HomeMy WebLinkAbout20221493 Ver 1_2024-04-22 Credit Release Request Form_EMH Farm_DWR Project No.2022-1493v1_20240422
Clearwater Mitigation Solutions
604 Macon Place, Raleigh, NC 27609
919-624-6901
clearwatermitigation@gmail.com . www.clearwatermitigation.com
April 22, 2024
CREDIT RELEASE REQUEST FORM
To: Katie Merritt, NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Kevin Yates, Clearwater Mitigation Solutions (clearwatermitigation@gmail.com/919-624-6901)
Through: Clearwater Mitigation Solutions, LLC
We formally request a credit release for the EMH Farm Buffer Mitigation Bank Parcel
(DWR ID# 2022-1493v1) for completion of Task #3 per the approved credit release schedule, which is
included in the Attachments with this request. The following documents have been submitted to and
approved by DWR for Task # 3: EMH Farm As-Built and Baseline Monitoring Report including AMP,
and Performance Monitoring Bond. The Approved Project Credit Table, Approved Credit Release
Schedule are included with this Credit Release Request Form.
Credits requested for release are detailed below:
Credit Type % Release Credit Amount
(include Units)
Notes/Comments
Buffer Restoration 10%+1.5%=11.5% 75,072.139 SF 10% Release for Monitoring
Bond & As-Built Approval.
Add’l 1.5% carry over release for
full implementation of AMP per
Task 1/2 Credit Release Letter.
Buffer Preservation 10%+1.5%=11.5% 1,605.533 SF
Buffer Enhancement 10%+1.5%=11.5% 1,116.745 SF
Generated Nitrogen Nutrient
Offset
Delivered Nitrogen Nutrient
Offset (Jordan sites only)
Generated Nitrogen Nutrient
Offset
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
Signature:
Attachments (INCLUDED): 1) Approved Project Credit Table (include the most recent Asset Table
approved by DWR, whether it is the approved project Plan table or the As-Built table), 2) Approved
Credit Release Schedule Include the approved credit release schedule, whether it is the credit
release schedule from the MBI/UMBI or from the approved project Plan.
Table 4. EMH Farm, 2022‐1493v1, Project Credits
Project Area
N Credit Conversion Ratio (ft2/pound)
P Credit Conversion Ratio (ft2/pound)
Credit Type Location
Subject? (enter
NO if
ephemeral or
ditch 1)
Feature Type Mitigation Activity Min‐Max Buffer
Width (ft)Feature Name Total Area (ft2)
Total (Creditable)
Area of Buffer
Mitigation (ft2)
Initial Credit
Ratio (x:1)% Full Credit Final Credit
Ratio (x:1)
Convertible to
Riparian
Buffer?
Riparian Buffer
Credits
Convertible to
Nutrient Offset?
Delivered
Nutrient
Offset: N (lbs)
Delivered
Nutrient
Offset: P (lbs)
Buffer Rural Yes I / P Restoration 0‐100 UT1, UT2, UT3 473,753 473,753 1 100% 1.00000 Yes 473,753.000 N/A — —
Buffer Rural Yes I / P Restoration 101‐200 UT1, UT2, UT3 348,749 348,749 1 33% 3.03030 Yes 115,087.285 N/A — —
Buffer Rural No Ephemeral Restoration 0‐100 E1, E2 42,733 42,733 1 100% 1.00000 Yes 42,733.000 N/A — —
Buffer Rural No Ephemeral Restoration 101‐200 E1, E2 64,327 64,327 1 33% 3.03030 Yes 21,227.931 N/A — —
———
Buffer Rural Yes I / P Enhancement 0‐100 UT1 18,003 18,003 2 100% 2.00000 Yes 9,001.500 N/A — —
Buffer Rural Yes I / P Enhancement 101‐200 UT1 29,604 29,604 2 33% 6.06061 Yes 4,884.657 N/A — —
Buffer Rural Yes I / P Enhancement 20‐29 UT1 200 200 2 75% 2.66667 Yes 75.000 N/A — —
———
———
———
———
———
———
———
———
———
———
———
Totals (ft2):977,369 977,369 666,762.373 0.000 0.000
Total Buffer (ft2):977,369 977,369
Total Nutrient Offset (ft2):0 N/A
Total Ephemeral Area (ft2) for Credit:107,060 107,060
Total Eligible Ephemeral Area (ft2):278,218 9.6%Ephemeral Reaches as % TABM
Enter Preservation Credits Below Total Eligible for Preservation (ft2):325,790 10.4%Preservation as % TABM
Credit Type Location Subject? Feature Type Mitigation Activity Min‐Max Buffer
Width (ft)Feature Name Total Area (sf)
Total (Creditable)
Area for Buffer
Mitigation (ft2)
Initial Credit
Ratio (x:1)% Full Credit Final Credit
Ratio (x:1)
Riparian
Buffer Credits
Buffer Rural Yes I / P0‐100 UT1 77,678 77,678 10 100% 10.00000 7,767.800
Rural Yes I / P 101‐200 UT1 56,991 56,991 10 33% 30.30303 1,880.703
Rural Yes I / P20‐29 UT1 831 831 10 75% 13.33333 62.325
—
—
Preservation Area Subtotals (ft2):135,501 135,501
Square Feet Credits
929,562 652,801.216
47,807 13,961.157
135,501 9,710.828
1,112,870 676,473.201
Square Feet Credits
Nitrogen:0.000
Phosphorus:0.0000
TOTAL AREA OF BUFFER MITIGATION (TABM)
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals
Nutrient Offset:
Preservation:
Total Riparian Buffer:
Cape Fear ‐ Randleman
N/A
N/A
Restoration:
Enhancement:
Mitigation Totals
1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).
last updated 08/03/2020