Loading...
HomeMy WebLinkAboutNC0083658_Staff Comments_20120509Weaver, Charles From: Corporon, Joe Sent: Wednesday, May 09, 2012 12:16 PM To:Weaver, Charlesn 4 1 �' 1 ( f 4I�i Subject: ect: RE: NCO083658 EPA VOC Method 601 // tl C\JJJ ct -V 1 Charles --...let's go with Organics/Total Volatile [782361 f ) a Iy�lt1 From: Weaver, Charles Sent: Wednesday, May 09, 2012 10:31 AM To: Corporon, Joe Subject: FW: NCO083658 EPA VOC Method 601 Importance: High Joe — there isn't a parameter code in BIMS for the Method 601 scan. The closed analog I can find in the list of PCS codes is either: Organics/Total Volatile V82361 Organics / Volatile [782371 I can submit a ticket and have them added to BIMS ... but which one is best for this permit? CHW From: Hunkele, Dean Sent: Monday, May 07, 2012 12:41 PM To: Corporon, Joe Cc: Weaver, Charles Subject: NCO083658 EPA VOC Method 601 Importance: High Joe, Should this requirement have a footnote? Permit has same one indicated as Toxicity, but no comments specific to it and it is a different monitoring schedule. Charles, Is there something in BIMS to show that they reported it as permit does not show it currently? Both, The discharge fat/long coordinates on the map & in BIMS place this discharge in Green Sea, SC. Thus, needs to be corrected. Long should be 77 not 78. Thanks Dean Hunkele, Senior Environmental Specialist Wilmington Regional Office Division of Water Quality, Surface Water Protection Section Delegation of Authority to Colonial's Operations Manager -Texas, Operations Manager -Louisiana, Operations Manager -Mississippi, Operations Manager-Tenn/Alabama, Operations Manager - Georgia, Operations Manager -Charlotte/tSC, Operations Manager -GreensborolSeima, Operations Manager -Virginia, Operations Manager- Baltimore, Operations Manager- Woodbury, and Operations Manager - Linden Air Program For the F,ir Program, asabove in 40 CFR 70.2(1), a duly authorized representative can act as a respilnsible•otFrcial" if that person is -responsible for the••overafl'operation of one'or more operating facilities applying for or subject to a permit and the delegation of authority to such representative is approved in advance by the permitting authority. Set out below are Colonial's Operations Managers and each Operations Manager's area of responsibility: ♦ The Operations Manager - Texas is responsible for the overall operation of Colonial's Texas facilities and Colonial's Lake Charles facility. e The Operations Manager-- Lpuisiana is responsible for_the'overall operations of Colonial's Louisiana faculties (excluding Colonial's Lake Charles facility). * The Operations Manager - Mississippi is responsible for the overall operations of Colonial's Mississippi facilities and Colonial's Epes Station in Alabama. The Operations Manager - Tenn/Alabama is responsible for the overall operations of Colonial's facilities in Tennessee, overall operation of Colonial's I-acilities in Alabama (excluding Colonial's Epes Station), and Colonial's Chattanooga•J,unciion and Lookout Mountain Delivery Facility in Georgia. • The Operations Manager - Georgia is responsible for the overall operations of Colonial's Georgia %facilties from Alabama. to'the : Big Bear .Creek BLV (which is upstream of .Athens). The • Operations Manager - Georgia is also responsible for the overall operations of Colonial's facilities from Atlanta Junction to the Etowah River BLV (which is downstream of Rome). The Operations Manager - Charlotte/SC is responsible for time overall operations of Colonial's facilities downstream of the Big Bear Creek BLV (which is upstream of Athens and includes Colonial's Athens and Danielsville facilities), Charlotte, Kennapolis and Gastonia facilities in Nnrth Carolina and of all Co{oniat's facilities in South Carolina. o .,The Operations Manager 7-..Greensboro/Selma is responsible for the overall operation of all of Colonial's facilities M North' Carolina (with the exception of Colenial's Charlotte, Kannapolis and Gastonia facilities) and of Colonial's Hickory Grove and Witt facilities in Virginia. a Operations Manager - Virginia is responsible for the overall operation of all of Colonial's facilities in Virginia (with the exception of Colonial's Ulfitt, Hickory Grove, Remington, Bull Run, Chantilly, and Dulles•facilities): a'Operations Manager - Baltimore is responsible for the overall operations of Colonial's facilities in Maryland and Colonial's Remington, Bull Run, Chantilly, and Dulles facilities located in Virginia d Operations Manager - Woodbury is responsible for the overall operations of Colonial's New Jersey facilities (with the exception of Colonial's Linden facility) and of Colonial's facilites in Pennsylvania. • Operations Manager - Linden is responsible for the overall operations of Colonial's facilities in Linden, New Jersey. As required by 40 CFR f;70.2(1)(ii), Colonial intends to obtain the approval of this delegation from time appricable permitting authorities. NPDE'S Program For the NRDES Program, under 40 CFR 5122(a)(4), Colonial's Operations Manager - Texas, Operations Manager - Louisiana, Operations Manager - Mississippi, Operations Manager - Tenn/Alabama, Operations t Manager - Georgia, Operations Manager - Charlottef/SC. Operations Manager - Greensboro/Selma, Operations Manager - Virginia, Operations Manager - Baltimore, Operations Manager - Woodbury. and Operatiors Manager - Linden should be within the definition of "responsible corporate officer. Each Operations Manager is responsible for operations in their respective areas, and are authorized to make management decisions. which govern the operation of the regulated facilities under their responsibility including (a) having the 3