Loading...
HomeMy WebLinkAboutNCG080143 DMR SWSemi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qua ity G neral Permit No. NCGO80000 Date submitted L a0 CERTIFICATE OF C A ENO. Pjt.0 S. FACILITY NAME e COUNTY PERSON COLLECTING AML 5 7 LABORATORY �' b Cert. # Corriments on sampl collection or naly s: SAMPLE COLLECTION YEAR _�40!7- SAMPLE PERIOD ❑ Jan -June C&uly-Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ,§ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply [:]SA ❑Other PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes /.0 (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) No discharge this periods Outfall Date No. Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended pH, Solids, mg/L Standard units Non -Polar Oil and Grease/TPH EPA New Motor Oil Usage, Method 1664 (SGT -HEM), mg/L Annual average gal/mo Benchmark - SO or 100 see permit Within 6.0 — 9.0 15 - SO or 100 see permit 6.0-9.0 Part B: Oil/water separators and Secondary Containment Areas at Petroleum Bulk Stations and i errronals (If applicable) Outfall No. Date Sample Collected, mo/dd/vr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT -HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit 15 SO or 100 see permit 6.0-9.0 I For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. ." � J SVV1J-250 last revised April 11, 2013 Page 1 of 2 STORM EVENT jtCHARACTERISTICS: Date �1 Iq 1 -(first event sampled) Total Event Precipitation (inches): Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: - Mail an original and one copy of this DMR, Including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there ani�.caht pena;ties for submitting false information, includi„e, the pussiti lity or fines and imprisonment for knowing violations.' / Z -/2-I S' (Date) ditifinal copi6s of this form may be downloaded at: httpl(pZ tal ncne<�r_orK/wet;tvvt�jyvsl z, /n pdessw#'tab-4 SWU-250 last revised April 11, 2013 Page 2 of-"