM S. LIVE STAKES SHALL BE PLANTED A MINIMUM OF 18' IN SPECIFICATIONS FOR COIR FIBER NET/MAT AS FOLLOWS: DEPTH WITH NO MORE THAN 4'-8' OF STAKE EXPOSED - MIN THICKNESS OF 0.30 INCHES - 100% COCONUT FIBER AND WOVEN INTO TWINE - AVG. WEIGHTOF 20 OUNCES/SOND. LIVE STAKE DETAIL 4. COIR FIBER NET/MAT SHALL BE SECURELY HELD IN PLACE WITH USE OF WOODEN STAKES AND WIRE STAPLES (AS NEEDED). 5. INSTALL LIVE STAKES BEGINNING AT WATER SURFACE ELEVATION AND EXTENDING 2 VERTICAL FEET UP THE STREAM BANK SEE LIVE STAKE DETAIL FOR ADDITIONAL REQUIREMENTS. S. INSTALL SILT FENCE WNARE REINFORCEMENT ALONG TOP OF BANK (ADJACENT TO END OF COIR FIBER NET/MAT) FOR WIDTH OF DISTURBED SOILS. INSTALL SILT FENCE EXTEND COIR FIBER MAT REINFORCED WITH HOG 5' 1I WIREATTOPOFSANK (EDGE OF COIR FIBER NET/MAT) COIR FIBER NET/MAT GRASS (SEED, MULCH 8 FERTILIZE REMAINING DISTURBED STREAM E AREAS INCLUDING TOPS OF BANK (UNDER COIR NET/MAT LIVE STAKE (WILLOWS OR SPECIES APPROVED BY COE/DHEC) FOR FIRST 24' ABOVE NORMAL WATER SURFACE ELEVATION EXTEND COIR FIBER NET/MAT 12 -BELOW WATER SURFACE ELEVATION STREAM BANK STABILIZATION - LIVE STAKE TYPICAL. DETAIL - N.T.S. North Statesville Sewer System Extension Statesville, North Carolina tut KucK (*M 1 ort rtnrvrti, V BE USED TO REFORM TEAM BANK (STACKED). 18' OF L SHALL COVER STREAM E FACE OF ROCK STACK E OF ROCKTO ANCHOR BANK )PTK)NAL) R. Joe Harris & Associates, Inc. Engineering • Planning • Management