Loading...
HomeMy WebLinkAboutSWA000200_Fast Track Commence_20240104 Green Mountain Engineering, PLLC Civil Engineering Consultants Land Surveyors Transmittal Environmental e l o t To: Lily Kay: NCDEQ—: Winston-Salem Office Received y Address: 450 West Hanes Mill Road, Suite 300, Winston-Salem, NC27105 JAN 0 4 2024 Winston-Salem From: Joseph O'Buch, PE Regional Office Date: January 3, 2024 Re: Stapleton S/D Messages Lily, Attached please find the following item: 1. Fast Track Construction Commencement Form, ATC Permit No. SWA000200, Stapleton Subdivision. Please let us know if you have any questions, or require additional information. I can be reached via email joe@greenmountainengineers.com or by phone 336-294-9394 at your convenience. Best Regards, Joseph V. O'Buch, PE 7A Wendy Court - Greensboro, NC 27409 - (336) 294-9394 Page 1 of 1 Post-Construction Stormwater Management ATC Permit No. SWA000200 Attachment A Fast Track Construction Commencement Form ATC Permit No. SWA000200 Stapleton Subdivision Forsyth County Complete and submit this form (NO SUBSTITUTES) to the Winston-Salem Regional Office The undersigned hereby notifies the agency below that the construction of this project is expected to commence on i/ , 2uz3 (mm/dd/yyyy) and is expected to be completed by 110 4 (2v)-7 (mm/dd yyyy). I understand that this project shall not be considered complete until the Division has received the final Fast-Track Stormwater Permit Application Form and all required supporting documentation. 7 cvt /2/771o23 ignature of ermit er Title (if an ) D to Designer's Certification I, 4s6rAA v,g5a , as a duly re istered Licensed Professional in the State of North Carolina, having been authorized to observe (periodically, ❑ weekly, I I full time) the construction of the subject project on behalf of the Permittee. I hereby state that, to the best of my abilities, due care and diligence will be used such that the project and all stormwater control measures (SCMs) shall be constructed to meet all applicable requirements of 15A NCAC 02H Section .1000- .1062, including the Minimum Design Criteria (MDC). North Carolina Licensed Professional Seal, signature, and date: It is highly recommended that this notification be sent in a manner that provides proof of receipt by the Division. The Division does not acknowledge receipt of Fast Track Construction Commencement Notification Forms. Submit this form to the following Office: Division of Energy, Mineral and Land Resources c/o Lily Kay Post-Construction Stormwater Management Program Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Page 1 of 1 Post-Construction Stormwater Management ATC Permit No. SWA000200 Attachment B Example Deed Restriction and Protective Covenants Language Low Density Subdivision (residential or non-residential) In accordance with Title 15 NCAC 2H.1000 effective January 1, 2017, the stormwater rules, deed restrictions and protective covenants are required to be recorded to ensure that projects will be maintained, in perpetuity, consistent with the stormwater rules and the design condition. The following example deed restrictions and protective covenants are to be recorded prior to the sale, conveyance, and issuance of a certificate of occupancy for a lot or group of lots to any individual or entity. Please note that the final permit will be issued a separate permit number. 1. The following covenants are intended to ensure ongoing compliance with Post-Construction Storm water Management Permit Number (see note above) , as issued by the Division of Energy, Mineral and Land Resources (the "Division") under 15A NCAC 02H.1000, effective January 1, 2017. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the storm water management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to storm water shall not be allowed to expire and may not be altered or rescinded without the express written consent of the Division. 5. Alteration of the drainage as constructed under the ATC permit approval and as shown on the final storm water plans submitted as part of the as-built package may not take place without the concurrence of the permittee and approval by the Division. Filling in, piping, altering, or modifying any component of the approved vegetated conveyance system and/or curb outlet system shown on the approved plan, except for a minimum driveway crossing, is strictly prohibited. 6. The maximum allowable built-upon area per lot is square feet. OR, if the proposed built-upon area per lot will vary, please use the following statement and provide a complete listing of the proposed built-upon area for each lot: The maximum allowable built-upon area (BUA)per lot, in square feet, is as listed below or in the attached table: Lot# BUA, sf Lot# BUA, sf This allotted amount includes any built-upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the street pavement and/or sidewalk. The maximum allowable built-upon area shall not be exceeded on any lot until the permit is modified to ensure compliance with the storm water rules. Built upon area has the same meaning as G.S. 143-214.7, as amended in Session Law 2017-10. 7. All lots shall maximize dispersed flow of runoff through vegetated areas and minimize channelization of runoff. Where runoff cannot be released as dispersed flow, vegetated conveyances may be used. Page 1 of 2 Post-Construction Stormwater Management ATC Permit No. SWA000200 8. A 30-foot wide vegetated setback must be provided and maintained adjacent to all surface waters in accordance with 15A NCAC 02H. 1003(4) and the final plans submitted as part of the as-built package. 9. Any individual or entity found to be in noncompliance with the provisions of a storm water management permit or the requirements of the storm water rules is subject to enforcement procedures as set forth in NCGS 143, Article 21. Other recommended language the permittee may find beneficial to assist in modifications, resolving potential future compliance issues, or correcting errors: 1. The Declarant shall have the right to amend the covenants without consent of the members to conform the Declaration to the requirements of any law or governmental agency having legal jurisdiction over the property, including those agencies sponsored by or under the control of the State of North Carolina. A letter from an official of any such agency requesting, requiring or suggesting an amendment necessary to comply with the requirements of such agency, shall be sufficient evidence to affect such an amendment. The amendment shall be effective upon recording. Page 2 of 2