Loading...
HomeMy WebLinkAboutNC0020354_Response to NOV-2023--LV-0860_Chatham Park Water Recovery Center_20231127November 27, 2023 North Carolina Department of Environmental Quality Division of Water Resources Attn: Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 RE: Notice of Violation & Intent to Assess Civil Penalty Tracking Number: NOV-2023-LV-0860 Chatham Park Recovery Center Chatham County Dear Ms. Manuel: This letter is in response to the NCDEQ-DWR letter of November 21, 2023 regarding the violation that was identified through the review of discharge monitoring reports (DMRs) for the September 2023 monitoring period. The letter identified one exceedance for this period and was identified as Daily Maximum Exceeded for BOD, 5-Day (20 Deg. C) — Concentration (C0310). This exceedance can be attributed to the low flow and the inability to perform efficient treatment at the low flows experienced by the facility. The average flow for this period was 21,000 gallons per day which is less than 5 percent of permitted flow, which leads to treatment inefficiencies. Effluent sampling results for the day previous were < 2.0 mg/L and the day following 2.2 mg/L, with no operational changes or modifications to plant operations. With an increase in flow, the plant will be able to more efficiently provide adequate and efficient treatment. Thank you again for continuing to work with the Chatham Park Water Recovery Center. We look forward to working with NCDEQ-DWR in a very positive and proactive manner as we continue to improve the facility's environmental stewardship. If upon receipt and review of this information you have any questions or would like to discuss this matter at greater length, please do not hesitate to contact me at your earliest convenience at (910) 409-8717 or Tim Smith at (919) 481-3000. Sincerely, McKim & Creed a'4��7 0, Ileav ;14 James W. Holland, PE Process Group Leader cc: Tim Smith File