Loading...
HomeMy WebLinkAbout310005_Lagoon 3139C (Site 4) Vol. Calcs_20240318Grower: Scott Farm Site 4 Lagoon 3139Designed y: EO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin Sheet 1 of 7 WASTE STORAGE POND DESIGN FARM INFORMATION Farm Population: Nursery: ------------------- Wean to Finish: ------------------- Finishing: ------------------- Farrow to weanling: ------------------- Farrow to feeder: ------------------- Farrow to finish: ------------------- Boars: ------------------- Storage Period: ------------------- 25 Yr. / 24 Hr Storm Event ------------------- "Heavy Rain" Factor Not Applicable Rainfall in Excess of Evaporation ------------------- Additional Water Usage: ------------------- Additional Drainage Area: ------------------- LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (Y/N)------------ Does Operator Want Emergency Spillway? (Y/N)------------ Was This Design Built Prior to Sept. 1996? (Y/N)------------ Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ Seasonal High Water Table Elev: ------------------- Freeboard: ------------------- Emergency Spillway Flow Depth: Not Applicable Side Slopes: ------------------- From Lagoon Volume Check Contours contour areas see sheet 2 of 7... Top of Dike Elevation: ---------------- Depth Finished Bottom Elevation: ---------------• 10.50 Ft. Start Pump Elevation: ---------------- 21.6 In. Stop Pump Elevation: ---------------- 48 In. LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES Y N Y N 0 24642 Hd. 0 0 0 0 0 180 Days 7.5 In. 7.0 In. 0 0 0.00 1.0 Ft. 3 :1 (H:V) 0.0 0.0 154.50 Ft. 144.00 Ft. 152.70 Ft. 150.50 Ft. % REQ'D. Storm Stor = 84310 (Cu.Ft.) 102,953 (Cu.Ft.) 122.11 % Temporary = 770730 (Cu.Ft.) 268,175 (Cu.Ft.) 34.79% Permanent = 0 (Cu.Ft.) 673,797 (Cu.Ft.) Total Volume = 855,040 (Cu.Ft.) 1,044,925 (Cu.Ft.) 122.21 % 1/2 Treatment Volume = 0 (Cu.Ft.) 1/2 Treatment Volume Elevation = 150.50 Ft. 90 Temporary Storage Volume Elevation = 149.30 Ft. Min. Required Liner Thickness ------------------- Lagoon Surface Area: (Inside TOD)------------------- 48.00 In. 62.43 In. 1.5 Ft. 134,896 S.F. Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 Countv: Duplin Sheet 2 of 7 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: ICu. Ft. LAGOON STAGE -AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. 144.00 90,473 0 145.00 94,400 92,437 92,437 146.00 98,385 96,392 188,829 147.00 102,435 100,410 289,238 148.00 106,551 104,493 393,731 149.00 110,733 108,642 502,373 150.00 114,980 112,856 615,229 151.00 119,292 117,136 732,365 152.00 123,671 121,482 853,847 153.00 128,115 125,893 979,740 154.00 132,625 130,370 1,110,110 154.50 134,896 66,880 1,176,990 These volumes were calculated using the vertical average end area method. TOTAL READ VOL 855,040 CF CUMULATIVE VOL. ZONE VOL. 122.21 % END PUMP = = = = 150.50 FT 673,797 CF TR'MT 673,797 START PUMP = =: 152.70 FT 941,972 CF TEMP 268,175 34.79% MAX STORAGE = 153.50 FT 1,044,925 CF STORM 102,953 122.11% Murphy -Brown, LLC Engineering P.O. Box 856,Warsaw, NC 28398 (910) 293-3434 Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 Countv: Dur lin Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: Animal Type Capacity ALW (cu.ft./lb) = Total Nursery 0 30 1.00 0 Wean to Finish 24,642 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weanling 0 433 1.00 0 Farrow to feeder 0 522 1.00 0 Farrow to finish 0 1,417 1.00 0 Boars 0 400 1.00 0 Total Required Treatment Volume (cu. ft.)= Sludge Storage Volume: 0 Animal Type Capacity ALW (cu.ft./lb) = Total Nursery 0 30 0.00 0 Wean to Finish 24,642 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weanling 0 433 0.00 0 Farrow to feeder 0 1 522 0.00 0 Farrow to finish 0 1,417 0.00 0 Boars 0 400 0.000 0 Total Required Sludge Storage Volume (cu. ft.)= Temporary Storage Volume: Manure Production: 0 Animal Type Capacity * Sto. Period d./day) = Total Nursery 0 180 0.30 0 Wean to Finish 24,642 180 1.17 5,176,463 Finishing 0 180 1.37 0 Farrow to weanling 0 180 4.39 0 Farrow to feeder 0 180 1 5.30 1 0 Farrow to finish 0 180 14.38 0 Boars 0 180 4.06 0 Total Manure Production (gals.)= Total Manure Production (cu.ft.)= Excess Fresh Water: 5,176,463 692,040 Animal Type Capacity * Sto. Period d./day) = Total Nursery 0 180 0.00 0 Wean to Finish 24,642 180 0.00 0 Finishing 0 180 0.00 0 Farrow to weanling 0 180 0.00 0 Farrow to feeder 0 180 1 0.00 1 0 Farrow to finish 0 180 0.00 0 Boars 0 180 0.00 0 Total Fresh Water Excess (gals.)= Total Fresh Water Excess (cu.ft.)= 0 0 Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin Sheet 4 of 7 Temporary Storage Volume: (Cont. Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area + Additional Drainage Area) * Rainfall / 12in./ft Vol.= (134896 sq.ft. + 0 sq.ft.) * 7 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 78,689 Storm Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * 25Yr./24Hr. Storm(in) / 12in./ft. Vol.= (134896 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft. Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= 84,310 "Heavy Rain" Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft. Vol.= (134896 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 0 Total Required Storm Storage (25Yr. / 24Hr. Storm +'Heavy Rain')= Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage) _ Total Required Permanent Storage (Treatment + Sludge) _ TOTAL REQUIRED VOLUME = 855040 (CU.FT.) P.O. Box 856, Warsaw NC 28398 84,310 (CU.FT) 770,730 (CU.FT) 0 (CU.FT) 10) 293-3434 Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 Countv: Dur lin Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation Emergency Spillway Crest Elevation Top of 25Yr. / 24Hr. Storm Storage Top of "Heavy Rain" Storage Start Pump Elevation End Pump Elevation Top of Sludge Storage Seasonal High Watertable Elev. Finished Bottom Elevation Inside Top Length Inside Top Width Side Slopes Lagoon Surface Area Min. Liner Thickness (if required) Freeboard Depth Temporary Storage Period Zone Deaths: ------------------- 154.50 FT. ------------------- Not AI Applicable ------------------- 153.50 FT. ------------------- Not Applicable ------------------- 152.70 FT. ------------------- 150.50 FT. ------------------- Not Applicable ------------------- 0.00 ------------------- 144.00 FT. ------------------- Not Applicable ------------------- Not Applicable ------------------- 3:1 H:V ------------------- 134,896 SF ------------------- 1.5 FT. ------------------- 1.00 FT. ------------------- 180 Days TOTAL DESIGN VOLUME = 1044925 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 6.5 FT. Temporary Storage Zone Depth ----------- 2.2 FT. Freeboard / Storm Storage Zone Depth ----------- 1.8 FT. Total Lagoon Depth ----------- 10.5 FT. P.O. Box 856, Warsaw NC 28398 10) 293-3434 a 00 0 r- n r CD CD CO ;U c 0-0 CD CD -0 Cn II II c O O 0 Cil �. CD CO CD cn N o = x 0 o z 0o 3 (7 Cn N CD 0 / Cn O 0 i W i CD F T N Z O cn Z m m v -n p m p O T m O m < � 0 � O m Z m m D m cnm m r < < m m < < II II m II o m < cn Cn 0 o o II cn o cn o N I� 4 0 Cn Cno00 =r Cv =r CD II CD CD Cn CD 0 \ m CD [D O_ o C- �� -Iom0 N N Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 Countv: Duolin Sheet 7 of 7 This livestock waste treatment lagoon is designed in accordance with the United States Natural Resources Conservation Service PRACTICE STANDARD 359- WASTE TREATMENT LAGOON, revised prior to June, 1996. Emergency Spillway: An Emergency Spillway is not required. NOTE: See attached Waste Utilization Plan DESIGNED: � DATE: 01/12/2024 COMMENTS: The lagoon has been designed as an irregular shape. This design is update of start and stop pump elevations and to show the 1/2 treatment volume level for sludge storage. This design does not supercede the original certification of the farm. Elevations are based on an assumed benchmark and do not represent mean sea level datum. 1 certify, to the best of my professional knowledge, judgement, and belief, this design calculation is in accordance with the applicable NRCS standards. Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434