HomeMy WebLinkAboutNCC241246_ESC Approval Submitted_20240422 � oE�"�ISTATF
� MAY 20.Iijs /�iO
14#1114
, dit."-
FSnR�i2. I»U *�
- QUAM VID*-1-
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
04-19-2024
GeoSurfaces Southeast, Inc
150 River Park Rd
Mooresville, NC 28117
RE: Project Name: East Surry High School Turf Field Project
Acres Approved: 2.4
Application ID: PA-004395
Permit Number: SURRY-2024-0112
Address:801 W. Main St.
City: Pilot Mountain
County:Surry
River Basin:Yadkin-Pee Dee
Stream Classification: HQW: High Quality Waters;WS-II:Water Supply II; CA:Critical Area
Plan Type: New Plan
Dear GeoSurfaces Southeast, Inc,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval.The Certificate of Approval must be posted at the job
site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit.After the form is reviewed and found to be complete, you will receive a link
with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the
COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOlform
may be accessed atdeq.nc.gov/NCG01. Please direct questions about theeNOlform totheStormwater
Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the
new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. This permit allows for a land-disturbance, as called
for on the application and plan, not to exceed the approved acres. Exceeding the acreage can be a
violation of this permit and may require a revised plan and additional application fee. In addition, it
would be helpful if you notify this office of the proposed starting date for this project.
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage
application.
2.Please notify this office prior to your pre-construction conference for this project by calling (336) 776-
9800 and asking to speak with the Land Quality inspector for your county. Permission must be obtained
and granted from NC DEQ DEMLR prior to the removal of any ESC measures.All additional permits should
be obtained, as necessary, prior to beginning construction. [GS 113A-51, 15A NCAC 48 .0120]
3.Any off-site borrow and waste required for this project must come from a site with an approved erosion
control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid
Waste Management. Trash/debris from demolition activities or generated by any activities on site must
be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid
Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
4.Additional measures may be required -The applicant is responsible for the control of sediment on-site.
If the approved erosion and sedimentation control measures prove insufficient, the applicant must take
those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
5.The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to
yearly NCG01 fee payment due dates. Be advised the project requires a closure inspection report by
DEMLR prior to filing the Notice of Termination (NOT) to terminate NCG01 coverage. The closure
inspection should not be requested until after the site has achieved full vegetative stabilization and
measures have been removed. The removal of temporary ESC measures, including basins, requires prior
approval. Often, a full growing season is necessary between initial seeding/mulching and removal of
measures. Please plan your construction accordingly to avoid contacting our office prematurely for a
closure inspection. Also be advised you may be asked for representative site pictures prior to a closure
inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles, PE - Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Attachments: Certificate of Approval
FRO Application Report
�� North Carolina Department of Environmental Quality I Division of Energy,
Mineral and Land Resources
Winston Salem Regional Office 1450 West Hanes Mill Road, Suite 300
_. Winston Salem NC, 27105
pdadindt aEnvolnisental W4 336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.
CERTIFICATE OF PLAN APPROVAL
,,,;.STATE
Y
%i,. MpYID ` 11
.177s YO1
/147
i J 'S4
110' o;
> h• ;
III,11 tG Q�,�,A2n iz 1r� 444
``, '";QUAM VW
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b).
East Surry High School Turf Field Project
801 W. Main St. Pilot Mountain, NC 27041
4/19/2024 SURRY-2024-0112
Date of Plan Approval DEQ Project Identifier
Certificate of Coverage Number: