Loading...
HomeMy WebLinkAboutNCC241263_Site Plan or Location Map_20240423 - CONSTRUCTION SCHEDULE - \ RA��RDAD P I.Obtain all a 1 approvals. and Sediment Control(E&SC)cemtit end a Certificate of Coverage \ ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY ye`',xx5 nary permits and pen apmoves NCGS 113A-54.iTS AVAILABLE FOR USE IT CAN BE COMPLETED BY HAND OR 55--\ (CDC)must be obtained before any land disturbing activities occur.A copy of me E&SC permit,the COC and a bard copy of me Aber ® plan must be keptmsiti,prekmbly in epermia box,and accessible during inspection. I -- dean131.14 COMPLETED AS AN EXCEL SPREADSHEET. 2.Install gravel mnswctirn mo-mcea first,men silt truces,reinforced silt fence ../ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED S' outlets and wattles. �l EROSION AND 3.Finish claming and grubbing any necessary areas on the lots asmryare started. �- C� SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A a.Begin lot grading and excavation activities :---- mtmatn •rZNCAC 048.0131 STATES THAT'...DOCUMENTATION SHALL BE ACCOMPLISHED BV . S.Begin Or continue wim house croswcEOn acEvifiea. -� INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE Fo6.Finish an rough grading and hoase comwedon.All areas not aismrlwa for]days needs w have rempomry or permanent \ \ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, y�'�o RANCH ROAD gronnacovcr mstaned. 4 \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, a�v.yo` y �_ ].nalall°rivewaya,wnika and panda. PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION h+ B.BcBin fnc gadmB of lot areas \ �' CDNTROL PLAN.'rq_ / 9.Fial Braasin8,mulching and smbiliang of lot In most cases Ihia will involve me instillation of sod on the lot The sill fence willAyw' 4101in plea until Me lot is sodded or grassing is stabilized and rakes hold. n > 10.The connector shall wnduc[self-inspections of the erasion and sedimentation control measures and complete the following Sycombined self-inspection form found an the DEMLRwebsite a2 ' �, hRPs://www.dcq.eta.Bov/abouUdlvlslons/evaBY-mincral-andland-resources/stonnwatWetoltnwala-progaMnpdae-wnswNlov-progam. \ l Twelve months of complete impe<hpn forms shall be kept on one and available for inspection at all hmea.lt is recommended a \ \ SODDING __ p�4 xOA0�' copy be kept inapermus box.Ref:G.S.113A-Sa.l through G.S.113A-3]Secnons lSA NCAC 04A.0101 through lSA \ 123 t NCAC 04E.OS,MGmeml Permit NCG OIOOIXI NPDES for Construction Activities. SITE IleSelf-inapectiova for erosion mdsedimmtitivn control measures are to be peRomredaz least once every seven calendar Jaya and \ �� N. �yussou is As-moose. within 24 hours of every rain event of greater than I inch.Any needed repairs shall be made immediately to maintain measures as TURNeIKE ROAp 4 designed.All ESC measures shall be maintained as specified m the construction details on this plan.A min gauge shall be installed lt et me project site far monitoring. \`.. \ 1Iy Mil SR r20T 4,- ' ,J g� 1■■ 12 Inspection mJ foal ac<epmnce Inters.When the project is complete,the permittece shall wnm<t DEMLR to close out the E&SC \ SP..AND Cro M����I�I.f��i�' \ nnx rak ruckT ante THE . m Plan.After DFMLR infomis me vetmittee pfine project close L'einspeclion report,the Perm-uee shell visit erba me mtied eta Paces. ft\ 3 N`SR\ b m 3 I .-\ 'deq.ve govMCG01"tO sobmlt av elerttonic N,nlceo[Imnly' (NI}IJ.A 5120 annual gmerel pennR fee will be charged 14 Pf11! 41,,.1' ...!.1.........!,..5,.„1.1,.,./..,...„1,„.,...x.:C.X2flfl:',.:,,....,..... iii _ _ we , 1 wnaTaesot TA.ro aoo.Asres. tL m t info y ,)p�N 18 I III ) NrsAPPEARANCE OF GOOD SOD g 5- ) \401 VICINITY MAP N. N. 19 I 36 I/ \ / / / ATM<g n N.T.S. \ - how. 4 20 /'� DATE: PAGE: \ N.\ `�� / _ meranam. MIN. .I FENCE \ 43 42/ � 40 39 3 � / + T' 11111111 11111111 11111111 1. ' \ 21 eSNSTRur • otPlan to ap n I o an J _MI• H" CONST'U• 17 H" I / DATE: PAGE: \ v '/�� -- -_ LIMIT I •�(DO ONSTRUCTION „pet' TOP OFs - \ \ NI --- LEI I LIMITZS MusT aEA ABOVEHEDnONEHE TOP OF T 22 audi THEW 4. Q .a Lane / REEL FENCE POST - 4• f--- , - _ - r'% , e % %I HARDWARE CWIRE LOTH FRONT VIEW (-- •._? (\\ I -- ° I 1 / 11 ti� = 1 I I ,P , I I ' e ' %i FILTER DF.a FENCE \au 23AND HARDWARE /4,g� 50 I III I R Hou R ll ou JL �Hous I I �G Liousf_15. iAV 40USEw NEDGTOrvE M aTRrvTRENaR iI I 54 MAIL, a �. tJ �R `-R0 �� Y -aoJ, JSt APART MINIM I INTOON GROUND NOi ES: gra \ a. - / pY AY ROADWAY L pYAY ,.Hardware cloth and gravel shouts overlay the silt fence at least 12 \ \ / 24 I t/ \ AREA " AlpYLEOGE of Cade I �uRaIrvLET Notes: a FILTERFAeRIc fO1.If needed,Tree Protection fencingshould be installed alongthe buffer zone,wetland 2.Stone outlets should be placed on low elevation areas of silt fence O \ 308 47 -- \ /- / and based on field conditions. �OI \/ I tt a1 n CONSTRUCTION --- \ -�� // boundary and/or around protected trees,providing a radius of at least 1.25 feet for each `\\ MAINTENANCE o3O ;i:_- __-. \ LEGEND inch of trunk diameter. BURY WIRE FENCE AND rty s•of UPPER EDGE OF 1.Per NCG-01,inspect outlet at lest once a week and after each l inch or 00 \ �- S5 __ 2.Install Silt Fence on the low elevation sides of each lot Install Silt Fence outlets shown on HARDWARE CLOTH FILTER FABRIC IN TRENCH greater rainfall event.Complete any required repairs immediately. I 1l 25 /..- ....N;T, / / / �- ThOW ddjtef necesplacementt low point\ builders,d. I SILT FENCE OLnLET s. OM 3.Install required Silt Fence within 10 feet Of property line to ensure there is no conflict with \NC-Envir entgl.laeg 5.Replace stone as needed to facilitate de-watering. 1 46 CONSTRUCTION ENTRANCE septic system.It is the responsibility of the builder to ensure the Installation Of sediment N) _ CURB INLET control measures does not impact the septic system and repair area(s). _„ SILT FENCE OUTLET 1 26 V 45 5� '� \ 5 nootheOrlelternativeexistsolfths sietpl a ll is to be Ins ailed per lot.u 3 4.At le stone Construction Enlra impact the \ for managing building material waste shall be at / y ets or dreinage ditches unless it can be shown that rationcannot be achievetl,these areas must be \ 27 / iI / / i ' o ....-/ / / contalnetl behind Silt ence. DATE: PAGE: 6.Inlets downstream of disturbances should be protected,streets should be swept when sediment from the construction activity is present. Silt sock/watue sit sock/wa \ 7 ( / \ -- .-----1 / / ..\NC-Environmenlal.jpeq ].Details for Gilt Fence,SO Fence Outlets,Construction Entrances and other measures are FLotw.cw�� .IaI1I*e Row M1 1. a 1 .r{Lyy / provided on atltlkional sheets.Erosion and sediment control details are not drawn to scale. �N• 2.11#11W n.0I•I I 1 \ 44 / �Oa+' / EccErTivE D^TE a+�s2/220 TYPICAL LOT LAYOUT WITH CURB AND GUTTER n I. II:II. Iwo 26 i e/ _�12 M'n'I 2 2' 2M ' �- 9 Stakes Stakes - attle(e)should bensteed parallel N I \2 x 2 to the.sired length.ch mat logs do not deform. / \ ...-1 DATE: PAGE and a minimum SECTION SECTION 10 feet beyonflat areas should he kwated d the.e edge mid., \�/-he 7���� �� ( �� land disturbance,.e.s of Me silt 2 e Mo•. prevent runoff wwatue(a from going a door can ortne \ 4. Oak or..durable hardwood stakes with a 2 29 / \ v I 'f° kHI u k GROUND STABILIZATION • SITE AREA STABILIZATION I / / \ Oda / • Trends-n inch EXCEPTIONS / Q' •• o 1/2 heght g grppne a Mn s f DESCRIPTION TIME FRAME g r \ s, / 1•_1 1��_� o•ne, ,, uNrRENurD INSTALLATION ) PERIMETER DIKES, 7 DAYS NONE / O ,,..= awe»••aw.vv=v�-�aw»a...vrw.,.��v.m.,�. sooldwattle to hold t aSWALES,DITCHES / \ \ \ \ Q •1•••••• '°'+nr ISOMETRIC VIEW place in MAINTENANCE during more... &SLOPES / 1.0 11 1 1 11 .0 k-.t Xtio- 1. pan weekly and after HIGH QUALITY 7 DAYS NONE I ( / \ \ /ate 1 1 1 1.1 1 1 1_1 1 1 1 wen,inch or greeter rainfall.Remove *5455,5 COMPOST sou xnu Flow PARR WATER ZONES I \ 1:` .. _ 1•1 1 1 0I,0I 1 1 rnrance wabsoeka mla<tae g wm•t.r ,,2mi (ioo"�,r,)AT)lead gym) a^]eh 2. rule mass do needed to allow for ado.... (HOW) ✓ / I Mul.or Compost , •• s Mn 4 1 1 .04 I 1 w Ta Be whop * SLOPES STEEPER 7 DAYS IF SLOPES ARE \ \ \ \ y` e'r;i. shenR Way �wIt s / ytnm(g ct�TPm)(roaPm) tF000 tF s THAN 3:1 10'OR LESS IN / K \ / .- 1r4.4, .d'. art f 1 c ea ) ( ) LENGTH AND ARE \ mixer `D NOT STEEPER - s"Tr q"Rm< '(?i" �m/ (y 7d," V." s. ho been manaoamaee°etne THAN 2:1, 14 *cm- I Iromemo //m) wcww vm/m) im/rm 4 mead romp DAYS ARE I / Construction M t nance, SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION ALLOWED j/ I / \ dearmee ran Bandexkdreadallvegetalpetrod,dodoherabfeconahe Per cG-D,nape aueaat tea week and after each,rchon L_- SLOPES 3:1 OR 14 DAYS 7 DAYS FORO I material and properly grade it. greater rainfall,make any secured repairs Immediately. FLATTER SLOPES GREATER 2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition m prevent min or sediment ooth it. from leaving the construction site.This may require periodic THAN 50H IN C \ I \ 3.Provide dreinage to carry water to a sediment trap or other sukable outlet. to dressing with 2 inch stone. LENGTHIlk,. ' 1 \ 4.Use geotea1ile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled.washed or ALL OTHER AREAS 14 DAYS NONE(E%CEPT �Y� • 6 I subject to seepage or high water table. tracked onto public roadways. WITH SLOPES FOR PERIMETERS N YJ DATE:, P lYvp Max E.�aatrs,tl,KKKth fahric wM wire wire =FmP Filter Fabric en„Ace FLATTER THAN 4:1 AND HOW ZONES) � S CONSTRUCTION ENTRANCE/EXIT L mt� a Fence -µfire Bnokfll V *s'e'S 1 steel Post tnorougMyocl p pa I1 _ / \ Plgat<ar S, tTGeneral Erosion Control Notes PAGE 1 of 2 tare tese _fin B�In 1.Only the are s shown shall be disturbed /C-1 I 4h � 2. All disturbed a Vershall be grassed a d y hed as sooneOas possible and maintained �/ TOTAL DISTURBED ACREAGE: 0.82 ACRES f X titpemanent a0 s established. / LOT EROSION CONTROL PLAN 1Xi( ii �v�s�ete`aro a,J / -Z LOTS 3, 37, 40 & 47 Construc0 • Filter Fabric / i. re�hnraaar� haymhalkfiharrea CROSS _ l Eonrca.aaaamoc harder roedaanothe ed fMeL bavemegmnnd.whenjmcea _ GATES FARM ca,awa menlre�rreedfia chiseler sufficient nnuaue mu m failure Iengmaao-fnµ LaMar.avoid Inn.when idiom are a snpp�emodow=nm;fi°filter< M1reme,Fbt=nNaeureltoReua ups..Side ; Pe..next post. MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION side of fence post Wirew plasm<zlpsseac w nave a the wire so pona"renale strength.dio on a p Mal coon olara�erreInK Mek ansRow a reeps,raInmedulely. General-All measures will be inspected and corrections made after runoff producing rainfalls or at least onceper week minimum.The builder will insure that the construction activities on an particular lot do not adverse) affect anyof the installed erosion control measures. If lot construction FOR wireho=s used....Pe.a maximum or...Part.Supports should he aiva P P 9 anyY securely coo ma ground a Pedmnimum of24 " 'tiara° p° dictates,measures will be relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual. Sodding,seeding and mulching will be 6.es.strengt nter..iser.,pos,so ingdown.re...wlremeshsupport...Securelrre maintained to insure proper ground stabilizing cover. A&G RESIDENTIAL, LLC ea..M1e nab directly posts wn: plastic p sshonm have a minimum of pound tense Remove ffoorr°M aan lnalnd necessary pressure or the Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. I. Ira y ncaeseds end einches deep along the proposed lie of the posts end Be to avoid uncle... ' "Ce P"e Immediately remove all objectionable materials spilled,washed,or tracked onto public roadways. RAEFORD TOWNSHIP HOKE COUNTY 'E'p'lopefro the ere SIR Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed 8.Piece 12 inc.>of fabric along the bottom rule filter fabric andrn pact Thorough< pa m of Me bark,.Is dranag0srreaanes be;mwoo v�a'bpzed. �no��o0 of properly to insure that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. SCALE:err=�0�' MARCH 2024 D.fical to onal attach filter pe.fah.renca. era Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could GRAPHIC SCALE 10. ting tr.s. inhibit adequate growth and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. ma o 50 100 200 400 Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any ENGINEERS ANC-Envir omen tgl.fcog bare areas should be repaired,and reseeded as soon aspossible.If the time of year does not permit the establishment of apermanent ass,then a temporary e al p y p fir p ry grassing should be used until the growingseason permitse e the use of a permanent ass. SILT FENCE Wattles-Wattles shall be inspected after significant rainfall events.Rills orgullies u to a of the wattle and anyundercutting is to be repaired.Sediment deposits that impair the filtration capability the wattle shall be removed when the sediment reaches one-third of the wattles functional PLANNERS p get' ps p tin g paire p p pa ty of , ( IN FEET ) freeboard height.Removed sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. SURVEYORS 1 inch = 100 ft. Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with ILLE MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEV ,N.C.28305 sediment.Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. MOORMAN, KIZER & REITZEL, INC. PHONE(910)484-5191 FAX(910)484-0388 LICENSE ILLE 6 LAST SAVED:3/14/2024 7:55 AM LAST PLOTTED:4/4/2024 4:07 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\A&G RESIDENTIAL LLC\23-2655-07 GATES FARM-EC\PLANS\GATESFARME-LOTS 3,37.40&47.DWG