HomeMy WebLinkAboutNCG030333 DMR SW (3)Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030636
Date submitted 11/17/2015
CERTIFICATE OF COVERAGE NO. NCG030363 SAMPLE COLLECTION YEAR 2015
FACILITY NAME ITW Warehouse Automation SAMPLE PERIOD ❑ Jan -June ® July -Dec
COUNTY Buncombe or ❑ Monthly' (month)
PERSON COLLECTING SAMPLES Jose Gomez DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY ESC Lab Cert. # L797142 ❑Zero -flow ❑Water supply [—]SA
Comments on sample collection or analysis: Total rainfall event 1.00" ®Other SDO
Part A: Stormwater Benchmarks and Monitoring Results
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period ?2
Outfall No.
Date Sample
Collected ,
(mo/dd/yr)
24-hour rainfallH
amount,
Inches3
Total Suspended Solids
P '
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks =__>
_
-
100 mg/L or 50 mg/L4
6.0-9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
002
10/27/2015
1.00
2.94
7.73
BDL -0.010
BDL -0.005
0.131
BDL -5.7
i
Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
3 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail on original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 11/1/2012-10/31/2017
S—
(Datel
SWU-245, last revised 10/25/2012
Page 3 of 3