HomeMy WebLinkAbout090198_Routine_20240315ivision of Water Resources
= ,o
Facility Number ° �- O Division of Soil and Water Conservation
0. Other Agency
type of visit: ��om��pliance Inspection O Operation Review O Structure Evaluation O Technical Assistance
treason for Visit: (-Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: / Arrival Time: Departure Time: v County: Region:
Farm Name: i �d�G�Y 7� r1ICC/' L Owner Email:
Owner Name: ��,� c7✓YrtS oO Phone:
Mailing Address:
Physical Address:
Facility Contact: / 5 Title:
Onsite Representative:
Certified Operator:!713
Back-up Operator:
Phone:
Integrator: A&
Certification Number:
Certification Number:
Location of Farm: Latitude: Longitude:
Design Current,
Swine Capacity Pop.
Wean to Finish
Wean to Feeder
4)
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
d a
Other
Design Current
Wet,Poultry Capacity Pop.
Layer
Non -Layer
Design Current
Dry Poultry Capacity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Pouets
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Cattle
Design Current
Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes L_f 110 ❑ NA ❑ NE
[:]Yes ❑ No
[:]Yes [:]No
❑NA ❑NE
❑ NA ❑ NE
❑ Yes
[:]No
❑ NA
ONE
❑ Yes
2No
❑ NA
❑ NE
❑ Yes
�10
❑ NA
❑ NE
Page 1 of 3 511212020 Continued
Facility Number: - Date of Inspection: —
Waste Collection & Treatment
4. Is storage capacity (structural storm storage heavy less
<
plus plus rainfall) than adequate?
[-]Yes
L'J
❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier: Pi7wt S�
=�= �-
Spillway?:
Designed Freeboard (in): V
�3
Observed Freeboard (in): 3Z /t
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
[�No
❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
[ o
❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
Yes
10
❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
E2-No
❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
2-Ko
❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
�No
❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
�o
❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge
into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
I—Nw
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
2-N-o
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
D-156
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
®-Ko
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
EJ-No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
D-No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
[J Woo
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes
�o
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
No
gNo
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: jDate of inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes To
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes 0'N10,
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ErKo
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes En -'No
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
#):.Explain any YES answers and/or any
to
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
as
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ Yes
F__.4-Ko
❑ NA
❑ NE
❑ Yes
�No
❑ NA
❑ NE
❑ Yes
EZ"No
❑ NA
❑ NE
❑ Yes
/ No
❑ NA
❑ NE
❑ Yes
[D]No
❑ NA
❑ NE
❑ Yes
[3-No
❑ NA
❑ NE
❑ Yes
Ea<o
❑ NA
❑ NE
or any other comments., .
Phone: ��� -TO -OQ
Date:
511212020