Loading...
HomeMy WebLinkAbout20130918 Ver 6_Reclamation Plan Report for 34821 3 S6 - 10 30 2015_20160107Wanucha, Dave From: Sent: To: Cc: Subject: CLASSIFICATION: UNCLASSIFIED Nikki, Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Thursday, January 07, 2016 11:34 AM Thomson, Nicole J; Wanucha, Dave Parker, Jerry A; Moore, Byron G; michael.wood@threeoaksengineering.com RE: Reclamation Plan Report for 34821.3.56 - 10/30/2015 (UNCLASSIFIED) Thank you for the information submitted 11/4/2015, as well as the additional information submitted 1/6/2016, pursuant to a proposed borrow site for the U-2525B project; SAW-2005-21386. The proposed borrow site is located on the north side of the U-2525B corridor, just north of Briarmeade Road near McLeansville, Guilford Co. Based on the information you submitted, including NCDOT on-site mitigation group's approval, and pursuant to permit Special Condition 25 A and B, the Corps of Engineers agrees with your determination the proposed borrow site will not result in a reduction of the reach, flow, or circulation of waters of the US including wetlands, and is in compliance with permit Special Conditions. No site visit is necessary in this case. However, the Corps is concerned about construction access for the borrow site encroaching within the adjacent on-site mitigation area, as well as sediment loading into the mitigation area from the site and proposed skimmer basin. As such, please monitor this area closely. If you have any further questions or concerns please let me know. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Thomson, Nicole J [mailto:njthomson2@ncdot.gov] Sent: Wednesday, January 06, 2016 3:09 PM To: Bailey, David E SAW <David.E.Bailey2@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Parker, Jerry A <jparker@ncdot.gov> Subject: [EXTERNAL] FW: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Please see the attached map and the below email from Byron. If you recall, this is for the proposed borrow site (aka Parcel 46) that is near the stream mitigation site. Nik From: Moore, Byron G Sent: Tuesday, January 05, 2016 1:03 PM To: Smith, Brian V Cc: Parker, Jerry A; Thomson, Nicole J; lowe, joseph g; Griffin, Randy W Subject: RE: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Thanks..l'm good with it From: Smith, Brian V Sent: Tuesday, January 05, 2016 11:16 AM To: Moore, Byron G Cc: Parker, Jerry A; Thomson, Nicole J; lowe, joseph g Subject: FW: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Byron, Please see the attached map. Thanks. Brian From: Downs, Andy [mailto:ADowns@flatironcorp.com] Sent: Friday, December 04, 2015 11:32 AM To: Smith, Brian V Cc: Fischer, Forrest Subject: RE: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Brian, See attached. I know it is rough, but it should convey the correct information. The borrow site will not encroach on the Right of Way, which contains the mitigation site. From: Smith, Brian V [mailto:bvsmith@ncdot.gov] Sent: Thursday, December 03, 2015 3:19 PM To: Downs, Andy Cc: Fischer, Forrest Subject: RE: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Andy, Can we get a revised drawing as requested below? I guess the report is showing that the proposed borrow pit will not adversely affect the stream mitigation site as far as drainage goes. I would like to see a map in the report showing the proposed borrow site limits relative to the newly constructed stream and buffer planting limits. The map in the current report shows only pre-project conditions of the stream. I want to make sure we are not encroaching on our credit area. Let me know if you have any questions. Brian From: Downs, Andy [mailto:ADowns@flatironcorp.com] Sent: Tuesday, December 01, 2015 9:30 AM To: Smith, Brian V Cc: Fischer, Forrest Subject: RE: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Brian, Any update on this parcel? 3 From: Smith, Brian V [mailto:bvsmith@ncdot.gov] Sent: Monday, November 16, 2015 10:31 AM To: Downs, Andy Subject: RE: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Right now they are dealing with the on-site mitigation designers. From: Downs, Andy [mailto:ADowns@flatironcorp.com] Sent: Thursday, November 12, 2015 10:44 AM To: Smith, Brian V Subject: Re: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Are they dealing directly with catena? Or do they have a list of questions? Thank you, Andy Downs Project Manager 704-649-6627 On Nov 12, 2015, at 10:01 AM, Smith, Brian V<bvsmith@ncdot.gov <mailto:bvsmith@ncdot.gov> > wrote: The Corps has concerns with the proximity to the on-site mitigation area. Might not be a problem, but they wanted more information. Brian From: Downs, Andy [mailto:ADowns@flatironcorp.com] Sent: Wednesday, November 11, 2015 4:46 PM To: Smith, Brian V Subject: RE: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Any update from Jerry yet? Site 46 is more pressing than the other one right now. Thanks, 4 Andy From: Smith, Brian V [mailto:bvsmith@ncdot.gov] Sent: Monday, November 02, 2015 8:48 AM To: Downs, Andy Subject: FW: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Andy, Please see Barry's attached report and note minor changes requested. I have not heard back from Jerry, but I did resend some information he requested. Brian From: Harrington, Barry W [mailto:bwharrington@ncdot.gov] Sent: Friday, October 30, 2015 2:24 PM To: Smith, Brian Cc: Harrington, Barry W Subject: Reclamation Plan Report for 34821.3.56 - 10/30/2015 Attached is the Reclamation Plan Report for the following Project: ReclamationPlanReport_34821.3.56_10-30-2015. pdf County: Guilford Project Location Description: Greensboro Eastern Loop from N. of US 70 to US 29 N. of Greensboro. Site Name: NCDOT/Parcel 46 Borrow site 5 Type Borrow This email was generated by the NCDOT ErCon (Erosion Control Management) system. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. CLASSIFICATION: UNCLASSIFIED