Loading...
HomeMy WebLinkAboutSW3231201_Response To Comments_20240424 A AMERICAN Engineering April 24, 2024 North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Stormwater Program 512 North Sailsbury Street Office 625Y Raleigh, NC 27699 Subject: Request for Additional Information Stormwater Permit No. SW3231201 The Shops at Prescot Village, Wet Pond Union County Dear Ms. Holland, Please find below the original review comments provided by the Engineering Department and each subsequent response: 1. In accordance with 15A NCAC 02H .1003(3)(b), any off-site areas (areas located outside of the project area) that drain to the SCM must be accounted for at their full build-out potential. The full build-out potential is determined by either having the property owners enter into a legal agreement limiting the amount of area and BUA draining from the offsite area to the SCM or by assuming that the off-site area is 100% BUA, its full build-out potential. Please see additional information at the end of this letter. Response: The current drainage area for PN06165441 is included in the calculation but is not assumed to be 100%BUA. This offsite drainage area that drains into the proposed SCM is accounted for in permit SW3200701, which is the pond north of Kemble St. It has been noted on the pre and post development drainage area maps that if this property is to be developed it shall have BUA directed to the pond north of Kemble St per permit SW3200701. The calculations for SW3200701 have been included with the submittal package for reference. 2. Please correct the following issues with the Supplement-EZ Form: a. Cover Page: i. Line 7, 8— Per 15A NCAC 02H .1017(10) the minimum required vegetated American Engineering Associates—Southeast, PA 8008 Corporate Center Drive, Suite 110, Charlotte, NC 28226 •704-375-2438 •www.American-EA.com setback width is 30 ft. While it is noted no surface water is on-site, please revise. Response: Lines 7& 8 have been revised on the Supplement-EZ cover page. 3. Per Wet Pond MDC 2 and Wet Pond MDC 5, please label the entrance and exit elevations of the bottom of the forebay so that it can be confirmed that the forebay entrance is deeper than the forebay exit, and the minimum 6" sediment storage is maintained. Response: The entrance and exit elevations of the bottom of the forebay have been labeled on the SCM plan, sheet C5.4 4. Provide the sizing and class for the riprap aprons on the plans to ensure compliance with 15A NCAC 02H .1003 (5) and 15A NCAC 02H .1050 (4). Please clarify if flow from C3-FES 24 was included in the sizing calculations. Response: The flow from C3-FES24 has been included in the sizing calculations. Riprap sizing has been added to the plans. 5. Please revise the maintenance easement to include the outlet of the SCM per General MDC 8 & 9. The entire footprint of the SCM system must be included in the access and maintenance easement, plus an additional ten or more feet around the SCM to provide enough room to complete maintenance tasks. Response: The maintenance easement has been revised to include the outlet of the SCM. 6. The temporary pool elevation is set by the elevation of the lowest bypass, which appears to be 509.60 in the outlet structure details but is referenced as 509.51 in the package. Please clarify. Response: The temporary pool has been changed in the package as 509.60. 7. The design volume for a wet pond is the volume that can be retained for a two to five- day period between the temporary pool elevation (set by the elevation of the lowest bypass) and the permanent pool elevation (set by the drawdown orifice) per C-3 of the Manual. This value should be able to be confirmed within the calculations, so it is recommended to include the elevation at the temporary pool within the stage storage tables. Please revise accordingly, as the water quality volume was utilized in the American Engineering Associates—Southeast, PA 8008 Corporate Center Drive, Suite 110, Charlotte, NC 28226 •704-375-2438 •www.American-EA.com drawdown calculations. Please note that due to the head decreasing as drawdown occurs, it is recommended to use H/3, which H being the driving head from water surface to centroid orifice. Response: Elevation 509.60 has been added to the stage storage table in the pond report. The water quality orifice draw down equation has been revised to use H/3. 8. Per Sheet C5.4, the bottom of sediment storage for the forebay is 502.5. Using this an incremental volume in the stage storage table between this and the bottom of sediment storage at 501.5 overestimates the volume that will be stored within the forebay. Please revise. Response: The storage has been revised in the SA/DA calculations. 9. Please clarify the lots referenced in the deed restrictions so that it can be verified that the BUA shown on the plans corresponds to the allotment of BUA, and the SCM is sized to accommodate all BUA. Response: Page 3 of the signed deed restrictions show the lots color coded so that they may be identified per the deed restriction. Sincerely, American Engineering Associates—Southeast, PA Blake Estridge, PE Project Engineer bestridge@american-ea.com American Engineering Associates—Southeast, PA 8008 Corporate Center Drive, Suite 110, Charlotte, NC 28226 •704-375-2438 •www.American-EA.com