HomeMy WebLinkAbout780090_routine_202402120 Division of Water Resources
❑ Division of Soil and Water Conservation
❑ Other Agency
Facility Number: 780090 Facility Status: Active Permit: AWS780090 ❑ Denied Access
Inspection Type: Compliance Inspection Inactive Or Closed Date:
Reason for Visit: Routine County: Robeson Region: Fayetteville
Date of Visit: 02/09/2024 Entry Time: 11:20 am Exit Time: 11:45 pm Incident #:
Farm Name: 5071, 5072, 5073, & 5074 Owner Email:
Owner: Murphy -Brown LLC Phone: 910-296-1800
Mailing Address: PO Box 487 Warsaw NC 283980487
Physical Address: 4729 Hasty Rd Laurinburg NC 28352
Facility Status: 0 Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC
Location of Farm: Latitude: 34° 41' 35" Longitude: 79° 20' 31"
Take NC 130 south of Maxton approx. 2 miles to SR 1189 (unpaved). Farm is on north side of SR 1189 approx. 1/2 mile from jct.
NC 130 & SR 1189.
Question Areas:
Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application
Records and Documents Other Issues
Certified Operator: Ronald Lee Matthews Operator Certification Number: 990008
Secondary OIC(s):
On -Site Representative(s): Name Title Phone
24 hour contact name Mike Cudd
On -site representative Mike Cudd
Primary Inspector: Katie Fontenot Phone:
Inspector Signature: Date:
Secondary Inspector(s):
Inspection Summary:
15. fields needs weed control there are some dog fennell
7. work on bare spots
Page 1 of 5
Permit: AWS78009( Owner: Murphy -Brown LLC Facility Number:780090
Inspection Date:02/09/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Regulated Operations
Swine
Design Capacity Current promotions
❑ Swine - Wean to Finish 41,321
Total Design Capacity: 41,321
Total SSLW: 4,751,915
Waste Structures
Effective Built Closed Designated Observed
Type Identifier Date Date Date Freeboard Freeboard
Lagoon
7071
06/06/2006
I D1/01/1995
19.32
38.00
Lagoon
7072
06/06/2006
D1/01/1995
19.32
35.00
Lagoon
7073
06/06/2006
I D1/01/1995
19.32
41.00
Lagoon
7074
06/06/2006
D1/01/1995
19.32
30.00
Page 2 of 5
Permit: AWS78009( Owner: Murphy -Brown LLC Facility Number: 780090
Inspection Date:02/09/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Discharges & Stream Impacts
Yes
No NA NE
1. Is any discharge observed from any part of the operation?
❑
❑
❑
Discharge originated at:
Structure
❑
Application Field
❑
Other
❑
a. Was conveyance man-made?
❑
0 ❑
❑
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
❑
0 ❑
❑
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
❑
0 ❑
❑
2. Is there evidence of a past discharge from any part of the operation?
❑
0 ❑
❑
3. Were there any observable adverse impacts or potential adverse impacts to Waters of the
❑
0 ❑
❑
State other than from a discharge?
Waste Collection, Storage & Treatment
Yes
No NA NE
4. Is storage capacity less than adequate?
❑
0 ❑
❑
If yes, is waste level into structural freeboard?
❑
5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ larc
❑
0 ❑
❑
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
❑
❑
❑
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
0
❑ ❑
❑
8. Do any of the structures lack adequate markers as required by the permit? (Not applicablE
❑
0 ❑
❑
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑
❑
❑
maintenance or improvement?
Waste Application
Yes No NA NE
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ 0 ❑ ❑
maintenance or improvement?
11. Is there evidence of incorrect application?
❑ 0 ❑ ❑
If yes, check the appropriate box below.
Excessive Ponding?
❑
Hydraulic Overload?
❑
Frozen Ground?
❑
Heavy metals (Cu, Zn, etc)?
❑
PAN?
❑
Is PAN > 10%/10 lbs.?
❑
Total Phosphorus?
❑
Failure to incorporate manure/sludge into bare soil?
❑
Outside of acceptable crop window?
❑
Evidence of wind drift?
❑
Application outside of application area?
❑
Page 3 of 5
Permit: AWS78009( Owner: Murphy -Brown LLC Facility Number: 780090
Inspection Date:02/09/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Waste Application
Yes No NA NE
Crop Type 1
Coastal Bermuda Grass w/
Rye Overseed
Crop Type 2
Crop Type 3
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Rains sandy loam
Soil Type 2
Norfolk and Faceville soils,
6 to 10% sl
Soil Type 3
Goldsboro loamy sand, 0 to
2% slopes
Soil Type 4
McColl loam
Soil Type 5
Lynchburg sandy loam
Soil Type 6
14. Do the receiving crops differ from those designated in the Certified Animal Waste
❑
0 ❑
❑
Management Plan(CAWMP)?
15. Does the receiving crop and/or land application site need improvement?
0
❑ ❑
❑
16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre
❑
0 ❑
❑
determination?
17. Does the facility lack adequate acreage for land application?
❑
0 ❑
❑
18. Is there a lack of properly operating waste application equipment?
❑
0 ❑
❑
Records and Documents
Yes
No NA NE
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
❑
0 ❑
❑
20. Does the facility fail to have all components of the CAWMP readily available?
❑
0 ❑
❑
If yes, check the appropriate box below.
WUP?
❑
Checklists?
❑
Design?
❑
Maps?
❑
Lease Agreements?
❑
Other?
❑
If Other, please specify
21. Does record keeping need improvement?
❑
0 ❑
❑
If yes, check the appropriate box below.
Waste Application?
❑
Weekly Freeboard?
❑
Waste Analysis?
❑
Soil analysis?
❑
Waste Transfers?
❑
Weather code?
❑
Page 4 of 5
Permit: AWS78009( Owner: Murphy -Brown LLC Facility Number: 780090
Inspection Date:02/09/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Records and Documents
Yes
No NA NE
Rainfall?
❑
Stocking?
❑
Crop yields?
❑
120 Minute inspections?
❑
Monthly and 1" Rainfall Inspections
❑
Sludge Survey
❑
22. Did the facility fail to install and maintain a rain gauge?
❑
0 ❑ ❑
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipmen
❑
0 ❑ ❑
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑
0 ❑ ❑
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the
❑
0 ❑ ❑
appropriate box(es) below:
Failure to complete annual sludge survey
❑
Failure to develop a POA for sludge levels
❑
Non -compliant sludge levels in any lagoon
❑
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑
0 ❑ ❑
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification?
❑
0 ❑ ❑
Other Issues
Yes
No NA NE
28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document
❑
0 ❑
❑
and report mortality rates that exceed normal rates?
29. At the time of the inspection did the facility pose an odor or air quality concern? If yes,
❑
0 ❑
❑
contact a regional Air Quality representative immediately.
30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit %
❑
0 ❑
❑
(i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility?
❑
0 ❑
❑
If yes, check the appropriate box below.
Application Field
❑
Lagoon / Storage Pond
❑
Other
❑
If Other, please specify
32. Were any additional problems noted which cause non-compliance of the Permit or
❑
0 ❑
❑
CAW M P?
33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative?
❑
0 ❑
❑
34. Does the facility require a follow-up visit by same agency?
❑
0 ❑
❑
Page 5 of 5