Loading...
HomeMy WebLinkAbout820369_NOV-2023-PC-0612 Enforcement Packet_20230921NOTICE OF VIOLATION AND/OR NOTICE OF INTENT ROY COOPER Governor ELIZABETH S. BISER Secretary RICHAM E. ROGERS, JR. Director \f Qtui'i Na j NORTH CAROLINA Environmental Quality September 21, 2023 CERTIFIED MAIL RETURN RECEIPT REOUESTED 7010 3090 0001 3216 2973 Larry Tanner 2793 Elizabethtown Hwy Roseboro NC 28382 Subject: NOTICE OF VIOLATION/NOTICE OF INTENT Administrative Code 15A NCAC 2T .1304 NOV-2023-PC-0612 Tanner Girls #2 Facility Number 82-369 Permit AWS820369 Sampson County Dear Larry Tanner, On December 21, 2023, staff of the NC Department of Environmental Quality (DEQ) Division of Water Resources (DWR), Water Quality Regional Operations Section (WQROS) inspected the Tanner Girls #2 Farm and the permitted waste disposal system. We wish to thank Mr. Larry Tanner for his assistance during this inspection. As a result of this inspection, you are hereby notified that, having been permitted to have a non - discharge permit for the subject animal waste disposal system pursuant to 15A NCAC 2T .1304, you have been found to be in violation of your permit as follows: DEQfJ North Carolina Department of Environmental Quality I Division of Water Resources v Fayetteville Regional Office 1 225 Green St., Suite 714 1 Fayetteville, North Carolina 28301-5043 NORTHCARouNA 910.433.3300 Department of Emlmnmenfal Duali� Page 2 Larry Tanner September 21, 2023 Violation 1: Failure to maintain the maximum waste level in lagoons/storage ponds that shall not exceed that specified in the facility's CAWMP. At a minimum, maximum waste level for lagoons/storage ponds must not exceed the level that provides adequate storage to contain the 25-year, 24-hour storm event plus an additional one (1) foot of structural freeboard except that there shall be no violation of this condition if: a. there is a storm event more severe than a 25-year, 24-hour event; b. the Permittee is in compliance with its CAWMP and c. there is at least one (1) foot of structural freeboard. — [1 SA NCAC 02T .1304(b)] (Permit No. AWG100000 Section V.2) On December 21, 2023, DWR staff was on site and observed that the Tanner Girls #2 lagoon was currently at 14 inches. The design freeboard for this lagoon is 19 inches. DWR has no record of receiving any notification about the Taner Girls #2 lagoon being out of compliance. Required Corrective Action for Violation 1: Follow the 30-day plan of action that was provided to DWR by Mr. Curtis Barwick on December 23, 2023. In the future maintain your waste level in accordance with your facility's CAWMP. Take all necessary additional legal steps to insure lagoon levels remain in compliance with Section (V2) of your permit. The permit requires the permitee to inspected the structure after all storm events greater than one (1) inch in 24 hours. Violation 2: The Permittee shall report by telephone to the appropriate Division Regional Office as soon as possible, but in no case more than twenty-four (24) hours following first knowledge of the occurrence of any of the following events: e. Failure to maintain storage capacity in a lagoon/storage pond greater than or equal to that required in Condition V. 2. of this General Permit. (Permit AWG No.100000 Section 11117 e). Your permit specifically requires notification by telephone within 24 hours and a written report within 5 calendar days following first knowledge of occurrence of a reportable condition DWR has no record of receiving the 24- hour notification. D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 1 Fayetteville, North Carolina 28301-5043 NORrH CAROLINA 910-433-3300 oepanmem or enmmnmenMl ouai� Page 3 Larry Tanner September 21, 2023 Required Corrective Action for Violation 2: In the event of a high freeboard situation, call the regional office within the twenty-four (24) hours of the first knowledge of the high freeboard. Prepare and submit within 48 hours a 30 day Plan of Action (POA) for lowering the lagoon/storage pond to an acceptable level as described in your CAWMP and General Permit. Violation 3• An inspection of the waste collection, treatment, and storage structures, and runoff control measures shall be conduced and documented at a frequency to insure proper operation but at least monthly and after all storm events of greater than one (1) inch in 24 hours. For example, lagoons/storage ponds, and other structures should be inspected for evidence of erosion, leakage, damage by animals or discharge. Inspection shall also include visual observation of subsurface drain outlets, ditches, and drainage ways for discharge of waste. — [1 SA NCAC 02T. 1304(b)] (Permit No. AWG100000 Section HT 1) On December 21, 2023, DWR staff was on site and Mr. Larry Tanner stated that neither him nor his son Brandon Tanner the OIC had been to the farm since the initial rain event on December 17'h, 2023. Required Corrective Action for Violation 3: The permit requires the permitee to inspect the structure after all storm events greater than one (1) inch in 24 hours. In the future the OIC or someone working under the OIC needs to inspect the farm within 24 hours after a one inch or greater storm event. The Division of Water Resources requests that, in addition to the specified corrective action above, please submit the following items on or before (30 days after receipt of letter): 1. An explanation from the OIC for this farm regarding how these violations occurred. 2. A list from the OIC concerning the steps that will be taken to prevent these violations from occurring in the future. 3. Send DWR your freeboard and rainfall records from July -December 2023. 4. Send DWR your IRR-2 records from July — December 2023. D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 1 Fayetteville, North Carolina 28301-5043 NORrH CAROLINA 910-433-3300 oepanmem or enmmnmenWl ouai� VIOLATORS RESPONSE AND NOTES Page 5 Larry Tanner September 21, 2023 You are required to take any necessary action to correct the above violations on or before January 30, 2024 and to provide a written response to this notice 30 day after receipt of letter. Please include in your response all corrective actions already taken and a schedule for completion of any corrective actions not addressed. As a result of the violations in this Notice, this office is considering a recommendation for a civil penalty assessment to the Director of the Division. If you wish to present an explanation for the violations cited, or if you believe there are other factors, which should be considered, please send such information to me in writing within ten (10) days following receipt of this letter. Your response will be reviewed, and, if an enforcement action is still deemed appropriate, it will be forwarded to the Director and included for consideration. Failure to comply with conditions in a permit may result in a recommendation of enforcement action, to the Director of the Division of Water Quality who may issue a civil penalty assessment of not more that twenty-five thousand ($25,000) dollars against any "person" who violates or fails to act in accordance with the terms, conditions, or requirements of a permit under authority of G.S. 143-215.6A. If you have any questions concerning this Notice, please contact Katie Fontenot (919) 896-9715 or me at (910) 433-3336. Sincerely, Mark Brantley Regional Assistant Supervisor Water Quality Regional Operations Section Division of Water Resources cc: FRO Compliance Animal Files-Laserfiche-82-369 D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 1 Fayetteville, North Carolina 28301-5043 NORrH CAROLINA 910-433-3300 oepanmem or enmmnm W. ouai� Form IRR-2 Lactoon Irrigation Fields Report REPORT DATE: 2/26/2024 One Form for Each Field per Crop Cvcle TRACT # 1 Field # 1 &42 - 1 FARM NAME OR #: Tanner Girls #2 Fields Size (acres) _ (A) 6.84 .ate �- FARM OWNER: 'Larry Tanner Irrigation Operator Owners Address 2793 Elizabethtown Hwy Irrigation Operator's Roseboro NC 283M2 Address _ Owners Phone (910)-987-4733 Operator's Phone # From Waste Utilization Plan T Crap Type BERMUDA/RYE 3101-10101 Recommended PAN 310 235 --- 75 Loading (Ibs/acre) _ (8) (1) (2) (3) (4) (5) (6) _ (7) (8) (9) (10) (11) First Crap (11) Double Crop Date Start End Total # of Sprinklers Flow Rate Total Volume Volume Waste Analysis PAN Applied Nitrogen Balance Nitrogen Balance mmldd/yr Time Time Minutes Operating per Acre PAN (lbslacre) (lbslacre) Lagoon (gallmin) (gallons) (gal/acre) (lbs/1000 gal) (lbslacre) Before 10101/2023 After 10/0112023 Weather lnsp ID (3)_(2) (6)x(5)x(4) 71(A) See (9) Below (8)x(9)/1000 'See (11) Below 'See (11) Below Code Initials 2 3111 /2023 8:00 AM 930 AM 90 1 84 7, 560 1,105 1.30 1.4 + 234 + 75 C BT 2 3/16/2023 8:00 AM 9:00 AM 60 1 72 - - 4,320 - - 632 1.30 0.8 + 233. + 75 C BT 2 3121 /2023 10:00 AM 11:00 AM 60 1 72 4,320 632 1.30 0.8 + 232 + 75 C BT 2 3/30/2023 8:30 AM 10:00 AM 9O 1 60 5,400 789 1.30 1.0 + 231 + 75 C BT 2 4/14/2023 8:00 AM 9:30 AM 90 1 60 5,400 789 1.30 1.0 + 230 + 75 C BT 2 4l2812023 8:15 AM 9:30 AM 75 1 72 5,400 789 1.30 - - 1.0 + 229 - + 75 C _ BT 2 5/4/2023 7:30 AM 9:00 AM 90 1 60 5,400 789 1.30 - 1-0 + 228 - - + 75 C BT 2 5/19/2023 8:00 AM 9:00 AM 60 1 72 4,320 632 1.24 0.8. + 227 + '75 C BT 2 5131/2023 2,00 PM 3:00 PM 60 1 96 5,760 842 1.24 1.0 + 226 + 75 C- 8T 2 612112023 12:00 PM 1:30 PM 90 1 72 6,480 947 1.24 1.2 + 225 + 75 C - BT 2 6/16/2023 10:00 AM 11:00 AM 60 1 72 4,320 632 1.24 0.8 + 224 + 75 C BT -- - -- - - - - - - 2 5 2 6/24/2023 10:00 AM 11:30 AM 90 1 60 5,400 789 1.24 1.0 + 223 + 75 C BT 2 6/24/2023 12:30 PM 2:00 PM 90 1 72 6,480 947 1.24 -1.2 + 222 + 75 f C BT 2 6/25/2023 7:00 AM 8:30 AM 90 1 60 5,400 789 1.24 1.0 + 221 + 75 C BT 2 6/25I2023 9:30 AM 10:30 AM 60 1 -- 84 5,040 737 _ 1.24 0.9 + 220 + 75 C BT 2 6/2512023 11:30 AM 1:00 PM 9Q 1 72 6.480 947 1.24 1.2 + 219 + 75 C BT 2 6l2512023 2:0-- PM 3:00 PM J &0 1 -- - 80 3,600 526 1.24 - 03 + 218 + - 75 C BT (9) NCDA Waste Analysis or Equivalent or NRCS Estimate, Technical Guide Section Owner's Signature (11)Enter the value recieved by subtracting column (10) from (B). Continue Certified Operator (Print) LIJ� subtracting column (10) form column (11) following each irrigation ev Operators Signature 1 of 4 Form IRR-2 REPORT DATE: TRACT # 1 Field # Fields Size (acres) = (A) FARM OWNER: Owner's Address Owners Phone Lagoon Irrigation Fields Report 2/26/2024 One Form for Each Field per Crop Cvcle 10742 1 1 FARM NAME OR #: Tanner Girls #2 6.84 arryT r r :. Irrigation Operator 2793 Elizabethtown Hwy Irrigation Operators Roseboro NG 28382 Address (910)-987-4733 Operator's Phone # From Waste Utilization Plan Crop Type BERM%IDAIRYE 3101-10101 Recommended PAN Loading (Ibslacre) = (B) 310 235 --- 75 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Date Start End Total # of Sprinklers Flow Rate Total Volume Volume Waste Analysis PAN Applied mmlddlyr Time Time Minutes Operating per Acre PAN Lagoon (gal/min) (gallons) (gal/acre) (ibs11000 gal) (lbslacre) ID (3)-(2) (6)x(5)x(4) 71(A) See (9) Below (8)x(9)11000 (11) First Crop Nitrogen Balance (Ibslacre) Before 10/01/2023 "See (11) Below (11) Double Crop Nitrogen Balarce (Ibslacre) After 10/01/2023 *See (11) Below Weather Insp Code Initials 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 6/25/2023 4:00 PM 5:30 PM 90 1 60 5,400 5,400 6,480 5,400 789 789 - 947 1.24 1.0 + 217 + 75 + 75 - + 75 C BT 6/28/2023 7/7/2023 8:00 AM 9:30 AM 90 1 60 _ - 1.24 1.0 + 216 C C BT 1:00 PM 8:00 AM 7:00 AM 11:00 AM 8:00.AM 8:00 AM 8:30 AM T30 AM 7:30 AM 8:00 AM 8:00 AM 11:00 AM 9:45 AM 7:00 AM 9:00 AM 2:30 PM 9:30 AM 90 1 72 - - 60 1.24 1.24 - - - 1.2 + 215 BT 7/13/2023 90 1 789 1,105 1.0 + 214 + 213 + 75 C BT BT-- 7/17/2023 8:30 AM 12:30 PM 9 30 AM 90 1 84 72 60 60 7,560 6,480 5,400 1.24 1.24 1 A 1.2 + 75 + 75 + 75 C C 7/21/2023 90 1 947 + 212 BT 7128/2023 90 90 90 90 90 90 90 1 1 1 1 789 789 789 - 947 789 11105 1.24 1.0 + 211 C BT 7/30/2023 9:30 AM 5,400 5,400 6,480 5,400 7,560 6,480- 5,400 2,700 1.24 1.0 + 210 + 209 + 207 + 206 + 75 + 75- - C C BT 8/1/2023 10:00 AM 9:00 AM 9:00 AM 9:30 AM 60 72 60 1.24 1.24 1.0 BT BT 8/5/2023 12 + 75 + 75 + 75 C 8/9/2023 1 1.24 1.0 C C 8T 811612 223 1 1 84 1.24 1 A + 205 BT BT 8/23/2023 9:30 AM 12:30 PM 10:30 AM 72 60 .60 947 789 395 789 0.87 - - - 0 8 + 204 + 75 C 8/24/2023 90 45 1 0.87 0.7 + 204 + 75 C BT 911 /2023 1 0.87 0.87 0.3 + 203 + 75 C BT 912/2023 8:30 AM 10:30 AM 90 1 60 72 5,400 6,480 j 0.7 + 202 + 75 + 75 C BT 9/2/2023 90 - - ` 1 947 0.87 - - 0.8 + 202 C BT (9) NCDA Waste Analysis or Equivalent or NRCS Estimate, Technical Guide Section (11)Enter the value recieved by subtracting column (10) from (B). Continue subtracting column (10) form column (11) following each irrigation ev Owners Signature Certified Operator (Print) r, M f3rahjon ��nrrr Operator's Signature 2 of 4 Form IRR-2 REPORT DATE: TRACT # I Field # Fields Size (acres) = (A) FARM OWNER: Owner's Address 2/26/2024 10742 Lagoon Irrigation Fields Report One Form for Each Field per Crop Cvcle 6.84 2793 Elizabethtown Hwy Roseboro Owner's Phone (910)-987-4733 Irrigation Operator Irrigation Operator's NC 28382 Address Operator's Phone # From Waste Utilization Plan FARM NAME OR #: Tanner Girls #2 BERMUDAIRYE 3101-10101 Crop Type Recommended PAN Loading (Ibs/acre) = (B) 310 235 --- 75 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Date Start End Total # of Sprinklers Fiow Rate Total Volume Volume Waste Analysis PAN Applied mmlddlyr Time Time Minutes Operating per Acre PAN Lagoon (gal/min) (gallons) (gal/acre) (lbs11000 gal) (Ibslacre) ID (3)_(2) (6)x(5)x(4) 71(A) See (9) Below (8)x(9)11000 (11)First Crop Nitrogen Balance (Ibslacre) Before 10/01/2023 *See (11) Below (11)Double Crop _ Weather Insp Code Initials Nitrogen Balance (ibs/acre) After 10/01/2023 `See (11) Below 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 9/2/2023 11:00 AM 10:00 AM 12:30 PM 90 1 60 5,400 789 1,105 0.87 0.87 0.87 0.7 + 201 + 75 + 75 + 75 C C C BT 9/3/2023 9/3/2023 11:30 AM 90 1 84 7,560 6,480 5,400 1.0. + 200 + 199 + 199 + 198 + 197 + 196 + 196 + 196 + 196 BT 12:30 PM 2:00 PM 9:30 AM 90 1 72 947 0,8 BT 9/8/2023 8:00 AM 9:00 AM 90 1 60 789 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.7 + 75 + 75 + 75 + 75.. - + 74 - - + 73 - + 73 C C - C C C BT 9/1212023 10-.30 AM 90 94 - - 1 60 5,400 5,400 - 6,480 789 789 0.7 BT 9/2112023 9/28/2023 10/14/2023 10/15/2023 10/19/2023 11 /10/2023 7:30 AM 9:00 AM - 1 6.0 0.7 BT 8:30 AM 9:00 AM 1:00 PM 8:30 AM 7:30 AM 10-00 AM 10:30 AM 2,30 PM 90 ! 72 947 0.8 BT 90 90 60 60 90 -- 1 1 1 1 1 1 60 5,400 7;560 4,320 789 1,105 632 526 789 0.7 BT 84 1.0 C BT 9:30 AM 8:30 AM 72 0.5 0.5 C C BT 60 3,600 5,400 + 196 + 196 + 196 + 196 + 72 BT 11/2412023 11/2512023 11:00 AM 12:30 PM 60 0.87 0.87 0.7 + 72 C LT 8:00 AM 9:00 AM 60 60 3,600 41320 526 632 0.5 + 71 C LT 12/4/2023 12/8/2023 12/23/2023 12/24/2023 11:00 AM 2:30 PM 12:00 PM 4:00 PM 60 1 72 0.87 0.87 0.5 + 71 C BT 90 1 .60 5,400 789 1,263 0.7 + 196 + 70 C BT 7:30 AM 9:30 AM 120 1 72 8,640 4,320 1.29 -- 1.6 + 196 + 196 + 68 C C BT 3:00 PM 4:00 PM - 60 1 72 632 1.29 0.8 + 68 LT (9) NCDA Waste Analysis or Equivalent or MRCS Estimate, Technical Guide Section (11)Enter the value recieved by subtracting column (10) from (B). Continue subtracting column (10) form column (11) following each irrigation ev Owners Signatur Certified Operator (Print) Operator's Signature • /}� - d_ / ,,,/ _ 3 of 4 Form iRR-2 Laqoon Irriqation Fields Report REPORT DATE: 2/26/2024 One Form for Each Field per Crop Cycle TRACT # I Fleld # F-10742 1 FARM NAME OR #: Tanner Girls#2 Fields Size (acres) = (A) 1 6.84 FARM OWNER: Larry Tanner Irrigation Operator Owners Address 2793 Elizabethtown Hwy Irrigation Operator's Roseboro I INC 128382 Address Owners Phone (910)-987-4733 Operators Phone # From Waste Utilization Plan Crop Type J BERMUDAIRYE 3101-10101 1 Recommended PAN 310 I Loa235 --- 7� Loading (lbs/acre) = (B) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Date Start End Total # of Sprinklers Flow Rate Total Volume Volume Waste Analysis PAN Applied mmlddlyr Time Time Minutes Operating per Acre PAN Lagoon (gal/min) (gallons) (gallacre) (Ibs/1000 gal) (Ibslacre) ID (3)-(2) (6)x(5)x(4) 71(A) See (9) below (8)x(9)11000 (11) First Crop Nitrogen Balance (lbs/acre) Before 10/01/2023 'See (11) Below (11) Double Crop Nitrogen Balance (Ibs/acre) After 10/0112023 "See (11) Below Weather Insp Code Initials 2 2 2 2' - 2 2 12/26/2C23 8:00 AM 9:30 AM 90 1 48 60 48 72 4,320 51400 4,320 6,480 632 1.29 1.29 f 0.8 + 196 + 67 + 66 - + 65 C -C C LT 1/4I2024 117/2024 2 30 PM 10:30 AM 130 PM 4:30 PM 4:00 PM 12:00 PM 90 1 789 632 947 1.0 + 196 BT 90 90 90 90 1 1 1.29 0.8 + 196 + 196 ^+ 196 + 196 BT 1/14/2024 5:00 PM 1.29 1.2 1.0 - + 64 + 63 _ + 61' C - BT BT 1/22/2024 6:00 PM 1 60 72 5,400 789 1.29 C 1l26/2024 1:30 PM 3:00 PM 1 6,480 947 _ 1.29 1.2 C BT Li HOURS LEFT TO PUMP ON ENTIRE FIELD USING THE 241.0 Before 10/01/2023 F 0 316,980 CROP CYCLE TOTALS 5Y '(+) NUTRIENT NEED -(-) NUTRIENT FxcEss CURRENT SAMPLE ANALYSES 75.4 After 10/01/2023 ..- HOURS LEFT TO PUMP ^,-- caution should be taken when using this estimate as it approaches zemi This is an estimate and factors such as changes in application rates (gpm) and fluctuations in lagoon analysis (especially during winter months) may cause it to be incorrect! Failure to allow for such changes can cause over applications! (9) NCDA Waste Analysis or Equivalent or NRCS Estimate, Technical Guide Section (11)Enter the value recieved by subtracting column (10) from (B). Continue subtracting column (10) form column (11) following each irrigation ev 4 of 4 Owners Signature _ Certified Operator (Print) i'� AAA t4,"� Operator's Signature 41� 1-1a3 .2-3 fIVp3 7123-d3 ?7� 379 �-t3•a3 �� �r�d3° a 11�3 19V �l $o► 359 ?a-17-a3 a2t�i� Jq .14 fo. Smithfield. 2024 Daily Rainfall/Weekly Lagoon Level Record Farm: 114 oz - January Freeboard structural February Freeboard Structural SUN MON TUE WED THEIR FRI SAT OIL& SUN MON TUE WFU THUR FRI SAT Check _ 1 2 a s 5 6 � , z a ` 1 7 fl 8 � 10 1, � 12 17 4 1 � 14 15 I6 —T 17 tQ 115 20 1 S 12 16 __.— 14 15 18 17--_—----- i-; 21 22 23 24 25 26 -- ; 7 �..T� I B 1 B 20 21 22 23 24 7.8 24 36 71 _ 25 26 27 _ 28 29----------- March Freeboard Slfurturil April Freeboard Structural ---. ---. .... —�--� Check --- Check MON TIA 111UR FRI SAT SUN MON TUE WED 1'HUR FRI SAT 77 1 2 3 4 5 6 q3 8 i U 4 7 6 9 10 11 1'2 57 13 14 ,5 to T le T6 16 17 is 18 19 20�� 21 22 7.3 7i 'j2 27 2a 25 26 27 ----_ 2d 25 25 27 28 2,9 30 2d 20 .. ....: I_ _ _. ......... ....... . May Freeboard 5lruaural June Freeboard Structural SUN MON TUE WED THUR FRI SAT Chock SUN MON TUE WED THUR FRI SAT Chock 2 3 q i d� 5 8 7 8 9 10 11 1 5 4 12 S 3 T f 4 Y-.— 15 -�--- 18 17 18 B 10 11 20 21 22 23 7.4 25 1& 17 �- 18 19 20 21 22 27 28 24] "Su :dl 7� 7a 2i 28 27 - 26 29 i. ... ...... . Record rainfall daily. If daily rainfall totals 1 inch or greater, initial in hox that lagoon integrity has been checked. If precipitation is snow, note as S on date. F7 niP nNnn Pi 6-4 ";".— P.,", , of '� fin„�clnn If! I -I !?rl1't9 Smithfield. 202 C)ood t—A �iz�p�"s'6�"� Daily Rainfall/Weekly Lagoon Level Record 1 &rrn: LARRY TANNER 2793 ELIZABETHTOWN HWY ROSEBORO, NC 28382 February 23, 2024 Mr, Mark Brantley Regional Supervisor North Carolina Division of Water Resources Water Quality Regional Operations Section 225 Green St, Suite 714 Fayetteville, NC 28301 Dear Mr, Brantley In response to your Notice of Violation/Notice of Intent (NOV-2023-PC-0612) of February 2, 2024 and received by me on February 14th, for Tanner Girls Nursery #2 (82-369) l submit the following: Violation 1: Failure to maintain the maximum waste level in lagoons that shall not exceed that specified in the CAWMP. At a minimum, maximum waste level for lagoons must not exceed the level that provides adequate storage to contain the 25-year, 24-hour storm event plus an additional 1 foot of structural freeboard. On December 21, 2023, the freeboard in my lagoon was 14" after a heavy rain event of December 17, 2023. 1 was at home in bed recuperating from surgery on December 15111 and I was in the hospital until December 181h, I was not allowed to drive for several days while at home. My son Brandon was with me in the hospital and my worker did not notify me of the freeboard violation as he stated the farm was OK, The pits were not full during this time also which resulted in a higher than normal freeboard_ I will work to keep my lagoon out of the red area in the future. I am working to secure land application sites for my sludge which is keeping me from pumping my lagoon as low as I would like, I have only owned the farm a couple of years and have been concerned about the sludge level. Violation 2: Failure to report by telephone within 24 hours following first knowledge of non -compliant lagoon levels: My first knowledge of the freeboard encroachment was on December 2161 when Mr. Steve Guyton arrived at my farm and I met him there. I did not realize my lagoon was non -compliant. In the future, I will make certain to notify the Fayetteville Reginal office if any lagoons become non -compliant. I have trained staff to notify me immediately at first knowledge of non -compliant levels. A communication breakdown occurred and that will not happen again. A 30-day POA was filed on December 231d and I was back in compliance well before its expiration_ Violation 3: Failure to inspect the structure after all storm events greater than 1" in 24 hours. I was not able to visit the farm due to my surgery and my son Brandon did not check the farm after the rain event of December 171h due to being at the hospital with me and relied on my farm worker. We are currently visiting the farm after every rain event and are inspecting all components of the system after every 1" or greater rainfall event. It is my sincere hope that the our current plan will be sufficient to ensure that these violations do not occur again in the future with either my son or me checking the farm more closely. I hope that any fines associated with this incident will not be levied. I would be happy to discuss this incident Further and can be contacted at 910-987-4733. Sincerely, Larry Tanner SITE PHOTOS KIP %PP W I; . . . . . . . . . . . . Aim ..... . . . . . . 1. A, fA AA ti,a 71 :jr ,1 .6