Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG500124_complete file-historical_20120803
eEW NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Mr. Allen Stowe, Jr. Duke Energy Corporation 526 South Church Street / EC 13K Charlotte, NC 28202 Dear Permittee: Charles Wakild, P.E. Dee Freeman Director Secretary August 3, 2012 Subject: Renewal of coverage / General Permit NCG500000 Bear Creek Hydroelectric Station Certificate of Coverage NCG500124 Jackson County The Division is renewing Certificate of Coverage (CoC) NCG500124 to discharge under NPDES General Permit NCG500000. This CoC is issued pursuant to the requirements of North Carolina General Statue 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated October 15, 2007 [or as subsequently amended]. If any parts, measurement frequencies or sampling requirements contained in this General Permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, the certificate of coverage shall be final and binding. Please take notice that this Certificate of Coverage is not transferable except after notice to the Division. The Division may require modification or revocation and reissuance of the certificate of coverage. Contact the Asheville Regional Office prior to any sale or transfer of the permitted facility. Rezional Office staff will assist you in documenting the transfer of this CoC. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning the requirements of the General Permit, please contact John Hennessy [919 807-6377 or john.hennessy@ncdenr.gov]. Sincerely, Original signed by John Hennessy for Charles Wakild, P.E. cc: Asheville Regional Office / Surface Water Protection NPDES file 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 512 North Salisbury Street, Raleigh, North Carolina 27604 Phone: 919 807-6300 / FAX 919 807-6489 / Internet: www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper NolthCarohna Naturally STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NCG500000 CERTIFICATE OF COVERAGE NCG500124 TO DISCHARGE NON -CONTACT COOLING WATER, COOLING TOWER AND BOILER BLOWDOWN, CONDENSATE AND SIMILAR WASTEWATERS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Duke Energy Corporation is hereby authorized to discharge Hydroelectric Dam Sumps & Non -contact Cooling Water from a facility located at Bear Creek Hydroelectric Station NC Hwy 281 Tuckasegee Jackson County to receiving waters designated as the Tuckasegee River in subbasin 04-04-02 of the Little Tennessee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This Certificate of Coverage shall become effective August 3, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 3, 2012 Ori inal signed by John Hennessy for Charles Wakild, Director Division of Water Quality By Authority of the Environmental Management Commission 5-wa� F.AWA NCDENR lk+trn Guiot.thA [.~rmrc n cw FHvnoKMeKr N+n Nonuiot P?u)3rFs Division of Water Quality / Water Quality Section National Pollutant Discharge Elimination System NCG500000 FOR AGENCY USE ONLY Date Received Year Month Da Certificate of Coverage Check d Amount Permit Assigned to NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NCG500000: Non -contact cooling water, boiler blowdown, cooling tower blowdown, condensate, and similar point source discharges (Please print or type) 1) Mailing address* of owner/operator: Company Name Duke Energy Carolinas, LLC Owner Name Allen Stowe - Water Management Street Address 526 South Church Street, Interoffice - EC13K City Charlotte State N.C. ZIP Code 28202 Telephone No. (704) 382-4309 Fax: (704) 382-1681 " Address to which all permit correspondence will be mailed 2) Location of facility producing discharge: Facility Name Bear Creek Hydroelectric Station Facility Contact Keith A. Moore Street Address 4015 Canada Road City Tuckasegee State NC ZIP Code 28783 County Jackson Telephone No. 828 293-5726 Fax: N/A 3) Physical location information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). From intersection of Hwy 441 South and Hwy 107 in Dillsboro, turn left onto Hwy 107/Haywood Rd. Go 14.5 miles to Hwy 281, turn left. Go approx 3 miles past Cedar Cliff Hydro. Continue 34 miles. Bear Creek is on the right. (A copy of a county map or USGS quad sheet with facility clearly located on the map is required to be submitted with this application) 4) This NPDES permit application applies to which of the following : ❑ New or Proposed ❑ Modification Please describe the modification: B Renewal Please specify existing permit number and original issue date: 5) Does this facility have any other NPDES permits? B No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: 6) What is the nature of the business applying for this permit? Electric Generation Page 1 of 4 04/05 NCG500000 N.0.1. 7) Description of Discharge: a) Is the discharge directly to the receiving water? B Yes ❑ No If no, submit a site map with the pathway to the potential receiving waters clearly marked. This includes tracing the pathway of the storm sewer to the discharge point, if the storm sewer is the only viable means of discharge. b) Number of discharge points (ditches, pipes, channels, etc. that convey wastewater from the property): 2 c) What type of wastewater is discharged? Indicate which discharge points, if more than one. 8 Non -contact cooling water Discharge point(s) M 001 ❑ Boiler Blowdown Discharge point(s) M ❑ Cooling Tower Blowdown Discharge point(s) M ❑ Condensate Discharge point(s) M B Other Discharge point(s) M 002 (Please describe "Other") Sump d) Volume of discharge per each discharge point (in GPD): #1: SW,880 (max Row) #2: 72,000 #3: #4 e) Please describe the type of process (i.e., compressor, A/C unit, chiller, boiler, etc.) the wastewater is being discharged from, per each separate discharge point (if applicable, use separate sheet): Hydroelectric generator 8) Please check the type of chemical added to the wastewater for treatment, per each separate discharge point (if applicable, use separate sheet): ❑ Biocides Name: Manuf.: ❑ Corrosion inhibitors Name: Manuf.: ❑ Chlorine Name: Manuf.: ❑ Algaecide Name: Manuf.: ❑ Other Name: Manuf.: B None 9) If any box in item (8) above, other than none, was checked, a completed Biocide 101 Form and manufacturers' information on the additive is required to be submitted with the application for the Division's review. 10) Is there any type of treatment being provided to the wastewater before discharge (i.e., retention ponds, settling ponds, etc.)? ❑ Yes B No If yes, please include design specifics (i.e., design volume, retention time, surface area, etc.) with submittal package. Existing treatment facilities should be described in detail. Design criteria and operational data (including calculations) should be provided to ensure that the facility can comply with the requirements of the General Permit. The treatment shall be sufficient to meet the limits set by the general permits. Note: Construction of any wastewater treatment facilities requires submission of three (3) sets of plans and specifications along with the application. Design of treatment facilities must comply with the requirements of 15A NCAC 2H .0138. If construction applies to this discharge, include the three sets of plans and specifications with this application. Page 2 of 4 04/05 NCG500000 N.O.I. 11) Discharge Frequency: a) The discharge is: B Continuous ❑ Intermittent ❑ Seasonalo If the discharge is intermittent, describe when the discharge will occur: ii) If seasonal check the month(s) the discharge occurs: ❑ Jan. ❑ Feb. ❑ Mar. ❑ Apr. ❑ May ❑ Jun. ❑ Jul. ❑ Aug. ❑ Sept. ❑ Oct. ❑ Nov. ❑ Dec. b) How many days per week is there a discharge? seven c) Please check the days discharge occurs: B Sat. B Sun. 8 Mon. B Tue. B Wed. B Thu. B Fri. 12) Pollutants: Please list any known pollutants that are present in the discharge, per each separate discharge point (if applicable, use separate sheet): 13) Receiving waters: a) What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility wastewater discharges end up in? If the site wastewater discharges to a separate storm sewer system (4S), name the operator of the 4S (e.g. City of Raleigh). Tuckasegee River - West Fork b) Stream Classification: WS-111,B,TR,oRW 14) Alternatives to Direct Discharge: Address the feasibility of implementing each of the following non -discharge alternatives a) Connection to a Municipal or Regional Sewer Collection System Not Available b) Subsurface disposal (including nitrification field, infiltration gallery, injection wells, etc.) Too much flow c) Spray irrigation Not justifiable, no significant thermal gradient or pollutant load The alternatives to discharge analysis should include boring logs and/or other information indicating that a subsurface system is neither feasible nor practical as well as written confirmation indicating that connection to a POTW is not an option. It should also include a present value of costs analysis as outlined in the Division's "Guidance For the Evaluation of Wastewater Disposal Alternatives". 15) Additional Application Requirements: For new or proposed discharges, the following information must be included in triplicate with this application or it will be returned as incomplete. a) 7.5 minute series USGS topographic map (or a photocopied portion thereof) with discharge location clearly indicated. b) Site map, if the discharge is not directly to a stream, the pathway to the receiving stream must be clearly indicated. This includes tracing the pathway of a storm sewer to its discharge point. c) If this application is being submitted by a consulting engineer (or engineering firm), include documentation from the applicant showing that the engineer (Or firm) submitting the application has been designated an authorized Representative of the applicant. d) Final plans for the treatment system (if applicable). The plans must be signed and sealed by a North Carolina registered Professional Engineer and stamped -!'Final Design -Not released for construction". Page 3 of 4 04/05 NCG500000 N.O.I. e) Final specifications for all major treatment components (if applicable). The specifications must be signed and sealed by a North Carolina registered Professional Engineer and shall include a narrative description of the treatment system to be constructed. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Carol S.Goolsby •-1 ■ • on 11A k Lz o /.9, (D to Signed) North Carolina General Statute 143-215.6 b (1) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan or other document filed or required to be maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, or who falsifies, tampers with or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, shall be guilty of a misdemeanor punishable by a fine not to exceed $25,000, or by imprisonment not to exceed six months, or by both. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $25,000 or imprisonment not more than 5 years, or both, for a similar offense.) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDENR Mail three (3) copies of the entire package to: NPDES Permits Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Final Checklist This application will be returned as incomplete unless all of the following items have been included: B Check for $100 made payable to NCDENR B 3 copies of county map or USGS quad sheet with location of facility clearly marked on map 8 3 copies of this completed application and all supporting documents O 3 sets of plans and specifications signed and sealed by a North Carolina P.E. 8 Thorough responses to items 1-7 on this application B Alternatives analysis including present value of costs for all alternatives Note The submission of this document does not guarantee the issuance of an NPDES permit Page 4 of 4 04/05 TOPOI map panted on 09/07/07 from 'North Carohna.tpo' and "Un6tled.Cpg' 83`06'00" W 83'05'00' W 83'04'00' W WG584 83'03'00" W Bear Creek Hydro StationIr v NPDES No.: NCG500124 I s Ouffall001 y Sampling Waypoint: I N: 35° 14' 30" ` W: 830 04' 22" oJb � / 1]i I• � •�lnit / �2 I c.m, crn cnrf MtnI 1 /� �• r .� r F z 'ce Mtn q KRIS iPJ 1 2 I 2 6. J/� L eal '/����. i m �m Mtn Mtn ggg � c m \ 0 i m `F Y� BBKnoe . I - A"ti. Bear 1 06 83'06*00' W 83'05'00' W 83-04'00' W WG584 83-03'00" W W \Lp mutl.mh iOPo'[e_001 \nuvW G:eQapls (naa-m �mirtortmFs:am ica.-. Duke c. Energy:, Nil, fceY3/ CERTIFIED MAIL — RETURN RECEIPT REQUESTED January 29, 2008 Mr. David Matthews II North Carolina Department of Environmental Health and Natural Resources Division of Water Quality Point Source Branch 1617 Mail Service Center Raleigh, NC 27669-1617 n��1a y BARRY E. PULSKAMP Senior Vice President Regulated Fleet Operations Duke Energy Corporation 139 East Fourth Street EM402 Cincinnati, OH 45202 513 287 3485 barry.pulskamp@duke-energy.com i =�L6 FEB — 5 2008 ' s �'llr - WhTF.R QUALIT`' Re: Delegation of Authority - Signatures on Reports and Requested Information Duke Energy NPDES Permitted Stations North Carolina Hydroelectric Facilities Dear Mr. Matthews: Part II of B.6.b of the NPDES permits and Federal Regulation 40 CFR 122.22 specify that all reports required by NPDES permits and other information requested by the permit issuing authority shall be signed by a responsible corporate officer or a manager of the facility who is authorized to make management decisions governing the operation of the facility. I hereby authorize the Manager or General Manager, Hydro Fleet (currently Carol S. Goolsby), and her successors, the authority to sign all reports and requested information related to the permits or permit applications for the North Carolina hydroelectric facilities specified below: NGG soya �v".Soo7? y r✓C'ySgvl'y C45°Rf ,ycG�wi39 N "2067/ao lyeOaQb Bear Cree �n�dgewater, Brysonl Ce"gar cliff, Cowans Ford, Lookout Shoals, Mission, Mountain 1191and, Nantahala, Oxford, Rhoghiss, Tennessee Creek, Thorpe, Tuckasegee, Tuxedo-v 4 r?C&soo/3'6 � NCTila*� NC4s�/a3 `y NCGSCb//� vC G S00 If there are questions or additional information is needed, please contact Allen Stowe at (704) 3824309, Sincerely, /Www� Barry E. Pulskamp Senior Vice President Regulated Fleet Operations www.duke-energy.com e�� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor July 23, 2007 Jimmie Allen Stowe, Jr. Duke Energy Corporation 526 South Church Street / EC 13K Charlotte, NC 28202 William G. Ross, Jr., Secretary Colleen H. Sullins, Director Subject: Renewal of coverage / General Permit NCG500000 Bear Creek Hydroelectric Station Certificate of Coverage NCG500124 Jackson County Dear Permittee: In accordance with your renewal application [received on January 31, 2007], the Division is renewing Certificate of Coverage (CoC) NCG500124 to discharge under NCG500000. This CoC is issued pursuant to the requirements of North Carolina General Statue 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated May 9, 1994 [or as subsequently amended]. If any parts, measurement frequencies or sampling requirements contained in this General Permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, the certificate of coverage shall be final and binding. Please take notice that this Certificate of Coverage is not transferable except after notice to the Division. The Division may require modification or revocation and reissuance of the certificate of coverage. Contact the Asheville Regional Office nrior to any sale or transfer of the permitted facility. Regional Office staff will assist you in documenting the transfer of this CoC. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning the requirements of the General Permit, please contact Jim McKay [919 733-5083, extension 595 or james.mckav@ncmail.netl. Sincerely, for Coleen H. Sullins cc: Central Files Asheville Regional Office / Surface Water Protection NPDES file 1617 Mail Service Center, Raleigh, North Carolina 27699.1617 One 512 North Salisbury Street, Raleigh, North Carolina 27604 NorthCarohna Phone: 919 733.5083 / FAX 919 733-0719 / ]ntemet: www.ncwaterquality.org Naturally ����N� l//� An Equal Opportunity/Affirmative Action Employer -50%Recycled/10%Post Consumer Paper f�/�/ L STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NCG500000 CERTIFICATE OF COVERAGE NCG500124 TO DISCHARGE NON -CONTACT COOLING WATER, COOLING TOWER AND BOILER BLOWDOWN, CONDENSATE AND SIMILAR WASTEWATERS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Duke Energy Corporation is hereby authorized to discharge from a facility located at Bear Creek Hydroelectric Station NC Hwy 281 Tuckasegee Jackson County to receiving waters designated as the Tuckasegee River in subbasin 40402 of the Little Tennessee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This certificate of coverage shall become effective August 1, 2007. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 23, 2007. for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission 1t •:'411 r NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director NOTICE OF RENEWAL INTENT Application for renewal of existing coverage under General Permit NCG500000 Existing Certificate of Coverage (CoC): NCG500124 (Please print or type) 1) Mailing address* of facility owner/operator: Company Name Duke Energy Carolinas, LLC Owner Name Allen Stowe, Scientist - Water Management Street Address 526 South Church Street, EC 13K City Charlotte StateNC ZIP Code 28202 Telephone Number(704) 382-4309 Fax: (704) 382-9840 Email address jastowe(@,duke-eneM.com * Address to which all permit correspondence should be mailed 2) Location of facility producing discharge: Facility Name Bear Creek Hydroelectric Station Facility Contact Keith A. Moore Street Address NC Highway 281 City Tuckasegee StateNC ZIP Code 28783 County Jackson Telephone Number(828) 293-5726 Fax: N A Email address kamoore(@,duke-ener&.com 3) Description of Discharge: a) Is the discharge directly to the receiving stream? ® Yes O No (If no, submit a site map with the pathway to the potential receiving waters clearly marked. This includes tracing the pathway of the storm sewer to the discharge point, if the storm sewer is the only viable means of discharge.) b) Number of discharge outfalls (ditches, pipes, channels, etc. that convey wastewater from the property): Two c) What type of wastewater is discharged? Indicate which discharge points, if more than one. ® Non -contact cooling water Outfall(s) #: 001 p Boiler Blowdown Outfall (s) #: Page 1 of 3 NCG500000 renewal application ❑ Cooling Tower Blowdown Outfall (s) #: O Condensate Outfall (s) #: ® Other Outfall (s) #: 002 (Please describe "Other") Sump d) Volume of discharge per each discharge point (in GPD): #001: 866,880 (max. flow) #002: 72,000 #003: #004 4) Please check the type of chemical [s] added to the wastewater for treatment, per each separate discharge point (if applicable, use separate sheet): ❑ Chlorine O Biocides ❑ Corrosion inhibitors ❑ Algaecide O Other ® None 5) If any box in item (4) above [other than None] was checked, a completed Biocide 101 Form and manufacturers' information on the additive must be submitted to the following address for approval: NC DENR / DWQ / Environmental Sciences Section Aquatic Toxicology Unit 1621 Mail Service Center Raleigh, NC 27699-1621 6) Is there any type of treatment being provided to the wastewater before discharge (i.e., retention ponds, settling ponds, etc.)? ❑ Yes ® No (If yes, please include design specifics (i.e., design volume, retention time, surface area, etc.) with submittal package. Existing treatment facilities should be described in detail. ) 7) Discharge Frequency: a) The discharge is: ® Continuous OIntermittent ❑ Seasonal* i) If the discharge is intermittent, describe when the discharge will occur: ii) *Check the month(s) the discharge occurs: O Jan O Feb O Mar. ❑ Apr O May ❑ Jun ❑ Jul ❑ Aug. O Sept. O Oct. ❑ Nov. (i Dec. b) How many days per week is there a discharge? Seven c) Please check the days discharge occurs: ® Sat. ® Sun. ® Mon. ® Tue. ® Wed. ® Thu. ® Fri. 8) Receiving stream[s]: a) To what body or bodies of water (creek, stream, river, lake, etc.) does the facility discharge wastewater? If the site discharges wastewater to a separate storm sewer system (4S), name the operator of the 4S (e.g. City of Raleigh). Tuckaseeee River — West Fork b) Stream Classification: WS-III,B,TR,ORW Additional Application Requirements: Page 2 of 3 NCG500000 renewal application Additional Application Requirements: The following information must be included in triplicate [original + 2 copies] with this application or it will be returned as incomplete. ➢ Site map. If the discharge is not directly to a stream, the pathway to the receiving stream must be clearly indicated. This includes tracing the pathway of a storm sewer to its discharge point. ➢ Authorization for representatives. If this application will be submitted by a consulting engineer (or engineering firm), include documentation from the Permittee showing that the consultant submitting the application has been designated an Authorized Representative of the applicant. Certification I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Carol S. Goolsby Title: General Mang eg r, Hydro Fleet sO (Signature of North Carolina General Statute 143-215.6 b (i) provides that: 1129107 (Date Signed) Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan or other document filed or required to be maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, or who falsifies, tampers with or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, shall be guilty of a misdemeanor punishable by a fine not to exceed $25,000, or by imprisonment not to exceed six months, or by both. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $25,000 or imprisonment not more than 5 years, or both, for a similar offense.) ccemasasasasasasasasasa This Notice of Renewal Intent does NOT require a separate fee. The permitted facility already pays an annual fee for coverage under NCG500000. asasacasasaeasaEasaEasa Mail the original and two copies of the entire package to: Mr. Charles H. Weaver NC DENR / DWQ / NPDES 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Page 3 of 3 kit UNITED STATES �5 TENNESSEE VALLEY AUTHORITY 435/ I SE F' 311 (Tuckasegee I75-SE) 3131 314 2130' 315 BM- L.1679Ab � /",��i�lta� ' rfel - r - -aft . , � ;�` ; �- f � • �• � ��'t.�..: ka N•C-050or2;q l - �° , charge Point 001� i)il x�^/�� �/)fir►1�1��1��11 S s , ��1)„ 1<<�(�;, �`=� O 0 PC X C + �45 ° _ .,• 0 / 0/11fillmr1f. State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Alan W. Klimek, P.E. Director July 26, 2002 THOMAS D SMITHERMAN BEAR CREEK HYDROELECTRIC PLANT 301 NP&L LOOP RD MAIL CODE EC11E FRANKLIN, NC 28734 1 �• NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Reissue - NPDES Wastewater Discharge Permit Bear Creek Hydroelectric Plant COC Number NCG500124 Jackson County Dear Pennittee: In response to your renewal application for continued coverage under general permit NCG500000, the Division of Water Quality (DWQ) is forwarding herewith the reissued wastewater general permit Certificate of Coverage (COC). This COC is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated May 9,1994 (or as subsquently amended). The following information is included with your permit package: * A copy of the Certificate of Coverage for your treatment facility * A copy of General Wastewater Discharge Permit NCG500000 * A copy of a Technical Bulletin for General Wastewater Discharge Permit NCG500000 Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 578 Sincerely, for Alan W. Klimek, P.E. cc: Central Files Stormwater & General Permits Unit Files Asheville Regional Office 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG500000 CERTIFICATE OF COVERAGE No. NCG500124 TO DISCHARGE NON -CONTACT COOLING WATER, COOLING TOWER AND BOILER BLOWDOWN, CONDENSATE AND SI IILAR WASTEWATERS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, DUKE ENERGY CORPORATION is hereby authorized to discharge HYDROELECTRIC TURBINE COOLING AND NON -CONTACT COOLING WATER / CONDENSATE water or similar wastewater from a facility located at BEAR CREEK HYDROELECTRIC PLANT NC HWY 281-5 MILES FROM N TUCKASEGEE JACKSON COUNTY to receiving waters designated as the Tuskasegee River, a class WS-III B Tr water, in the Little Tennessee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG500000 as attached. This certificate of coverage shall become effective August 1, 2002. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 26, 2002. for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Jonathan Howes, Secretary A. Preston Howard, Jr., P.E., Director Thomas D. Smitherman Nantahala Power & Light Company 301 NP&L Loop Road Franklin, NC 28734 Dear Permittee: e�� E)FEE HNFi July 24, 1997 Subject: Certificate of Coverage No. NCG500124 Renewal of General Permit Bear Creek Hydro Station Jackson County hi accordance with your application for renewal of the subject Certificate of Coverage, the Division is forwarding the enclosed General Permit. This renewal is valid until July 31, 2002. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated December 6,1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. The Certificate of Coverage for your facility is not transferable except after notice to the Division. Use the enclosed Permit Name/Ownership Change form to notify the Division if you sell or otherwise transfer ownership of the subject facility. The Division may require modification or revocation and reissuance of the Certificate of Coverage. If your facility ceases discharge of wastewater before the expiration date of this permit, contact the Regional Office listed below at (704) 251-6208. Once discharge from your facility has ceased, this permit may be rescinded. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality, the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact the NPDES Group at the address below Sincerely, `I _ /1 _4. Y A. Preston Howard, cc: Central Files 6 _ Asheville Regional Office NPDES File Facility Assessment Unit P.O. Box 29535, Raleigh, North Carolina 27626-0535 (919) 733-5083 FAX (919) 733-0719 p&e@dem.ehnr.state.nc.us An Equal Opportunity Affirmative Action Employer 50% recycled / 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG500000 CERTIFICATE OF COVERAGE NO. NCG500124 TO DISCHARGE NON -CONTACT COOLING WATER, COOLING TOWER AND BOILER BLOWDOWN, CONDENSATE, EXEMPT STORMWATER, COOLING WATERS ASSOCIATED WITH HYDROELECTRIC OPERATIONS, AND SIMILIAR WASTEWATERS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Nantahala Power & Light Company is hereby authorized to discharge cooling water and other waters associated with hydroelectric operations from a facility located at Bear Creek Hydro Station NC Highway 281-5 Miles From NC 107 Tuckasegee Jackson County to receiving waters designated as subbasin 40402 in the Little Tennessee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV of General Permit No. NCG500000 as attached. This certificate of coverage shall become effective August 1, 1997. This certificate of coverage shall remain in effect for the duration of the General Permit. Signed this day July 24, 1997. A. Preston Howard, Jr., P.E., Director Division of Water Quality By Authority of the Environmental Management Commission k+ Letter to N. E. TUCKER, JR. January 28,1997 NCG500124 INVOICE FOR RENEWAL OF NPDES PERMIT Check here if you do NOT wish to renew this permit. Please return this page along with a letter documenting your reasons for not requesting renewal to: Mr. Charles H. Weaver, Jr. Division of Water Quality/WQ Section NPDES Group Post Office Box 29535 Raleigh, North Carolina 27626-0535 © Check here if you wish to renew this permit. Please verify that the following information is documented accurately: Mailing Address N. E. TUCKER, JR. NANTAHALA P&L/BEAR CREEK HYDRO ROUTE 63 BOX 115 TUCKASEGEE,NC 28783 (704) 293-5137 Fax number: (704) 369-7616 e-mail address: Facility Location N. E. TUCKER, JR. NANTAHALA P&L/BEAR CREEK HYDRO HIGHWAY 281 TUCKASEGEE , NC 28783 ❑ No revision required. ® Revision required. (Please specify below.) THOMAS D. SMITHERMAN NANTAHALA POWER & LIGHT COMPANY 301 NP&L LOOP RD. - FRANKLIN, NC 28734 (704) 369-4514 ❑ No revision required. Revision required. (Please specify below.) NP&L/BEAR CREEK HYDRO STATE HIGHWAY 281 APPRONTMATELY S MTTYR FRnm HIGHWAY 107 Please return this page with your letter requesting renewal, and $400 fee (payable to NCDEHNR) to: Mr. Charles H. Weaver, Jr. Division of Water Quality/WQ Section NPDES Group Post Office Box 29535 Raleigh, North Carolina 27626-0535 Signature of applicant or authorized representative % • D. 4'+« Date 2- 2.e-9'3 State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director September 10, 1993 N. E. Tucker, Jr. Route 63, Box 115 Tuckasegee, NC 28783 Q [DEHNFi Subject: General Permit No. NCG500000 Bear Creek Hydro Station COC NCG500124 Jackson County Dear Mr. Tucker. In accordance with your application for discharge permit received on June 24, 1993, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management. The Divsion of Environmental Management may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required If you have any questions concerning this permit, please contact Mr. Randy Kepler at telephone number 919/733-5083. pngiria %ed By coleen H. Sullins A. Preston Howard, Jr., P. E. cc: Fran McPherson Asheville Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT Wd I N al LKIM owe) A-D&M-4 WAOIW TO DISCHARGE NON -CONTACT COOLING WATER, COOLING TOWER AND BOILER BLOWDOWN, CONDENSATE AND SIMILIAR WASTEWATERS UNDER THE In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Nantahala Power and Light Company is hereby authorized to continue operation of a treatment system for the generation of non -contact cooling waters, boiler water blowdown or similar waste streams with the discharge of treated wastewater from a facility located at Bear Creek Hydro Station off of NC Highway 281 on Bear Creek Road Jackson County to receiving waters designated as the Tuckasegee River in the Little Tennessee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV of General Permit No. NCG500000 as attached. This certificate of coverage shall become effective September 10,1993 This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day September 10,1993 Original Signed By Coleen H. Sullins A. Preston Howard, Jr., P.E.,Director Division of Environmental Management By Authority of the Environmental Management Commission UNITED STATES �5 e. TENNESSEE VALLEY AUTHORITY l �6-NC G'6,✓t • 4354 r SE 5' 311 (Tuckasegee 175-SE) 3131 314 21301 315 am - IN ::::. ���.� �� Ctf�€=1 i�> :1� �� � i/•,•. ;�ti' i� o � '�• r r-" "�•, �i/ _ �•' /f r f �, j '�'.� /• � //i '1 _-�s-.•�• < +'�.��, MIII n` '..� �\ s �' �,,`�/ 3 t �v \��1 ��~� i5 r 'Y �� r i•:.r Q ri��\ L.._� ) .-•r � /� i'•!/� ` ;;i��. :_"' •.::'••c.. '�J • {..:•mkt: '��n� � ;'t+'� ;'�\ {.' . �� :6 fit Discharge Point 001 ��, Vim•- i ' � •� - '�� :� �,,,�1 iti,i + -� �� �:.~.:ti�� �• •//�•,'� j/•`rr' r f. -=t\ .'.-_-_'--' El 0 X O MWIVYIN SOC PRTORITY PROJECT: No X IF YES, SOC NUMBER TO: PEP14ITS AND ENGINEERING UNIT ., WATER QUALITY SECTION ATTENTION: Randy Kepler r`UJ DATE: July 21., 1993 TECH N"I� !_ �wtKiai .o NPDES STAFF REPORT AND RECOMMENDATION COUNTY Jackson PERMIT NUMBER NCGO500124 PART I - GENERAL INFORMATION 2. 3. 4. 5. VA o4-o4-oz_ TS�cnsr GCE�"`(l_ Facility and Address: Bear Creek Hydro Station Nantahala Power and Light Co. Route 63, Box 115 Tuckasegee, N. C. 28783 Date of Investigation: July 20, 1993 Report Prepared By: W. E. Anderson Persons Contacted and Telephone Number: Richard Conley 704-293-5137 Directions to Site: From the intersection of NC 107 and NC 281, travel approximately 5 miles on NC 281.. Turn right on the Bear Creek Lake road. Discharge Point(s), List for all discharge points: Latitude: 350 14' 30" Longitude: 830 04' 22" Attach a USGS map extract and indicate. treatment facility site and discharge point on map. U.S.G.S. Quad No. Big Ridge U.S.G.S. Quad Name 176-NE(G6NE) Site size and expansion area consistent with application? N/A Yes No If No, explain: 8. Topography (relationship to flood plain included): Steep, in the flood plain -this is a hydro power generator. Page I PLOTTED 9. Location of nearest dwelling: Gr-ater than 500 feet. 10. Receiving stream or affected surface waters. Tuckasegee River. a. Classification: WS--III&B-Trout. b. River Basin and Subbasin No.: i,ittle Tennessee 040402. C. Describe receiving stream features and pertinent downstream uses: There is one more small hydropower lake downstream from this one on the east fork of the Tuckaseigee River. PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1 2 a. Volume of wastewater to be permitted N/A MGD (Ultimate Design Capacity) b. What is the current permitted capacity of the Wastewater Treatment facility? N/A C. Actual treatment capacity of the current facility (current design capacity N/A d. Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two years: N/A e. Please provide a description of existing or substantially constructed wastewater treatment facilities: N/A f. Please provide a description of proposed wastewater treatment facilities: N/A g. Possible toxic impacts to surface waters: N/A h. Pretreatment Program (POTWs only): N/A in development approved should be required not needed Residuals handling and utilization/disposal scheme: N/A a. If residuals are being land applied, please specify DEM Permit Number Residuals Contractor Telephone Number b. Residuals stabilization: PSRP PFRP OTHER Page 2 c. Landfill: d. Other disposal/utilization scheme (Specify): 3. Treatment plant classification. (attach completed rating sheet): N/A 4. SIC Codes(s): yg1j Wastewater Code(s) of actual wastewater, not particular facilities i.e., non -contact cooling water discharge from a metal plating company would be 14, not 56. Primary 14 Secondary Main Treatment Unit Code: 000--0 PART III - OTHER PERTINENT INFORMATION 1. Is this facility being constructed with Construction Grant Funds or are any public monies involved. (municipals only)? N/A 2. Special monitoring or limitations (including toxicity) requests: None. 3. Important SOC, JOC, or Compliance Schedule dates: (Please indicate) N/A Date Submission of Plans and Specifications Begin Construction Complete Construction 4. Alternative Analysis Evaluation: Has the facility evaluated all of the non -discharge options available. Please provide regional perspective for each option evaluated. Spray Irrigation: N/A Connection to Regional Sewer System: N/A Subsurface: N/A Other disposal options: N/A 5. Other Special Items: None. Page 3 PART IV - EVALUATION AND RECOMMENDATIONS This is a discharge of cooling wat.er associated with a hydro power generator. The cooling is intri,iisi_c. to the turbine/generator combination and cannot be separsts-d from the flow through the turbine. Issuance of the Certificate of Coveraete is recommended. Signattire of Report Prep er ester. Qu lity Regional Supervisor -2 Dat Page 4 N ITF-1) STATI-1*-S C , 126-TF"NNI,SSFF 1:Y A- U"I'H0R1TY (I uckast gee I 75-SE) '13 314 2 '30' 315 BM 1-HT 1679 2806 Rpcky Hollow 2533 X\ ..Art. HA, \j ;�.!� �,��, � 0 - - d - `:: _ _�� � c�;��—%=-_-�-- _ ��.� ' � Boa . . ........... . . do olV, 101 9, 0 U4, X re, .... . ...... nioi Jul INS