HomeMy WebLinkAboutNCG030117 DMR SW (2)Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted/Z-/34-/-<
CERTIFICATE OF COVERAGE NO. NCG03 0 v o Jn-nCCr 0 301
FACILITY NAME Sd o 09( t -
COUNT Y
PERSON COLLEC7,MG SAMPLES Ir e=
LABORATORY, Lab Cert #
Comments.on sample collection -or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR r�d 1
SAMPLE PERIOD M Jan -June [July -Dec
or M Monthly', (month)
DISCHARGING TO CLASS MORW MHQW Trout MPNA
Zero -flow MWater Supply MSA
MOther
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 ->
M Nn rf1crvhnrna thic nprinrl;02
i •.
. Outfall No.
Date Sample.
Collected ,
(mo/dd/ ) "
.24-hour rainfall,
amount;,
Inches3
Total Suspend4solids•
pH,
Standard units
_
Copper
Lead :
- - ' ,
Zinc . •
Non-Pdlar_O&G/ Total Toxic
Total Petroleum s
Organics .
-Hydrocarbons
Benchmarks
. ..
. 100' mg/.Lor 50 mg/O
6.0-9.0
0.007 mg/L
0.03 mg/.L
0'.067 mg/L• -
15 mg/L 1•mg/L
"
t
1-6.6
* 4 .o
66,1
1 Monthly sampling (instead of semi-annual) must
beein with the second consecutive henchmark PYrpedanrp fnr the ramp nnrn motor
nt the camp eni fnu
'2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
S Total Toxic Organics, sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/],/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed In the General
Permit! For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
'Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Nam Print name)
Title rin Zi
�., . Signature) (Date)
.' Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L". where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L
Note: if you report o sample value In excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text
-,Part Bk Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this eriod 2
Outfall No.
Date Sample.,
ColleReiil
mo/cid/yr)
;24-hour•rainfalt. _
amoiirrt, ;Non -polar 0&G%TPH by
a -
" ` • Indies .EPd� 1664°(SGT-HEM)
=
. • '
:Total-Suspeiided-Solids _-
_
r,
:pH
Benchmarks
15. mg/L
:100 mg/L or.50 mg/12
- .6.0.— 9.0 SU
i
Footnotes from Part A also apply to this Part B
' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
�T
7N, 71,
Note:;If you report a sample value in excess of the benchmark you must lmpiiinent Tier 1, rter2, or Ter 3 responses. See General Permit teKt.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS—SEE PERMIT PART 11 SECTION B.
• 1 2 EXCIEEDANCES INA ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART It SE�710N B.
TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDE�N� FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES [ZNOE]
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE?
YES M NO
REGIONAL OFFICE CONTACT NAME:
Mail an orialhol and one COPY Of this DMR. including ONO Discharge neyofM within 30 don of mcelpt of the lab results tor at end of monitoring perlo
in the 'case of "No Dischargerevorts) to:
Division of
Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
. :..Raleigh, e gh, North Caro!Ina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
1. certify, under penalty of law, that thi
T sclocument and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properl
Vgather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the information submitted is, to the best of myknowledge and belief, true, accurate, and complete. I
-am aware
that there are significant penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations."
Permit Pate: 11/1/2012-10/31/2017
SWU-245, last revised 10/25/2012
Page 3 of 3