HomeMy WebLinkAboutNCC230818_Modification Confirmation Email_20240425 Georgoulias, Bethany
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Thursday, April 25, 2024 8:13 AM
To: andrew.moore@dominionenergy.com
Cc: Georgoulias, Bethany; andrew.moore@dominionenergy.com;
KATY.D.MAYS@DOMINIONENERGY.COM; amber.liepse@hdrinc.com
Subject: [External] Modification Confirmation
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
This e-mail is to notify you that the modification information for COC No. NCC230818 for the project M-
73 Cardinal to NC State Pipeline Project that you submitted on 4/22/2024 has been added to the
permit file records as of 4/25/2024.
Modification Reason: Other Revision(s)to E&SC Plan
Additional Details (if provided): Installation of the cathodic protection which resulted in an increase to
the Limits of Disturbance (LOD) at the south end of the project on Lake Wheeler Road
You can find all Construction COC Permit files in our Document Repository here.
Questions? Please contact The NC Stormwater Program at(919) 707-3640.
Be sure to add laserfiche.ncdenr.gov@mccicloud.io to your contacts to avoid future e-mails about this
application from going into Spam filters.
The NC DEMLR Stormwater Program
512 N. Salisbury Street,Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as
responses are not monitored.
i