Loading...
HomeMy WebLinkAbout20151216 Ver 1_Approval Letter Mod_20160104 3. Approved Impacts: Type of Impact Amount Approved Amount Approved Temporary Impact Permanent Impact Wetland (404) 0 acre 0.04 acre Wetland (isolated) 0 acre 0.33 acre 4. Diversion Ditches and other storm water conveyances as related to the sediment and erosion control measures shall be matted and/or stabilized to reduce sediment loss and turbidity. This includes interior/exterior slopes of sediment basins. 15A NCAC 02H .0506 (b)(3) and (c)(3) 5. Bare/fill slopes in excess of 10 feet in height and within 30 feet of surface waters shall be matted. 15A NCAC 02H .0506 (b)(3) and (c)(3) You are required to provide one copy of 6. A storm water management plan is required. the approved SMP , including plan details on full-sized plan sheets, with proof of Mecklenburg County’s approval. The approved SMP shall be submitted to the DWR 401 & Buffer Permitting Unit (1650 Mail Service Center, Raleigh, NC 27699-1650) before any impacts authorized in this certification occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from Mecklenburg County. If the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR 401 & Buffer Permitting Unit prior to the commencement of the modifications Stormwater discharge structures 7. at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks.15A NCAC 02H .0506(b)(5) 8. Use of native vegetation and other soft stream bank stabilization techniques is recommended where practicable instead of riprap or other bank hardening methods. If riprap is necessary, it shall not be placed in the streambed, unless approved by DWR 9. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 15A NCAC 02H .0506(b)(3) 10. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2) 11. The permittee shall report any violations of this Certification to the Division of Water Resources within 24 hours of discovery. . 15A NCAC 02H .0507(c) General Permit and/or Buffer Rules are) This Certification ( can be contested as provided in Articles 3 and 4 of the General Statute 150B by filing a written petition for an administrative hearing to the Office of the Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/or by calling the OAH Clerk’s Office at (919) 431-3000. 30 days for buffer/isolated Within sixty (60) calendar days () of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1)