HomeMy WebLinkAbout310005_Lagoon 3139C (Site 4) Vol. Calcs_20240318Grower: Scott Farm Site 4 Lagoon 3139Designed y: EO
Address: PO Box 785 Checked By: DSE
Rose Hill, NC 28458 Date: 01/12/24
County: Duplin Sheet 1 of 7
WASTE STORAGE POND DESIGN
FARM INFORMATION
Farm Population:
Nursery: -------------------
Wean to Finish: -------------------
Finishing: -------------------
Farrow to weanling: -------------------
Farrow to feeder: -------------------
Farrow to finish: -------------------
Boars: -------------------
Storage Period: -------------------
25 Yr. / 24 Hr Storm Event -------------------
"Heavy Rain" Factor Not Applicable
Rainfall in Excess of Evaporation -------------------
Additional Water Usage: -------------------
Additional Drainage Area: -------------------
LAGOON INFORMATION
Is Lagoon Designed as an Irregular Shape? (Y/N)------------
Does Operator Want Emergency Spillway? (Y/N)------------
Was This Design Built Prior to Sept. 1996? (Y/N)------------
Is Drain Tile Req'd to Lower SHWT? (Y/N)------------
Seasonal High Water Table Elev: -------------------
Freeboard: -------------------
Emergency Spillway Flow Depth: Not Applicable
Side Slopes: -------------------
From Lagoon Volume Check Contours
contour areas see sheet 2 of 7...
Top of Dike Elevation: ---------------- Depth
Finished Bottom Elevation: ---------------• 10.50 Ft.
Start Pump Elevation: ---------------- 21.6 In.
Stop Pump Elevation: ---------------- 48 In.
LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES
Y
N
Y
N
0
24642 Hd.
0
0
0
0
0
180 Days
7.5 In.
7.0 In.
0
0
0.00
1.0 Ft.
3 :1 (H:V)
0.0
0.0
154.50
Ft.
144.00
Ft.
152.70
Ft.
150.50
Ft.
% REQ'D.
Storm Stor =
84310 (Cu.Ft.)
102,953
(Cu.Ft.)
122.11 %
Temporary =
770730 (Cu.Ft.)
268,175
(Cu.Ft.)
34.79%
Permanent =
0 (Cu.Ft.)
673,797
(Cu.Ft.)
Total Volume =
855,040 (Cu.Ft.)
1,044,925
(Cu.Ft.)
122.21 %
1/2 Treatment Volume = 0 (Cu.Ft.)
1/2 Treatment Volume Elevation = 150.50 Ft.
90 Temporary Storage Volume Elevation = 149.30 Ft.
Min. Required Liner Thickness -------------------
Lagoon Surface Area: (Inside TOD)-------------------
48.00 In.
62.43 In.
1.5 Ft.
134,896 S.F.
Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434
Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO
Address: PO Box 785 Checked By: DSE
Rose Hill, NC 28458 Date: 01/12/24
Countv: Duplin Sheet 2 of 7
ACTUAL DESIGN VOLUME CALCULATIONS
BASE VOLUME: ICu. Ft.
LAGOON STAGE -AREA VOLUMES
Contour
Elevation (FT.)
Area SF
Incr. Vol. (Cu. FT)
Cumul. Vol. (Cu.
144.00
90,473
0
145.00
94,400
92,437
92,437
146.00
98,385
96,392
188,829
147.00
102,435
100,410
289,238
148.00
106,551
104,493
393,731
149.00
110,733
108,642
502,373
150.00
114,980
112,856
615,229
151.00
119,292
117,136
732,365
152.00
123,671
121,482
853,847
153.00
128,115
125,893
979,740
154.00
132,625
130,370
1,110,110
154.50
134,896
66,880
1,176,990
These volumes were calculated using the vertical average end area method.
TOTAL READ VOL
855,040
CF
CUMULATIVE
VOL.
ZONE VOL. 122.21 %
END PUMP = = = =
150.50
FT
673,797 CF
TR'MT
673,797
START PUMP = =:
152.70
FT
941,972 CF
TEMP
268,175 34.79%
MAX STORAGE =
153.50
FT
1,044,925 CF
STORM
102,953 122.11%
Murphy -Brown, LLC Engineering P.O. Box 856,Warsaw, NC 28398 (910) 293-3434
Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO
Address: PO Box 785 Checked By: DSE
Rose Hill, NC 28458 Date: 01/12/24
Countv: Dur lin Sheet 3 of 7
MINIMUM REQUIRED VOLUME CALCULATIONS
Permanent Storage:
Required Treatment Volume:
Animal Type Capacity ALW (cu.ft./lb) = Total
Nursery
0
30
1.00
0
Wean to Finish
24,642
115
0.00
0
Finishing
0
135
0.00
0
Farrow to weanling
0
433
1.00
0
Farrow to feeder
0
522
1.00
0
Farrow to finish
0
1,417
1.00
0
Boars
0
400
1.00
0
Total Required Treatment Volume (cu. ft.)=
Sludge Storage Volume:
0
Animal Type Capacity ALW (cu.ft./lb) = Total
Nursery
0
30
0.00
0
Wean to Finish
24,642
115
0.00
0
Finishing
0
135
0.00
0
Farrow to weanling
0
433
0.00
0
Farrow to feeder
0
1 522
0.00
0
Farrow to finish
0
1,417
0.00
0
Boars
0
400
0.000
0
Total Required Sludge Storage Volume (cu. ft.)=
Temporary Storage Volume:
Manure Production:
0
Animal Type Capacity * Sto. Period d./day) = Total
Nursery
0
180
0.30
0
Wean to Finish
24,642
180
1.17
5,176,463
Finishing
0
180
1.37
0
Farrow to weanling
0
180
4.39
0
Farrow to feeder
0
180
1 5.30
1 0
Farrow to finish
0
180
14.38
0
Boars
0
180
4.06
0
Total Manure Production (gals.)=
Total Manure Production (cu.ft.)=
Excess Fresh Water:
5,176,463
692,040
Animal Type Capacity * Sto. Period d./day) = Total
Nursery
0
180
0.00
0
Wean to Finish
24,642
180
0.00
0
Finishing
0
180
0.00
0
Farrow to weanling
0
180
0.00
0
Farrow to feeder
0
180
1 0.00
1 0
Farrow to finish
0
180
0.00
0
Boars
0
180
0.00
0
Total Fresh Water Excess (gals.)=
Total Fresh Water Excess (cu.ft.)=
0
0
Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO
Address: PO Box 785 Checked By: DSE
Rose Hill, NC 28458 Date: 01/12/24
County: Duplin Sheet 4 of 7
Temporary Storage Volume: (Cont.
Rainfall in Excess of Evaporation:
Vol.=(Lagoon Surface Area + Additional Drainage Area) * Rainfall / 12in./ft
Vol.= (134896 sq.ft. + 0 sq.ft.) * 7 in. /12 in./ft.
Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 78,689
Storm Storage:
Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * 25Yr./24Hr. Storm(in) / 12in./ft.
Vol.= (134896 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft.
Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= 84,310
"Heavy Rain" Storage:
Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft.
Vol.= (134896 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft.
Total Required Volume for "Heavy Rain" (cu.ft.) = 0
(for Extended Periods of Chronic Rainfall)
Additional Water Storage:
No Additional Water Storage is Required
0 0
Total Required Storm Storage
(25Yr. / 24Hr. Storm +'Heavy Rain')=
Total Required Temporary Storage
(Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage) _
Total Required Permanent Storage
(Treatment + Sludge) _
TOTAL REQUIRED VOLUME = 855040 (CU.FT.)
P.O. Box 856, Warsaw NC 28398
84,310 (CU.FT)
770,730 (CU.FT)
0 (CU.FT)
10) 293-3434
Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO
Address: PO Box 785 Checked By: DSE
Rose Hill, NC 28458 Date: 01/12/24
Countv: Dur lin Sheet 5 of 7
LAGOON DESIGN SUMMARY
Top of Dike Elevation
Emergency Spillway Crest Elevation
Top of 25Yr. / 24Hr. Storm Storage
Top of "Heavy Rain" Storage
Start Pump Elevation
End Pump Elevation
Top of Sludge Storage
Seasonal High Watertable Elev.
Finished Bottom Elevation
Inside Top Length
Inside Top Width
Side Slopes
Lagoon Surface Area
Min. Liner Thickness (if required)
Freeboard Depth
Temporary Storage Period
Zone Deaths:
------------------- 154.50 FT.
------------------- Not AI Applicable
------------------- 153.50 FT.
------------------- Not Applicable
------------------- 152.70 FT.
------------------- 150.50 FT.
------------------- Not Applicable
------------------- 0.00
------------------- 144.00 FT.
------------------- Not Applicable
------------------- Not Applicable
------------------- 3:1 H:V
------------------- 134,896 SF
------------------- 1.5 FT.
------------------- 1.00 FT.
------------------- 180 Days
TOTAL DESIGN VOLUME = 1044925 (CU.FT.)
Treatment / Sludge Storage Zone Depth ----------- 6.5 FT.
Temporary Storage Zone Depth ----------- 2.2 FT.
Freeboard / Storm Storage Zone Depth ----------- 1.8 FT.
Total Lagoon Depth ----------- 10.5 FT.
P.O. Box 856, Warsaw NC 28398
10) 293-3434
a
00
0
r-
n
r
CD
CD
CO
;U
c 0-0
CD CD
-0 Cn
II
II
c O O 0
Cil
�. CD CO
CD
cn
N
o
= x
0
o
z 0o 3
(7 Cn
N CD
0
/
Cn
O
0
i
W
i
CD
F
T
N
Z
O
cn
Z
m
m
v
-n
p
m
p
O
T
m
O
m
<
�
0
�
O
m
Z
m
m
D
m
cnm
m
r
<
<
m
m
<
<
II
II
m
II
o
m
<
cn
Cn
0
o
o
II
cn
o
cn
o
N
I�
4
0
Cn
Cno00
=r Cv =r CD
II
CD CD Cn
CD 0
\
m CD [D
O_ o C-
��
-Iom0
N
N
Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO
Address: PO Box 785 Checked By: DSE
Rose Hill, NC 28458 Date: 01/12/24
Countv: Duolin Sheet 7 of 7
This livestock waste treatment lagoon is designed in accordance with the United States
Natural Resources Conservation Service PRACTICE STANDARD 359- WASTE TREATMENT
LAGOON, revised prior to June, 1996.
Emergency Spillway:
An Emergency Spillway is not required.
NOTE: See attached Waste Utilization Plan
DESIGNED: �
DATE: 01/12/2024
COMMENTS: The lagoon has been designed as an irregular shape.
This design is update of start and stop pump elevations and to show the 1/2
treatment volume level for sludge storage. This design does not supercede the
original certification of the farm.
Elevations are based on an assumed benchmark and do not represent mean sea level datum.
1 certify, to the best of my professional knowledge, judgement, and belief, this design calculation
is in accordance with the applicable NRCS standards.
Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434