Loading...
HomeMy WebLinkAbout20070208 Ver 2_More Info Letter_20071129~QF W AT ~9P Michael F. Easley, Governor `Q ~i William G. Ross Jr., Secretary Vj~.. North Carolina Department of Environment and Natural Resources ~ .~ p .~ Coleen H. Sullins, Director Division of Water Quality November 29, 2007 Wake County EXP# 07-0208v2 CERTIFIED MAIL: RETURN RECEIl'T REQUESTED Wake County Public School System Attn: Mr. Michael Burris 1551 Rock Quarry Rd Raleigh, NC 27610 Project Name: Heritage High School REQUEST FOR MORE INFORMATION-EXPRESS REVIEW PROGRAM Dear Mr. Burris: On November 27, 2007, the Division of Water Quality (DWQ) received your response to our request for additional information. The DWQ has determined that this information is incomplete. Please provide the additional information requested below in order to continue review of your project and to prevent denial of your application as required by 15A NCAC 2H .0506: Diffuse Flow Provisions: a. For the 1-inch storm, please provide calculations for the design volume above permanent pool level, surface area at the permanent pool level, orifice/weir sizing including drawdown rate and head above the permanent pool level, and velocities at the end of the outlet pipes and just after leaving the rip-rap apron prior to entering the filter strip for ALL BMPs. If it is determined that the exiting velocities are erosive, level spreaders or appropriate BMPs will be required in order to achieve diffuse flow across the filter strip. 2. Wet Detention Pond G a. Please revise flow and velocity calculations through Channels 50 and 51 with the appropriate section slopes. Our office estimated the channel slopes to be 1.8.4% and 13.3% respectively for sections 50 and SL As requested, we are granting you a 7-day extension (total) on the 30-day Express Review Clock since the original 30-day period ended on November 28, 2007. Please respond as promptly as possible, not later than five (5) days from the date of this letter by sending two (2) copies of this information. The Express Review Program is a process that requires all parties to participate in a timely manner. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please contact Joseph Gyamfi or Lia Myott at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. 401 Oversight I Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone; 919-733-17861 FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetlands N'o~et Carolina r/VQtIICR~~IJ An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper Heritage High School Page 2 of 2 November 29, 2007 Sincerely, , Cyndi Karoly, Supervisor 401 OversightlExpress Review Permitting Unit CBK/jg cc: Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office USACE Raleigh Field Office Central Files File copy Ms. Debbie Edwards, Soil & Environmental Consultants, P.A., 11010 Raven Ridge Rd., Raleigh, NC 27614