HomeMy WebLinkAboutSite Inspection_20181416_03_05_2024_401Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20181416
NCDOT - NC 24/27 Widening (R-2530B, B-4974,
R-2527)Stanly
NCDOT - NC 24/27 Widening (R-2530B, B-4974, R-2527)
NC DOT Division 10
3/5/2024
Routine
Site Inspection (DOT)
Version: 2 Status:Issued
Project Type:Road/Highway Widening
Region:Mooresville
Longitude:-80° 04' 37''+35° 18' 35''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Mary B Plummer 704-235-2193
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20181416
3/5/2024
Canipe, Brett
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2