Loading...
HomeMy WebLinkAboutNCC241292_ESC Approval Submitted_20240425 -" .STATE o ROY COOPER // _ = Governor i ELIZABETH S.BISER `.4.,,�,,,.7 Secretary Q WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality 04-08-2024 LETTER OF APPROVAL Duke Energy Carolinas, LLC 526 South Church St RE: Project Name: Lyle Creek SW Station Project ID: CATAW-2024-0101 Acres Approved: 19.3 County: Catawba City: Conover Address: 1415 Stafford Street River Basin: Catawba Stream Classification: C: Aquatic Life, Secondary Contact Recreation, Fresh water Submitted By: Kathryn Peterson Plan Type: New Plan Dear Duke Energy Carolinas, LLC, This office has reviewed the subject erosion and sedimentation control plan. We hereby issue this Letter of Approval. Any modifications required for approval are listed in the body of the email that accompanied this attached letter. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities not explicitly exempt are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the annual permit fee. After the fee is processed,you will receive the COC. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. D_E v Q Quality I Division ,512 NorthNorthCarolina SalisburyDepartment Street 11612of MailEnvironmental Service Center I Raleigh,Northof CarolinaEnergyMineral 27699and-1Lan612d Resources NOii CAHCiI N. Department or Environmental Quality 919.707.9200 Letter of Approval Duke Energy Carolinas, LLC 04-08-2024 Page 2 of 2 Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form and on the plan, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. Sincerely, / l? Land Quality Section