Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6130203_Design Calculations_20240423
INFILTRATION BASIN Project# O'REILLY AUTO PARTS AREA INFILTRATION BASIN Date : 4/22/2024 Evaluation By: JEH DESIGN STORM: 1" OBJECTIVE: PROVIDE STAGE STORAGE FOR TREATMENT PORTION OF INFILTRATION BASIN ONLY. GIVEN: Location: Buffalo Lakes Area,Spout Springs, NC Watershed Area: 8.6 Accum.Storage Contour(ft-MSL): Area (sf) Inc.Vol (cu.ft) (cu.ft) Stage(ft) In Z In S Est.Stage(ft) 420.00 11,373 0,000 0,000 0.00 0.000 0.000 0.000 _ TREATMENT VOLUME 421.0 12,706 12,040 12,040 1.00 0.000 9.396 1.000 422.0 14,102 13,404 25,444 2.00 0.693 10.144 2.000 ONLY In intercept= 9.3959 Ks= 12,040 exponent= 1.0795 b= 1.08 R-sq= 1.000000 „,,,,, N CA Ro , HILLIARD ENGINEERING, PLLC •• _ SSio /-9% ':- 3417 Winterwind Circle,Sanford, NC 27330 (919)352-2834 SEAL i 035670 NC License No.: P-0836 ; 0 ........ \> ,,,- "",,;() E. Digitally signed by Jarrod E. Jarrod E. Hilliard,PE,CFM H i 11 i a rd, PE, CFM Date:2024.04.23 12:27:20 -04 00