HomeMy WebLinkAboutNCC203406_NOT Closeout Documents_20240418 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105
(336) 776-9800
County: Guilford Project: Pleasant Garden Substation Fence River basin: Cape Fear
Person financially responsible:Duke Energy Corp-Michael D Robinson Project#: GUILF-2020-043
Address: PO Box 1006,Charlotte,NC 28201
1. Project Location: Baswell Rd,Greensboro
Pictures: No
2. Weather and soil conditions: 60's,Clear,Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: April 15,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Turney
Date of inspection: April 09,2024 Time arriving on site: 4:00 PM Time leaving site: 4:30 PM