Loading...
HomeMy WebLinkAbout[External] TIP East STA 3+00 PG - GS - 1 - PG GS - 1 (Response to Compliance Inspection)Baker, Caroline D From: Brodeur, George <George.Brodeur@haskell.com> Sent: Monday, January 15, 2024 8:16 AM To: Homewood, Sue; Thomas, Zachary T Cc: Jason.Steele@freese.com; Paul Hyler; Ken Bruce; Phillip Todd; Jonathan Theodore; Kelly, Brian; Gilroy, Matthew; Hamilton, Kameron; Brodeur, George Subject: [External] TIP East STA 3+00 PG - GS - 1 - PG GS - 1 Attachments: DSCN4486.JPG; DSCN4489.JPG; DSCN4488.JPG CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sue & Zachary, I tried sending these photos I took after the 2.5" rain event we had at the site On 01/09/2024, it came back undeliverable. The rain event washed the wattles out of place. We are prepared to do as instructed, restore approximately 40' of stream, install crane malts, remove the in -stream wattles completely, Install Filltrex parallel to the stream from the crane malts to the LOD's and monitor. We are waiting for the 404 mitigations to be finalized, or do we have permission to make the correction immediately? Please let me know. We accumulated 1.5" over the weekend I will inspect today. You will note the photos are date and time stamped. Thanks!