Loading...
HomeMy WebLinkAboutSW6231001_Supplement-EZ_20240424 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Lancaster 2 Project Area(ac) 10.82 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) - 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 _ 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: • 11 Infiltration System 1 12 ,Bioretention Cell 0 13 !Wet Pond _ 0 14 Stormwater Wetland 0 _15 Permeable Pavement 0 16 .Sand Filter 0 17 ,Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 ;Treatment Swale 0 22 Dry Pond 0 23 'StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 i. FORMS LOADED 7DESIGNER CERTIFICATION 27 Name and Title: _ Carlo Pardo, PE 28 Organization: Bowman North Carolina,Ltd. 29 Street address: 4006 Barrett Drive,Suite 104 30 City,State,Zip: Raleigh,NC 27609 31 'Phone number(s): 919-553-6570 32 Email: cpardo@bowman.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer \`,��tttillil:;ii;;/yy, ii SEAL r :,1--- Signatur f Designer 051571 i '•• t' ��///nimillttt���� 1) 17inti Seal Dale DRAINAGE AREAS 1 r0 Is this a high density project? I Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas Is all/part of this project subject to previous rule 5 ;versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 1 —'1 [ — 4 Type of SCM - ' Infiltration Basin 5 Total drainage area(sq ft) 471494 sf 393707 6 Onsite drainage area(sq ft) 471494 sf 386138 7 Offsite drainage area(sq ft) 7569 8 Total BUA in project(sq ft) 100880 sf 108449 sf New BUA on subdivided lots(subject to permitting) 9 ,(sq ft) 64000 sf 64000 sf New BUA not on subdivided lots(subject to 10 ,permitting)(sf) 36880 sf 36880 sf _ 11 Offsite BUA(sq ft) 7569 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) _ -Sidewalk(sq ft) 5026 sf 5026 sf -Roof(sq ft) -Roadway(sq ft) 31854 sf 31854 sf -Future(sq ft) __ -Other,please specify in the comment box below ss ft) New infiltrating permeable pavement on ' 13 'subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq� 16 Existing BUA that is already permitted(sq ft) _ 17 Existing BUA that will be removed(sq ft) 4117 sf 4117 sf 18 Percent BUA 21.40% 27.5% 19 Design storm(inches) 1.0 in 20 Design volume of SCM(Cu ft) 36158 cf 21 Calculation method for design volume Simple Method •ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Line 11-The 7,569 sf of off-site impervious is made up of ROW and neighboring parcels that were assumed 100%BUA. In the pond calculations the pre-developed drainage area has 11,240 sf(0.26 ac.)of BUA.The 4,117 sf listed above is the existing,on-site BUA.The remaining 7,123 sf of BUA is off-site,and is either included in Line 11, or will not drain to the infiltration basin after development. INFILTRATION SYSTEM 1 ;Drainage area number I 1 2 Minimum required treatment volume(cu ft) 9774 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 'Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V or enter"Vertical'for trenches)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered 4side slopes? No 7 'Are the inlets,outlets,and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? I Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? - j Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with General MDC 10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes_ 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 .Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes "INFILTRATION SYSTEM MDC FROM 02H.1051 18 Proposed slope of the subgrade surface(%) 0% 19 Are terraces or baffles provided? No 20 Type of pretreatment: Fore_bay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation(fmsl) 193.00 23 Depth to SHWT per soils report(in) 132.00 24 Ground elevation at boring in soils report(fmsl) 204.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 Soil infiltration rate(in/hr) 4 5.00 27 Factor of safety(FS) (2 is recommended): j 2.00 Elevations 29 Bottom elevation(fmsl) ( 200 ft 30 Storage elevation(fmsl) 201.7 ft 31 Bypass elevation(fmsl) 201.7 ft For Basins Only 32 Bottom surface area(ft2) 19800 ft 33 Storage elevation surface area(ft2) 22760.ft For Trenches Only 34 Length(ft) 35 Width(ft) 36 'Perforated pipe diameter,if applicable(inches) _ 37 Number of laterals 38 Total length of perforated piping 39 Stone type,if applicable 40 Stone porosity(%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? I Volumes/Drawdown L 44 Design volume of SCM(cu ft) 36158 cf 45 Time to draw down(hours) 18.9 hrs ADDITIONAL INFORMATION 46 'Please use this space to provide any additional information about the infiltration system(s): Line 26-The soils report found the infiltration rate of the soil for DA 1 to be 10.0"/hr.A =more conservative value of 5.0"/hr was used in the calculations,to account for clogging of the soils that will happen over time. Infiltration 1 4:21 PM 1/17/2024