Loading...
HomeMy WebLinkAboutNCC241262_Site Plan or Location Map_20240424 \ \ D������7�n ��1 T�7,t L CONSTRUCTION SCHEDULE DATE. PAGE: \ .--- --\ \ \ \ Rockfis -Road SR-14O6 ` I.Obtain all necessary permits and pUn approvals Erosion and Sedimem Conmol(E&SC)permit and a Certificate of Coverage l / \_ \ (CO.pibebepi onsidbefontabl indryennits box, ondaec.sir.Aenpy iof nspection. MSC permit,the COC ands hard copy of the ill C/ - ` \ con preferably per its box mdax ed during cinsp Don 2. I I f then silt fences,reinforced'1(epee outlets and wattles. \\\\ GGNST- GTION J 3.Finish I B dgrubbing [on areas onthe lots as they tattM. u u \ TRANCE SILT-1 I 4.Beg I grading d rt� R� p p f! ✓! / J'y�'i� ' E .Bognor connnuewrM1 Foote construe \ \ / // REINFORCED GILT iy~•• WATTLE I 6.Finish all rough grading:end house crosnucnon.All areas not disturbed for 7 days needs to have temporary or pefmarem t 4 ' ' Wt: CONTIO gldr . :fi remain in a - L Nol J Y ,•4 Ir `�p ��� `jU/ 10.Thehll d If'pet of the and sedimentation co..measures and complete the following 1 ROADWAY Ul I �'O % I \\ \ \ -�y,11 FEttrJNC tf• ET E_ I / combined self-inspection f found M1 DEMLR bs water pros CURB Eor cUxe AT Ro r AY �ROA AY b 0 \ \\ \ \ 4_ / h r htrys://www deq.nc.g°v/abouUd'.. gy 'veal nnd IarW resold / am'npdes comtrurom progarm G L UR RO AYLEoc Notes ROCKFISH ROAD .. / '1 Twelve monde of completeinspection forms shall be kept on site d Table for inspection at afi timce If is recommended llf needed,Tree Protection fencing shouts be installed along the buffer zone wetland b \ \\\ \ �- -_V / 29 TILE3 •¢I / / copy be kept in a permits box Ref G S.113A 54.1 through G S 113A 57 Sections ISA NCAC 114A 0101 through ISA boundary and/or around protected trees,provitl fig a radius of at leas[1.25 feet for each 9R- A O NeAC 04E.050.1 Genera Permit NCO 010000 NPDES for Construction Activities. LEGEND \ \ -- ------ \ / / CONSTRUCTION !� i SILT Self-inspectionsfor erosion and sedimentation control measures are to rformed al eve lender des d inch of trunk diameter. �/ performed every calendar days EN TRANCE - PI(/ 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on I \ \ -20•�-r,il,T, FES7aT j xithin l4 M1uun of very rain event of greacer Nanlinch.Any erected repmn shall be made immediacely to maincein measuressarv\ - - .✓ -_- - / leesM1gned.AIILSC measures shall be mainainW nnspwifiW ldWe comcvuaion details on this plan.Amingmge shag be wsallW (= achematicldlegram end fold edlusted.ftneca558ry,for placement et low points.If lots ere �II' ITI ire project site for monitoring. contiguous antl have different land owners or builders.each lot shoultl have individual Silt /`141\ �� / I12.Inspccrion mdfrWaccepanceleaers.whenMeprojectiscomplete,the perminecsshallmnactDLMLRrocloseout MeFBSC ences.SI \ 28 / 4 Plm.Alkr DEAg.RinformsWe petmiueeof We projectclos<om,vsa ivspenionreport,lM1e perminee shall visit BNTRAN ® 3.Install required Silt Fence within 10 feet of property line to ensure there is no conflict with \\ n LOt PIa "dw.nugov/NCOOI"tu submit an electronic Notice of terminiim(e-NOT).A S120 annual general permit fee will be charged septic system.It is the responsibility of the builder to ensure the installation of sediment / 4l ( until the a-NOT has been fined out CURB INLET = control measures does not impact the septic system and repair area(s). Rx2IPPICNURCe ROAD ? \ \ \ _ i -` ✓N• \ \ a.At leas[one Construction Entrance/Exit is to be installed per lot. sR-14n 5.Waste bins and other areas dedicated for managing building material waste shall be at " \ \ - 27 Q 1\ 1 least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that \ 5 \ CONSTRUCTION no other alternative exists.If this separation cannot be achieved these areas must be rQ� A'SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY \ 21 DRAINAGSEMENT I� Lot Plan LIMITS contained behind Silt Fence. ��0� - \ NCGS 113A-54.1•IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 6.Inlets downstream of disturbances should\\ / _ ��B�� protected;streets should be swept when COMPLETED AS AN EXCEL SPREADSHEET. sediment from the cNOBPeon activity �� /� AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED ls present. \ P , ..\NC-Environmental.jpeg 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are 11. . re EROSION AND .3 3 ✓ 6 provided on additional sheets.Erosion and sediment control details are not drawn to scale. t� / Q Lot Plan 1p SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 16A TYPICAL LOT LAYOUT WITH CURB AND GUTTER \� \ NCAC 046.0131 STATES THAT....DOCUMENTATION SHALL BE ACCOMPLISHED BY 792 / / H. OPEN INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE \ E APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, \ a //\ ' SPACE \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, DATE: PAGE: _ ' PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION SS/ / / d\ \t•an \ \ \ CONTROL PLAN." / "Hj �15'ACCESUS ESMT \ \�` \ \ '25 $ CONSrRUCTION VICINITY MAP = ( LD=Plan �1TB �•'N.T.S. - - - ?dP eB„ A \ \ Qua Anti I - - ,,,S,b, `,g,70 =,cOV \ \ \ QJ`0 / v. ?� �... ,wTa`'«"o.,,apaa \'''',,,v4„,,. DATE: PAGE: � \ 40 6't Sock/Watt Silt Sock/wattle NOTE: \ / 'r:, 9�\\ , ' \ \ �44 ..I= aa Area to he Ebc, 3"Mt Area to. , Other mat..providing equi.lent pro.. -tl to�I 2. F711 • P°d \ Consimchon M t \iIStokes Stakes a. • all ` �\ 44,4S , �1414$0#. :I' �a \ 11.Clear the entrance antl axtt area of all vegetal on roots antl other object°noble 1.P NCGA1' p ct t k tl ft h1'ctt or sEcnaN e[cT oN LI metenal andproperly grade tg t rf If k y g tl p H t ly.41p# a.a minimum of 10 feet beyond the tre of a Ito410-.. \ 2.Placethe gravelto the apeufic gretle antltlmensona shown on the plans antl 2Ma ntantn g Ip d- dt t p et tl dment a ` \ 1 •I / s smooth It from leaving the construction site.This may require periodic �o emwame(l%h°uld eetumeand slightly eooaem 1)))6 / / , 3.Providedrainageolh7s'water radean entdim trap or other suitable outlet. toptlressing withelkpea tone. Jo ° 8 ame(almg fig fie den to MI / ' vii„ \ \ \ 4.Use geotextile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or inch x 2 inch cross section should I / #11111#202 \ subject to seepage or high water table. Vackea onto public roadways. center$1 I a. Oak or other durable hardwood stakes with a 2 �\ \ I 41k (-- \ \ \ \ CONSTRUCTION ENTRANCE/EXIT mxi maximum s«`,amoral placed of8M leamaMmnm interval rmeb in tuna if des mma4md • W MaleA TI Corn %t gronna 4 Min sock/ ',warm.) .-EI� \ To 1/2 height of l09 s. In me event staking Is not P°ulde(Ie.wMn ttles are m ai NTRENCHED INSTPllATION ENTRENCHED %Inspxtadn ecdNxa in pia behind concrete blocks.all be e silt E� \ MRENCHED MAINTENANCE: ENAN E:orgrea eereeea 1. mu UmMUMMY.maarmsawuamw,a. sock/wattle hold NG ISOMETRIC each 1 leant Weekly oroardafter \ \ �\\ \\ EAU€ \\ \ \ \ SODDING m,Dn�nndawka Paaad p�FInpMmNar=m,m ; Lrrpw )«n.m, a,7,,,n �r.adequatenow. ltgg or \ed sediment and any debris as \ SOP INA STAGGERED MU,.Or COmp001 \•\�\\ \fe # N\ \\\�\ \\ mil \� a°Na'inirimeBrf ahemn° BeCompost ` \ \ �� ORM 9TER d� �siNtsgek/e"„'"47) c mi ire ) (mom) c>rZ' (a4'm) % \ I \ \TREA�TM ENT- \ #401 \ \ \ \e XOaµOTa HMN%PECES w°rkone f wet le "T"W; ate '�;:" i;;" ec;ee° size" ap3;R a. meaaam ban�• gePaa�ra�°Ni aleoew• a \ \ \ \ - ,,�`�s \ \\\\\\ \ \ \ \\ \ MIAS-ANGLED... m/m) /m/m) /m/m) /m/m) P d a ae \ \\ \� \ \\ - \ 'o:°5 \ \ `\ \ �� eTeNEpe°RE LY. m Dcar1ERMSILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION \ - / // \\\ \\\\\\ \� \ \ pG P N \ \ I \ \ DATE: Wire rent Filter rabic PAGE: \ ( \\\ \ \ ` ` 1g \ / ^� \ \\l \ I I I \ \ \ \ steel Post sMex Emes g arc utwreten Wre Fence Wire B dkComren inCC Max.Standard Strength fah.with wire fence . 100, .... . -..... \ \�/, \ l \\\- \ \\ r�\\ AO \ I I \ \ I III, inorongNlyae \ I \ \ \ / I I Y tool Steel Post \ ;,; ___ I \ Sul ill Idllll I,II III - Dg%lap. \ �� \ - \� / i)) I 60D IS wTHTHeaat TA.r 0.1 AS E « S.SEF EMOWER WrePlast t or ea f -� �� ��\ - / 1 ten neo-erKh a�n GROUND STABILIZATION �\ �� 1\\\ \ \\\ - /�/-�� \� //l // / I I I \ \ \ \\ APPEARANCE OF GOOD SOD e, �(�(}( fala?g• SITE AREA STABILIZATION ..N"--------,... \ I \ / I\ \ t �I�tl9� N% , 4 7 x t DESCRIPTION TIME FRAME EXCEPTIONS \ \ \/�- /// I I I \ \ \ II�II����li�l ��I �III Lrlxer Fabric 1 \ SITE DIKES, 7 DAYS NONE \--N.,: \ \ OPT / /�� ��� \\ nm. 1. annrun strong.Gramm strong.syTmwafilter aa'ns CROSS SECTONVEW SWALES,DITCHES 1 \ \ SP7R�F// ///�\\ / I ` '- 2.Ensure that.nm�%Impound n b nre'm re me amend(Higher fences &SLOPES \ \ \� \\\\\ - I I I I I ( \ \\N \\\ \ � � amnnrn nmaa�mM.r %grwarersamcemmcausefa�regrmeshun HIGH QUALITY 7 DAYS NONE \ \_ \ nrelrf:uroihen.cioth old ataao the pOSI with wan a feet mi to rl pro the eye oOSI. WATER ZONES \ 4.Support marengtnnnerabembybwlre mesh tamened.cnrepm the apslope aide of me posts.Extend fiance: (HOW) ` \ \\� �� \ \ \ \ N \ the wire mesh support to the bottom of m`nsl>en aealmem antes at Ieest once a wank end a.each 1 strength.a ups lope m°or greater rainfall.Make an readred repairs Immediately. SLOPES STEEPER 7 DAYS IF SLOPES ARE General the Erosion Control Notes Mal Should es febdnla a Sediment fence collapsetea,dew P I\\ 5.when a wire.ground anin�rn.20 spaceSide of Me fence posh Wire or plastic*. amaMmgm ore Net apart.sgvv°a%%Dula he amen THAN 3:1 10'OR LESS IN \� 1 (IC \ \ \ \\ DocEctra yrength do or become `adepositts as neunatryto provide adequate LENGTH AND ARE � -� \\ I N \ Nott.only the O e shown shall be disturbed. 6.fastenMe filterfoenicdir.y to ppo:is Wireor plan zip.:nmenvemae mm�umof50 pound see storage volo `forthe next rein and re..pree%vre on e NOT STEEPER 1 \ \ \ M 2.All di Curbed a shall be grassed a d B fence.Take caret°avoid undermining the fence donna m \ �� � N \ \ mm Iched a s pissible d Ointained 7.exv`°ogaie the pang apwoelmahly 4 InchesM.an.inches deep along the proposes line ormeP..and desm THAN 2:1, 14 \ �� �\ \ \ until pemanent cover s established. fencing mare..and Unnable sediment aem%it% DAYS ARE \ \ �\ \\ ` N q� au Po%0pizm.nrenceeraenm0 eelterside ae the tcampe Remove all lin area to beredaane%aeb,ied the done pnm ALLOWED --�\ \\\ �\\\ \\ \\� .' eaekfilmamneh wlmmgva overt nnerahne one camped. a compaction of baekfiu�s 4 drainage area has even properly stabilized. ,xmralmdufenca performance. SLOPES 3:1 OR 14 DAYS 7 DAYS FOR `- - N \ \\ attach al M.N.veer. cmn ch FLATTER SLOPES GREATER �- N N__. \ �\ \ \ �\ \\ \\ \\ THAN GO IN �� \ �i \ ..\NC-Envir.nun Cd.jpey LENGTH / \�� \ \\\\ \ \ \\ \ SILT FENCE _ \\ 1 _ �\ \N\ _ . rrrrcrltru r t r,,,r, ALL OTHER AREAS 14 DAYS NONE(EXCEPT _ N WITH SLOPES FOR PERIMETERS /\ \ \�\ -� \\\\ \\ _ FLATTER THAN 4:1 AND HOW ZONES) / ' \\ \ \\\ \� \\ \ \\ - DATE: 4 MIN. FENCE PAGE: , �/ \\ / \\ \ \ \\ \\\\\ �� � � - \ / \\ �� � � 11 \� PAGE1of2 \-- _7_ �_ \ / \ \ \\ \ 11 \ \ TOTAL DISTURBED ACREAGE: 1.41 ACRES 1 I i LOT EROSION CONTROL PLAN TOP OF SILT FENCE ( - �� / \ \ \\ \ LOTS 1 8 MUST STEEL ABOVEHEW THE SHEDE AT ^�\\\ ) \\ \\/ \ "\ BLACKHAWK HARDWWIRE ARE CLOTH\ FRONT VIEVY - ��^_N \\ �- ( / / -� 1 \ \\\ /)/ LANDING FENCE \ / FOR \\\ MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION DREAM FINDERS FILTER OF STEEL FENCE WASHED STONE S FILTER FABRIC INTO SOLID GROUND POST SET MAX CLOTH IN TRENCH General-All measures will be inspected and corrections made after runoff producing rainfalls,or et least once per week minimum.The builder will insure that the construction activities on any particular IoI do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be z6T ON GROUND NOTES: H. s APART MINAS. AND HARDWARE relocated on the lotto insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and ravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper round stabilizing cover. HOMES L LC Ills1.Hardware cloth and gravel should overlay the silt fence atleast iz P P 9 99 9, 9 9 P P 9 9 �°o&so�" inches. Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all McLAUCH LI N TOWNSHIP HOKE COUNTY a 2.Stone outlets should be placed on low elevation areas of silt fence objectionable materials spilled,washed,or tracked onto public roadways. and based on field conditions. Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE:1"=100' MARCH 2024 MAINTENANCE: that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. BURY WIRE FENCE AND a amps,,p,as,B Epos oP 1.Per natCG-01,inspect outlet er lestanynsoewrekpad cs fter immediately. on Sodding The sod should be maintained to insure that the take holds in the areas beingsecured.The sod should be watered as necessary to maintain adequate moisturethe root zone andprevent dormancyof the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE HARDWARE CLOTH FILTER FABRIC IN TRENCH greeter rainfall event Complete any required repairs immediately. q- root bed. grasslotionry quote in quote gro too 0 50 100 200 400 2.Freshen stone when sediment accumulation exceeds 6 inches. and stabilization of the bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. 3.Keep mesh tree of debris to provide adequate flow. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MMI eocnloNvevc a.Remove sediment when half of stone outlet is covered. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. 5.Replace stone as needed to facilitate de-watering. ..\NC-Enar enlrn.Jpeg Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) SILT FENCE OUTLET sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. t inch = 100 ft Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:3/19/2024 9:28 AM LAST PLOTTED:3/20/2024 7:26 AM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H Ea H CONSTRUCTORS\23-1367-D3 BLACKIIAWK LANDING-EC\PLANS\BLACKHAWME-LOTS 1-6.DWG