Loading...
HomeMy WebLinkAboutSite Inspection_20181416_03_05_2024_401Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20181416 NCDOT - NC 24/27 Widening (R-2530B, B-4974, R-2527)Stanly NCDOT - NC 24/27 Widening (R-2530B, B-4974, R-2527) NC DOT Division 10 3/5/2024 Routine Site Inspection (DOT) Version: 2 Status:Issued Project Type:Road/Highway Widening Region:Mooresville Longitude:-80° 04' 37''+35° 18' 35'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Mary B Plummer 704-235-2193 Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20181416 3/5/2024 Canipe, Brett Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2