Loading...
HomeMy WebLinkAboutSW5240103_Design Calculations_20240422 1 667 Thomas A. Pkw ., Rocky Mount, 27804 Phone: Betts 25GA IV( 2- y 446-3017R - Fax: 252-446-7715NC Firm License: C-0569 - www.mackgaypa.com Mack Gay Associates, P.A. Engineering . Surveying . Planning STORMWATER CALCULATIONS MANUAL Rocky Mount Memorial Park 4486 Dortches Blvd, Dortches, Nash County, North Carolina .,0,, GARoL,4",,,, z, •`'Es s/oj 9 , SEAS- r p3684B = _ October 21, 2023 0 .`, Prepared by: �. �°,, iRi,Jwo ° Phillip Joyner, Jr., PE TABLE OF CONTENTS SECTION 1 Stormwater Narrative SECTION 2 USGS Map, Soils Map, Surface Water Classification SECTION 3 Deed SECTION 4 Supplement EZ Cover Page, Drainage Areas Form, Wet Pond Form SECTIONS Wet Pond Calculations SECTION 6 Runoff Calculations SECTION 7 Pipe Network Calculations STORMWATER NARRATIVE STORMWATER MANUAL NARRATIVE The property currently has an existing cemetery. The purpose of this project is to expand the existing cemetery by extending the access drive, adding mausoleums, crypts, grave plots. The disturbed area for this project is 10.9 acres. This project requires stormwater runoff peak flow management and first flush treatment. Within the disturbed area The project will result in 1.09 acres of additional impervious for a total of 1.25 acres of impervious within the project area. and 0.13 acres of impervious area for the water quality pond permanent pool. The proposed grading will take place on soil types Norfolk loamy sand 2 to 6 percent slopes, and Norfolk-Wedowee complex 2 to 6 percent slopes. This project is located in the Tar-Pamlico River Basin and the receiving stream is Goose Branch number 28-70, Classification C;NSW This project will utilize a water quality pond that discharges to an existing roadside ditch. The water quality pond was designed according to the current NC BMP Manual. The water quality pond will treat the first 1.0"flush per NCDEQ requirements and will manage the peak flow. The pond will detain and route the post-development peak flows from the 1 year, 2 year, 10 year, and 100 year storms to less than the pre- development flows. See stormwater summary below: STORMWATER RUNOFF SUMMARY 1-yr Storm 2-yr Storm 10-yr Storm 100-yr Storm PRE 1.25 1.49 2.15 3.23 POST .023 .025 .466 2.381 all flow is in cfs USGS MAP, SOILS MAP, SURFACE WATER CLASSIFICATION 1 9 /. 93 Red Oak _ . c m 5 1 ''' / „V.‘,;- \```/// 111 t50 O vol - --, ,. . / i 1 zng G y I RD _ , / .‘) `l� -- g BASt,E80RD .a ti 92 = RED DA k CC sr rsr �.• v a5D D 2 0 Robinson Cem _.....,..jr o j / o 0111;1 ____---' :...o. ) - 0 95 �' 91 a 2 _._ —�Ellen Cem %�� �:1 �aF !/ENRQ 0 ' f/ r m, so % l l's4-51/1 P- . '.::::34/1 --1 / yFSd!Vpr F�J HARK/SpNTp+ 1RlyD \) �— / a\� t43 '::';'. : RICKS Dortches rr_ �` �.. . _I �. 89 - 95 f Brown Cem o - 0 } - / SUMMERLE•Aa 44 1' . -j50 / ,rQv •joo • 0 Rocky Mount n �6-- 2 o Memorial • Cem a S ; !i f, r I- Brake Cem f�-7 1� -�J I ) r/ 43' L �— es (SITE e<<p 36.0000' 41 42 43 44 -77.8750 - '''‘-•- k-.1 (, _0A - NaC ',- NoA ,,, .M.7,0* '' • ,,C.4'f, . Nob . . . . I t , tliy1 IL . ( ''"*,• ' . ••. NoB 1 NaC Ilk 4.4 iiii I I i , .., , - . ..... ..--' ' . -NUA • • ., ':': 1S11041111 GoA • . •••IS. - -' ' ' r NDE3 r r . silr'. #4•';‘'..,'• ` - . •• . -Z. .. '",r 1010"-""". 4.• .- ''•‘ ,_,I BoB ii. A , -..,:• , ' \V"ii •..,.,i. . .:".... NoB r •" No8 . titilLI , + + I a. ' ..•11111.. . NoB . - A NoB (C. . . IV' ' —-.. Ra 61121 -•'?'_;. , ...i.:--1. 22 -...,, •• -,, , . .I R, ' III ------\ N, 4. t''''" NoB 1 NoB * BoR f • it Nor: NoB virlitti,... .. ,. , ,r, _ . for .i. 4,‘• oB .41.,.., . valall. --'s•' ••NoB . -',....:•:. • -•...NOB NoB it NoB f 4, /I i NoB 047,• --Allir ...!' F .. , L. .. , r • , J tie " , NoA • • ro• a. .v. .. •,..- . AL I .1 . . • i • NoB). I' 4 •B do B ,,. .., ItGo, .'•)'. *4 ii. NoB . .1' .,. 4.... /./...i , 11110e.'., '''.."ir..t ' • ,''''• ' . ,-,, ?-' . ••••• ; . . '., *NoB , II , . ., - NoA,/. 14ar' • . . .• it. Allii NoB ' •.... 11 . ' NoB 4- • 4.4i. -111111-, . "110 ...",,:c-,:lir No . e . • '- • t-0 i ••V1V, - 8 ----gh,16.2. . . . , - .t._ NoB NaC NoB .4.-illi '/ fb NpE3 IP1111,-,, NaC • A. NoB .. i r..411L2, NoA . ' •".•iiPt:%.•_'•ii" 13- "— fek- . NoA • 8 . Iftiffi 41,4iip No c Np: 'IN `j-;:•: "f3 • P-u .is I , ,'' t• t ill 1 ( . , . Vp8 Olt , --- I ••••, e A . \ - • ^ ' i • r-r!k,--..th.: irmiteJitlielit''1*B -4111k.. .411 1111414"4-144. + N.Nk)1 ;"!•-•," 1 i iti NoB IS11 • -.... ''•-•'. : -,, N.•4,, 4.. '. o: IL4e— . - , .i. -;.. - • •=-,-- No13 , , ,:, !.'.:'.,k 1-•,,,1214.‘„i a a te II • . a ‘ ....., .. „:„„,,i No8 ge'..-_,. ii.--- *f.44,1".•.\-4 1 ! 10,1:,:-..-7 r‘ ''‘', •; f'-'Vr' 4 i.....9•a SITE N b; " -• ''. I,::4,--,..` NoB k.!2.1 •••• 12-, Illrid--- 40.. .., . '•3r.''.,:;• ' ' Iii .•••. • ".•/:, Ras A AL.16 , , `,...,.„. „..-......-4111cx GoA ..L.,i,:vo..1 WoR NoA li6,iii NC Surface Water NC Classification... Report an Issue • unr )( )( Detail• Legend ®a \ 01 E-1 © Surface Water Classifications: Stream 28-70 Index: Surface Water Classifications: v LB X Stream Goose Name: Branch Stream Index: 28-70 Stream Name: Goose Branch Description: From Description: From source to Tar River source to Classification: C;NSW Tar River Date of Class.: December 31,1989 Classification: C;NSW What does this Class.mean? View Date of December River Basin: Tar-Pamlico Class.: 31, 1989> Zoom to What does View this Class. mean? River Basin: Tar- Pamlico -77.842 35.999 D... r i L J 200 m 1,000 ft I State of North Carolina DOT,Esri,HERE,G... Powered by Esri DEED Page 1 of 3 ?'13 +iI f1I!1`` III! 4U IIP +i+ hill illi Iljj�� �f I I. Doc ID: C089849/0003 Tvoe: CRP Recorded: 03/02/2018 at 10:49:67 An Fee Amt: $1.904.00 Page 1 of 3 Revenue Tax: $1.878.00 Dash County North Carolina Anne J. Melvin Register of Deeds • This instrument prepared by: 11 � lK 2 V 14 PO! Igi V-7 /7ee V a licensed North Carolina attom kt Delinquent taxes,if any,to be paid by the closing attorney to the county Tax Collector upon disbursement of closing proceeds. NORTH CAROLINA SPECIAL WARRANTY DEED Prepared by and After Recording Return to: Parcel Number: Kim L.Bayless Revenue Stamps:$ 1,878.00 Poyner Spruill LLP Post Office Box 353 Rocky Mount,North Carolina 27804 Grantor states that the Property does not include the primary residence of Grantor. NORTH CAROLINA NASH COUNTY THIS SPECIAL WARRANTY DEED is made effective as of March 1,2016 by S.E.CEMETERIES OF NORTH CAROLINA, INC., a North Carolina corporation("Grantor") with a mailing address of 1929 Allen Parkway Houston,Texas 77019 to RMMP,LLC,a North Carolina limited liability company ("Grantee") with a mailing address of 1130 North Winstead Avenue, Rocky Mount, North Carolina 27804. WITNESSETH For and in consideration of$10.00 cash in hand paid by Grantee to Grantor,and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Grantor has and by these presents does grant, bargain, sell and convey unto Grantee in fee simple, all that certain lot or parcel of land situated in Nash County,North Carolina, which lot or parcel of land is more particularly described on Exhibit A attached hereto and incorporated herein by reference. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to Grantee in fee simple. 3 Book: 2814 Page: 773 Seq: 1 Page 2of3 And the Grantor covenants with the Grantee that Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend the title against the lawful claims of all persons claiming by,under or through Grantor, except that, with respect to such covenant and warranty, title is conveyed subject to the following exceptions: 1. Lien of 2016 Ad Valorem Taxes. 2. Title to that portion of land lying within the right-of-way of NC Highway 43 (Dortches Boulevard)and S.R. 1612(Brake Road). 3. Easements, setback lines and any other matters shown or noted on plat recorded in M�a Book 4. Pages 114, 162; Map Book 5, Page 14; Map Book 6 Pages 88, 1l7, 123, 124; Map Book 10, Pages 73, 130; Map Book 11,Pages 74,76 88, 253, 343; Map Book 13, Pages 26,312; Map Book 15,Page 102; Map Book 18,Page 123;Map Book 19,Pages J 09, 110;Map Book 23.Page 100 and Map Book 31,Page 339,Nash County Registry. 4. Easement(s) and/or right(s) of way to Progress Energy Carolinas, Inc. recorded in Book 2352.Page 651,Nash County Registry. The designation "Grantor", and "Grantee" as used herein shall include said named parties and their respective heirs,personal representatives, successors and assigns, and shall include the singular, plural, masculine,feminine or neuter as required by context. IN WITNESS WHEREOF, the Grantor has executed this instrument as of the day and year first above written. S.E.CEMETERIES OF NORTH CAROLINA,INC., a North Carolina corporation By: Print Name: .Briggs Title: Vice President STATE OF TEXAS COUNTY OF HARRIS I certify that the following person personally appeared before me this day,acknowledging to me that he voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated:Curtis G.Briggs Date:March 1,2016 Official Signature of Notary: ( () , Notary's Printed or Typed Name: Camille Vargo,Notary Public My Commission Expires: April 9,2016 (Official Seal) q nq` 4 CAMILLE VARGO ' Notary Public,State of Texas My Commission Expires " , April 09,2016 2 Book: 2814 Page: 773 Seq: 2 Page 3 of 3 • E?SIT A LEGAL DESCRIPTION That certain parcel known as "Rocky Mount Memorial Park", located in the Town of Dortches, Stony Creek Township,Nash County,North Carolina and being more particularly described as follows: BEGINNING at a point marked by an existing iron pipe set on the southern right of way line of North Carolina Highway 43 at the corner of the property known as"Rocky Mount Memorial Park"and,now or formerly, Lois Jones; thence along the line of, now or formerly, Lois Jones South 44° 02' 21" West 190.97 feet to a point marked by an existing iron pipe at a corner with,now or formerly,Lois Jones,and, now or formerly, the D. L. Melvin property; thence along the line of the Rocky Mount Memorial Park and,now or formerly,the D.L.Melvin property South 36°08' 11"West 400.91 feet to a point marked by an iron pipe set,and continuing South 00°03'23"West 430.44 feet to a point marked by an existing iron pipe,and thence continuing South 08°30'00"West 696.96 feet to a point marked by an existing iron pipe on the northern right of way line of Brake Road(S.R. 1612); thence along the northern right of way line of Brake Road the following courses and distances: South 67°05'23"East 404.28 feet to a point marked by an iron pipe set,thence continuing South 64°24'00"East 165.70 feet to a point marked by an existing iron pipe, thence continuing South 55° 34' 00" East 142.80 feet to a point marked by an existing iron pipe,and thence continuing South 47°56'41"East 355.04 feet to a point marked by an existing iron pipe at a corner of the Rocky Mount Memorial Park property with,now or formerly,Ernest B.Barlow;thence along the line of, now or formerly, Ernest B. Barlow to and along the line of, now or formerly, Myron Williams North 07° 18' 41" East 709.47 feet to a point marked by an existing iron pipe; and thence continuing along the line of,now or formerly,Myron Williams to and along the line of,now or formerly, Eugene Greene to and along the line of,now or formerly,Melvin Nicholson,to and along the line of,now or formerly,Florida Ricks,and to and along the line of,now or formerly,Larry Hines North 06°42' 54" East 837.47 feet to a point marked by an existing iron pipe on the southern right of way line of North Carolina Highway 43; thence along the southern right of way line of North Carolina Highway 43 North 46° 13'2T'West 857.00 feet to the point of beginning,the same containing 34.41 acres and being shown on the plat entitled"Map of Property of Rocky Mount Memorial Park,Dortches,N.C.Highway 43,Stony Creek Township,Nash County,North Carolina"prepared by Mack Gay Associates,P.A.dated March 16, 2001. LESS AND EXCEPT all lots or graves conveyed by Cemetery Deed recorded in the Nash County Registry. / 78'pe-4e.l 3 2.6,00 301921-00003000/4969350v8 Book: 2814 Page: 773 Seq: 3 SUPPLEMENT EZ COVER PAGE, DRAINAGE AREAS FORM, WET POND FORM SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION 1 i Project Name Rocky Mount Memorial Park 2 Project Area(ac) 10.77 3 Coastal Wetland Area(ac) 4 Surface Water Area(ac) .13(wet pond permanent pool) 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(cd)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 1 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Phillip R Joyner,Jr.-Project Engineer 28 Organization: Mack Gay Associates,PA 29 Street address: 1667 Thomas A Betts Pkwy 30 City,State,Zip: Rocky Mount,NC 27804 31 Phone number(s): 252-446-3017 32 Email: phillip@mackgaypa.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Signature of Designer Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 _ 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 _ Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond 5 Total drainage area(sq ft) 286,164 6 Onsite drainage area(sq ft) 286,164 7 Offsite drainage area(sq ft) 8 Total BUA in project(sq ft) 54450 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) New BUA not on subdivided lots(subject to 10 permitting)(sf) 51231 sf 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) -Sidewalk(sq ft) 5431 sf -Roof(sq ft) -Roadway(sq ft) 49019 sf -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 3219 sf 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 19% 19 Design storm(inches) 1.0 in 20 Design volume of SCM(cu ft) 5276 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1 Drainage area number 1 2 Minimum required treatment volume (cu ft) 5276 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered No side slopes? Are the inlets, outlets, and receiving stream protected from erosion 7 (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Other 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes If the SCM is on a single family lot, does (will?) the plat comply with 13 General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H .1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment 166.00 removal) (fmsl) 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 167.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 172.00 23 Elevation of the permanent pool (fmsl) 172.00 24 Elevation of the top of the vegetated shelf (fmsl) 173.00 25 Elevation of the temporary pool (fmsl) 172.61 26 Surface area of the main permanent pool (square feet) 3094 27 Volume of the main permanent pool (cubic feet) 11137 cf 28 Average depth of the main pool (feet) 3.60 ft 29 Average depth equation used Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 1923 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean-out depth for forebay (inches) 12 in 35 Design volume of SCM (cu ft) 19840 cf 36 Is the outlet an orifice or a weir? Orifice Wet Pond 1 12:17 PM 10/21/2023 WET POND 37 If orifice, orifice diameter (inches) 1.0 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 4.1 41 Are the inlet(s) and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance (inches) 48 in 44 Depth of forebay at exit (inches) 24 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr, 24-hr storm? 50 Are fountains proposed? (If Y, please provide documentation that No MDC(9) is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 2 12:17 PM 10/21/2023 WET POND CALCULATIONS WATER QUALITY POND DESIGN CALCULATIONS AREA SUMMARY PERMANENT POOL SIZING acres sf Permanent Pool 11137 cf Drainage Area 6.57 286189 Permanent Pool 3094 sf Pervious Area 5.32 231 739 Average Depth= 3.6 ft Impervious Area 1.25 54450 ENTER SA/DA TABLE WITH 3.6' Impervious Cover 19% SA/DA(from table) 1.1 Piedmont Minimum Area 3005 sf RUNOFF VOLUME Permanent Pool Area 3094 sf Simple Method Permanent Pool Area Acceptable RUNOFF COEFFICIENT CALCULATION R„=0.05+0.9*IA Rv=Runoff coeefficient(runoff(in)/rainfall(in),unitless IA=Impervious fraction Rv= 0.221233 VOLUME CALCULATION V=3630*RD*Rv*A V=Volume to be controlled for the design storm(ft3) RD=Design Rainfall Depth (in) 1.0" or 1.5" A=Watershed Area(acres) Rainfall Capture Depth 1 inch Runoff Volume 5276.205 cf 1 PERMANENT POOL STAGE-STORAGE TABLES MAIN POND Elevation Area Incremental Cumulative Volume (sf) Volume(cf) (cf) Bottom of Sediment Storage 166 Bottom of Pond 167 1228 614 614 168 1542 1385 1999 169 1889 1716 3715 170 2262 2076 5790 171 2669 2466 8256 Permanent Pool 172 3094 2882 11137 FOREBA Y Elevation Area Incremental Cumulative Volume (sf) Volume(cf) (cf) Bottom of Sediement Storage 168 121 Bottom of Forebay 169 239 180 180 170 420 330 510 171 682 551 1061 Permanent Pool 172 1043 863 1923 Permanent Pool Total 11137 cf Forebay to Main Pond 17.3% OK TEMPORARY POOL STAGE-STORAGE TABLES MAIN POND+FOREBAY Elevation Area Incremental Cumulative Volume Volume Permanent Pool 172 4137 0 173 6281 5209 5209 174 7301 6791 12000 175 8378 7840 19840 176 9215 8797 28636 2 DRAW DOWN CALCULATIONS ORIFICE CALCULATIONS Q=Cp*A*1/(2*g*H0) Q=Discharge Rate(cfs) A=Area of orifice(sf) g=Acceleration of gravity Ho=Driving Head from orifice centroid to water surface(typically use H0/3 for decreasing head) Coefficient of Discharge 0.6 Orifice Size 1 in Orifice Size 0.08 ft Orifice Area 0.005 sf Temporary Pool Head 1.01 ft Driving Head 0.323 ft Discharge Rate 0.015 cfs DRAWDOWN PERIOD Discharge Time 4.1 Days 3 OUTLET STRUCTURE BOUYANCY CALCULATIONS STRUCTURE WEIGHT Box Dimensions Front/Rear(ft) Sides(ft) Base(ft) Width 4.0 5.3 5.3 Height 10.5 10.5 5.3 Thickness 0.50 0.50 2.0 #of Walls 2.0 2.0 1.0 Concrete Weight(lb/ft3) 150.0 150.0 150.0 Weight(lbs) 6300.0 8410.5 8427.0 Total Weight(lbs) 23137.5 Water Force Box Front Width(ft) 5.3 Box Side Width(ft) 5.3 Submerged Height(ft) 5.0 Water Weight(lb/ft3) 62.4 Displaced Water Weight 8764.1 Factor of Safety Minimum 1.5 SF= 2.6 RUNOFF CALCULATIONS Table of Contents Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Basin Model Schematic 1 Hydrograph by Return Period 2 1 -Year Hydrograph Summary 3 Hydrograph Reports Hydrograph No. 1, Rational, Pre 4 Hydrograph No.2, Rational, Post 5 Hydrograph No.3, Pond Route,Water Quality Pond 6 Detention Pond Reports-Dry Pond 7 2-Year Hydrograph Summary 11 Hydrograph Reports Hydrograph No. 1, Rational, Pre 12 Hydrograph No.2, Rational, Post 13 Hydrograph No.3, Pond Route,Water Quality Pond 14 10-Year Hydrograph Summary 15 Hydrograph Reports Hydrograph No. 1, Rational, Pre 16 Hydrograph No.2, Rational, Post 17 Hydrograph No.3, Pond Route,Water Quality Pond 18 100-Year Hydrograph Summary 19 Hydrograph Reports Hydrograph No. 1, Rational, Pre 20 Hydrograph No.2,Rational, Post 21 Hydrograph No. 3, Pond Route,Water Quality Pond 22 Basin Model Project Name: Hydrology Studio v 3.0.017 10-21-2023 Pre Post Water Quality Pond 1 Hydrograph by Return Period Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Hyd. Hydrograph Hydrograph Peak Outflow(cfs) No. Type Name 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational Pre 1.250 1.493 2.154 3.234 2 Rational Post 9.195 10.77 14.18 18.88 3 Pond Route Water Quality Pond 0.023 0.025 0.466 2.381 2 Hydrograph 1-yr Summary Project Name: 10-21-2023 Hydrology Studio v 3.0.0.27 Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum No. Type Name Flow Peak Volume Hyd(s) Elevation Storage (cfs) (hrs) (cuft) (ft) (cuft) 1 Rational Pre 1.250 1.20 5,399 --- 2 Rational Post 9.195 0.13 4,413 — 3 Pond Route Water Quality Pond 0.023 0.27 3,039 2 172.84 4,400 3 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Pre Hyd. No. 1 Hydrograph Type = Rational Peak Flow = 1.250 cfs Storm Frequency = 1-yr Time to Peak = 1.20 hrs Time Interval = 1 min Runoff Volume = 5,399 cuft Drainage Area =6.23 ac Runoff Coeff. = 0.17* Tc Method =TR55 Time of Conc. (Tc) = 72.0 min IDF Curve = Roanoke Rapids.IDF Intensity = 1.18 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1 *Composite C Worksheet AREA(ac) C DESCRIPTION 0.16 0.95 Impervious 6.07 0.15 Pervious 6.23 0.17 Qp = 1.25 cfs 2 1.9 1.8 1.7 1.6 • 1.5 1.4 1.3 1.2 1.1 N\ 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Time(min) 4 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Post Hyd. No. 2 Hydrograph Type = Rational Peak Flow = 9.195 cfs Storm Frequency = 1-yr Time to Peak = 0.13 hrs Time Interval = 1 min Runoff Volume =4,413 cuft Drainage Area =6.57 ac Runoff Coeff. = 0.34* Tc Method = TR55 Time of Conc. (Tc) = 8.0 min IDF Curve = Roanoke Rapids.IDF Intensity =4.12 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1 `Composite C Worksheet AREA(ac) C DESCRIPTION 1.25 0.95 Impervious 5.32 0.20 Pervious 6.67 0.34 Qp = 9.19 cfs 10— - 9_ _ - _ ._ A _ I - I 1 i 61 — 5- . a i 4_ — . — - - -- ' 3- — — — 1 2- — -- - 1 1_ - i - • l - 1 II 1 0 i I , i . i n - . I III IIIIII 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Time(min) 5 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Water Quality Pond Hyd. No. 3 Hydrograph Type = Pond Route Peak Flow = 0.023 cfs Storm Frequency = 1-yr Time to Peak = 0.27 hrs Time Interval = 1 min Hydrograph Volume = 3,039 cuft Inflow Hydrograph = 2- Post Max. Elevation = 172.84 ft Pond Name = Dry Pond Max. Storage = 4,400 cuft Pond Routing by Storage Indication Method Center of mass detention time=21.40 hrs Qp = 0.02 cfs 10 9- 8- 7- 6- 5- 4- 3- 2- 1- O-r ' 1 1 I 1 1 1 I 1 I 1 I I 1 I I I 1 I I 1 1 f I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time(hrs) —Post—Water Quality Pond 6 Pond Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Dry Pond Stage-Storage User Defined Contours Stage/Storage Table Description Input Stage Elevation Contour Area Incr.Storage Total Storage (ft) (ft) (sgft) (cuft) (cuft) Bottom Elevation, ft 172.00 • 0 00 172.00 4,137 0.000 0.000 Voids(%) 100.00 1.00 i 173.00 1 6,281 5,209 5,209 Volume Calc None 2.00 174.00 7,301 6,791 12,000 3.00 175.00 8,378 7,840 19,840 4.00 176.00 9,215 8,797 28,636 Stage-Storage 176- 4 175- -3 in a (T.,174- -2 w 173- -1 172 ' I i 1 I i i 1 i 0 0 4000 8000 12000 16000 20000 24000 28000 Total Storage(cuft) —Contours 7 Pond Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Dry Pond Stage-Discharge Orifices Culvert I Orifices Culvert Orifice Plate 1* 2 3 Rise, in 15 1 Orifice Dia, in Span, in 15 1 No. Orifices No. Barrels 1 1 Invert Elevation, ft Invert Elevation,ft 172.00 172.01 Height, ft Orifice Coefficient, Co 0.60 0.60 Orifice Coefficient, Co Length,ft 64 Barrel Slope, % 2.96 N-Value, n 0.013 Weirs Weirs Riser* Ancillary 1* 2 3 Shape/Type Box Rectangular Exfiltration, in/hr Crest Elevation, ft 174 173.1 Crest Length, ft 16 3 Angle, deg Weir Coefficient, Cw 3.3 3.3 'Routes through Culvert. Stage-Discharge 176 4 175- •3 174 •2 LL, � 173 -1 172-t r0 0 1 2 3 4 5 6 7 8 9 10 11 Discharge(cfs) Top of Pond —Culvert —Riser —Orifice —Rectangular --Total Q 8 Pond Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Dry Pond Stage-Storage-Discharge Summary Orifices,cfs weirs,cfs Stage Elev. Storage Culvert Riser Pf Riser Exfil User Total (ft) (ft) (tuft) (cfs) 1 2 3 (cfs) 1 2 3 (cfs) (cfs) (cfs) (cfs) 0.00 172.00 0.000 0.000 0.000 0.000 0.000 0.000 1.00 173.00 5,209 0.025 is 0.025 0.000 0.000 0.025 2.00 174.00 12,000 6.163 is 0.014 0.000 6.149 s 6.163 3.00 175.00 19,840 9.105 ic 0.000 0.000 0.000 9.105 4.00 176.00 28,636 10.85 ic 0.000 0.000 0.000 10.85 Sulfur key:ic=Inlet control,oc=outlet control,s=submerged weir 9 v Q a O m D 16- Dry Pond - Drain Time _4 =0 CD- a a X (D o O M- 175- 13 LA d ?174- •2 m u, o -- 173- 1 m x lig- O. CD O. 172 , 1 ..._r--.1 1 1—r- I r I i I_ _1 , 1 I i i i i I , i 1 I I t 0 v 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 CD Drain Time(Hrs) CD o — WQv = 5,276 cuft @ 66.0 hrs, Max Q = 0.00 cfs @ 173.01 ft —Stage vs. Drain Time = � Z O r., N 0 3 m w .. Hydrograph 2-yr Summary Project Name: 10-21-2023 Hydrology Studio v 3.0.0.27 Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum No. Type Name Flow Peak Volume Hyd(s) Elevation Storage (cfs) (hrs) (cuft) (ft) (cuft) 1 Rational Pre 1.493 1.20 6,448 --- 2 Rational Post 10.77 0.13 5,169 — 3 Pond Route Water Quality Pond 0.025 0.27 3,386 2 172.99 5,155 11 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Pre Hyd. No. 1 Hydrograph Type = Rational Peak Flow = 1.493 cfs Storm Frequency =2-yr Time to Peak = 1.20 hrs Time Interval = 1 min Runoff Volume = 6,448 cuft Drainage Area =6.23 ac Runoff Coeff. = 0.17* Tc Method =TR55 Time of Conc. (Tc) = 72.0 min IDF Curve = Roanoke Rapids.IDF Intensity = 1.41 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1 *Composite C Worksheet AREA(ac) C DESCRIPTION 0.16 0.95 Impervious 6.07 0.15 Pervious 6.23 0.17 Qp = 1.49 cfs 2- — — 1.9- 1.8- 1.6- — • 1.5- -- 1.4- 1.3- 1.2- 1.1- 1- -- f CI - 0.9- 0.8- — 0.7- 0.6- i 0.5- 0.4- 0.3- - 0.2- --- • _ • 0 III 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Time(min) 12 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Post Hyd. No. 2 Hydrograph Type = Rational Peak Flow = 10.77 cfs Storm Frequency = 2-yr Time to Peak = 0.13 hrs Time Interval = 1 min Runoff Volume = 5,169 cuft Drainage Area =6.57 ac Runoff Coeff. = 0.34* Tc Method =TR55 Time of Conc. (Tc) = 8.0 min IDF Curve = Roanoke Rapids.IDF Intensity =4.82 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1 *Composite C Worksheet AREA(ac) C DESCRIPTION 1.25 0.95 Impervious 5.32 0.20 Pervious 6.57 0.34 Qp = 10.77 cfs 12- -- — - 11- 1 10- - • 9- - • - 1 • 8- -- — . _ a 5- ._ . i 3- - I - i 2- 1 - 1- 0 , I 1 1 I 1 I 1 I i I . 1 I 1 I r -I 1 1 IF I ' I I I 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Time(min) 13 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Water Quality Pond Hyd. No. 3 Hydrograph Type = Pond Route Peak Flow = 0.025 cfs Storm Frequency = 2-yr Time to Peak = 0.27 hrs Time Interval = 1 min Hydrograph Volume = 3,386 cuft Inflow Hydrograph = 2- Post Max. Elevation = 172.99 ft Pond Name = Dry Pond Max. Storage = 5,155 cuft Pond Routing by Storage Indication Method Center of mass detention time=21.66 hrs Qp = 0.03 cfs 12- 11, 10- 9- 8- 7- 6_ a 5- 4- 3- 2-- 1- 0 1 1 I I I 1 1 1 1 I I 1 , I if 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time(hrs) —Post—Water Quality Pond 14 Hydrograph 10-yr Summary Project Name: 10-21-2023 Hydrology Studio v 3.0.0.27 Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum No. Type Name Flow Peak Volume Hyd(s) Elevation Storage (cfs) (hrs) (cuft) (ft) (cuft) 1 Rational Pre 2.154 1.20 9,307 — 2 Rational Post 14.18 0.13 6,805 — 3 Pond Route Water Quality Pond 0.466 0.27 4,503 2 173.22 6,719 15 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Pre Hyd. No. 1 Hydrograph Type = Rational Peak Flow =2.154 cfs Storm Frequency = 10-yr Time to Peak = 1.20 hrs Time Interval = 1 min Runoff Volume = 9,307 cuft Drainage Area =6.23 ac Runoff Coeff. = 0.17* Tc Method =TR55 Time of Conc. (Tc) = 72.0 min IDF Curve = Roanoke Rapids.IDF Intensity = 2.03 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1 Composite C Worksheet AREA(ac) C DESCRIPTION 0.16 0.95 Impervious 6.07 0.15 Pervious 6.23 0.17 Qp = 2.15 cfs 3— 2_ . U, 0 - 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Time(min) 16 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Post Hyd. No. 2 Hydrograph Type = Rational Peak Flow = 14.18 cfs Storm Frequency = 10-yr Time to Peak = 0.13 hrs Time Interval = 1 min Runoff Volume = 6,805 cuft Drainage Area =6.57 ac Runoff Coeff. = 0.34* Tc Method =TR55 Time of Conc. (Tc) = 8.0 min IDF Curve = Roanoke Rapids.IDF Intensity =6.35 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1 'Composite C Worksheet AREA(ac) C DESCRIPTION 1.25 0.95 Impervious 5.32 0.20 Pervious 6.67 0.34 Qp = 14.18 cfs 15- •--- 14- 1 - i --1 13- _- - - -{ .-- --- 12- -• - --. - . -- 10- -. 7= - - —.__ - 5- • i , - - -i- 4- 3- — 2- • - r _. _ - 1-_ I -_ - 0 , 1 i I . I . I , I . I . r . I , T r r . I , I , I , I , I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Time(min) 17 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Water Quality Pond Hyd. No. 3 Hydrograph Type = Pond Route Peak Flow = 0.466 cfs Storm Frequency = 10-yr Time to Peak = 0.27 hrs Time Interval = 1 min Hydrograph Volume =4,503 cuft Inflow Hydrograph = 2 - Post Max. Elevation = 173.22 ft Pond Name = Dry Pond Max. Storage = 6,719 cuft Pond Routing by Storage Indication Method Center of mass detention time=18.39 hrs Qp = 0.47 cfs 16 15 14 13 12 11 10 9 - 8 a 7 6 5 4 3 2 1 IL 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time(hrs) —Post—Water Quality Pond 18 Hydrograph 100-yr Summary Project Name: 10-21-2023 Hydrology Studio v 3.0.027 Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum No. Type Name Flow Peak Volume Hyd(s) Elevation Storage (cfs) (hrs) (cuft) (ft) (cuft) 1 Rational Pre 3.234 1.20 13,969 — 2 Rational Post 18.88 0.13 9,062 — 3 Pond Route Water Quality Pond 2.381 0.25 6,734 2 173.48 8,492 19 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Pre Hyd. No. 1 Hydrograph Type = Rational Peak Flow = 3.234 cfs Storm Frequency = 100-yr Time to Peak = 1.20 hrs Time Interval = 1 min Runoff Volume = 13,969 cuft Drainage Area =6.23 ac Runoff Coeff. = 0.17* Tc Method =TR55 Time of Conc. (Tc) = 72.0 min IDF Curve = Roanoke Rapids.IDF Intensity = 3.05 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1 *Composite C Worksheet AREA(ac) C DESCRIPTION 0.16 0.95 Impervious 6.07 0.15 Pervious 6.23 0.17 Qp = 3.23 cfs 4- 3- Ln v2_ a • 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Time(min) 20 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Post Hyd. No. 2 Hydrograph Type = Rational Peak Flow = 18.88 cfs Storm Frequency = 100-yr Time to Peak = 0.13 hrs Time Interval = 1 min Runoff Volume = 9,062 cuft Drainage Area =6.57 ac Runoff Coeff. = 0.34* Tc Method =TR55 Time of Conc. (Tc) = 8.0 min IDF Curve = Roanoke Rapids.IDF Intensity = 8.45 in/hr Freq. Corr. Factor = 1.00 Asc/Rec Limb Factors = 1/1 'Composite C Worksheet AREA lac) C DESCRIPTION 1.25 0.95 Impervious 5.32 0.20 Pervious 6.57 0.34 Qp = 18.88 cfs 21- — - 20- 19- l I 18- - - 17- _ i 16- ..- -- 14- I - { 13- - i 1 12- - u11 - O'10- , -_... { 9- 8- 7- 6- ---. - - 5_ 6 4- — 3- - 2- I .. - -- -.—. 0 • 1 . 1 , I , I ' I • I . T • 1 . 1 , 1 , i L 1 i 1 • r , I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Time(min) 21 Hydrograph Report Project Name: Hydrology Studio v 3.0.0.27 10-21-2023 Water Quality Pond Hyd. No. 3 Hydrograph Type = Pond Route Peak Flow = 2.381 cfs Storm Frequency = 100-yr Time to Peak = 0.25 hrs Time Interval = 1 min Hydrograph Volume =6,734 cuft Inflow Hydrograph = 2 - Post Max. Elevation = 173.48 ft Pond Name = Dry Pond Max. Storage = 8,492 cuft Pond Routing by Storage Indication Method Center of mass detention time=2.86 hrs Qp = 2.38 cfs 21- 20- _ 19i 18- • 17- 16- 15- 14- 13- • 12- �,11- a10- 9- 8- 7- 6- • 5- 4- 3- 2- 1 O I I 1 I 1 1 1 1 I • 1 I I ' I I I r I • 1 I I 1 I I I 1 . 1 . I I 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time(hrs) —Post—Water Quality Pond 22 PIPE NETWORK CALCULATIONS l r Line1 Project Name:Enter Project Name... Line 10-21-2023 Stormwater I Studio 2023 v 3.0.0.32 Elev (ft) 192.00 192.00 190.00 190.00 188.00 188.00 ai C_ J C 7 . • QLlf0 c0 C 186.00 —� q er' r 186.00 r r m + • n r r r w u 184.00 .EJ-.E 0 k u v 184.00 v) o' C 2 2 w w 182.00 @ - 182.00 o 180.00 O r esi r c^ 180.00 w O J E 178.00 mitt' — 178.00 176.00 176.00 JAI 174.00 - 174.00 172.00 75Lf-24"@ 1.01% 172.00 170.00 170.00 0 10 20 30 40 50 60 70 80 90 Reach (ft) Gmd Surface HGL - EGL Project File:p210191-SW Network.sws Line 2 Project Name:Enter Project Name... Stormwater Studio 2023 v 3.0.0.32 10-21-2023 Elev (ft) `V iii C j 194.00 � _ rn rn rn o , , 194.00 co • kci ui io " " i° cn N- • • cd 06 . "- r T- ~ W LT, Li, _ '- r 190.00 6 0 ` ` x iWWW190.00 5 o ^ 2 p E O c 0 coo r, VD m torvcou, + • . - '—— O W W W J J 186.00 La " 017JJ 186.00 Cr) tr _ = iww _sue-i-. 182.00 182.00 0000000,0 178.00 -- - - -- --- ------- ------� _ - 178.00 174.00 -T} 1 •i • ^ ' 174.00 170.00 170.00 166.00 166.00 0 20 40 60 80 100 120 140 160 180 200 220 Grnd Surface HGL - EGL Reach (ft) Project Filo:p210191-SW Network.sws Line 3 Project Name:Enter Project Name... Stormwater Studio 2023 v 3.0.0.32 10-21-2023 Elev (ft) 195.00 195.00 co 193.00 — - �., 193.00 J 7 o •to to 0 c 0 c c.., 7 cV N. cd : N N N C C '� t` n ti O -' w W '— o ,- of 01 r r E > > t.7 l7 d r-- 03 (n E C C I i W W 189.00 ± — MEM 189.00 m E > > > 0l7 l7 l7 co E c c C = = LLJ L1.1 187.00 -- 187.00 MI 185.00 - __ 185.00 183.00 183.00 181.00 181.00 179.00 EMECEINIMiliiiiiiiiiililiiiii---- • 179.00 177.00 I 1. eje 177.00 71Lf- 18"@ 175.00 175.00 173.00 173.00 0 10 20 30 40 50 60 70 80 90 Grnd Surface HGL - EGL Reach (ft) Project File:p210191-SW Network.sws Line 4 Project Name:Enter Project Name... Stormwater Studio 2023 v 3.0.0.32 10-21-2023 Elev (ft) 203.00 203.00 199.00 199.00 t= Qc COH `zr hih: co C C O C c0 N to C C) L!1 L!l Q co C 6) •• co �. • N • N M M 195.00 °l o . . �0 i r t` tb co.._ 00„ N * co c0 N LID + • CO� CO 0�0 > > > l7 l7 C7 woo C) W W W J ' • C C C I I I W W W . E > > C7 0 l7 l7 U) OC C dim W 191.00 191.00 187.00 ■ ' 187.00 _ -Y 183.00 - _ - 183.00 --- -------------------- ---- "370Lf 18• @ .54% 179.00 179.00 175.00 175.00 171.00 171.00 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 Reach (ft) Gmd Surface - HGL - EGL Project File:p210191-SW Network.sws Line 5 Stormwater Studio 2023 v 3.0.0.32 Project Name:Enter Project Name... 10-21-2023 Elev (ft) 200.00 200.00 198.00 198.00 196.00 196.00 194.00 "' 194.00 C C • Y _I O O N O C J O OO 7 0 co co crrio co N N Ln m iii -5 , In o 192.00 0 — w co co co co co co � � N � `*cia " L° ui 192.00 O W W W W J • °O co lz (0 E > J 1 M I W J U) 2 c c c 2 2 w w 6 C > (� J CO tY E i w 190.00 190.00 188.00 188.00 186.00 - - ---------------------- - - 186.00 ------------- --------------- 184.00 — I165Lf 15" @ 1.01% 184.00 182.00 182.00 0 20 40 60 80 100 120 140 160 180 Grnd Surface HGL - EGL Reach (ft) Project File:p210191-SW Nefwork.sws Line 6 Project Name:Enter Project Name... 10-21-2023 Stormwater Studio 2023 v 3.0.0.32 Elev (ft) 198.00 198.00 196.00 196.00 194.00 194.00 N 5 Co ai O c c Y ,. fl r7tp 1; 8 c c O 5 ..., 7 oo m ni Ci r' v i m Z. v - 0 0 192.00 0+ w77waoao N ° co 192.00 N E > > > -9 J t5 J + °o c0 U) .62 c c c 2 2 w w co E > C7 l7 U) o c 2 w 190.00 190.00 188.00 188.00 186.00 __ 186.00 184.00 29Lf- 15"Q 2.01% L 184.00 182.00 182.00 0 5 10 15 20 25 30 Grnd Surface HGL - EGL Reach (ft) Project File:p210191-SW Network.sws Line 7 Project Name:Enter Project Name... Stormwater Studio 2023 v 3.0.0.32 10-21-2023 Elev (ft) 193.00 193.00 N +-' 7 191.00 — co0M .` o � ; c . 191.00 J O d' Lr1 O — w kb u p tr-1 rn rn r-- O co N N N N l0 O^l 0^0. C 7 C 189.00 c,-- u; ,r; m J - .- v- a , 0 189.00 Cu0 E > > > i i u.i w7 ca o m Cr) CO c� = 2 2 w w N 7 7 O1 Q1 IQ of r` 187.00 - - N wwu 187.00 m E > t9 l9 7 7 U) c c S = w .0 7 185.00 •---- 185.00 183.00 183.00 181.00 181.00 __ 179.00 179.00 _11177.00 177.00 224_f- 18"@ O.tu% 175.00 175.00 173.00 173.00 0 20 40 60 80 100 120 140 160 180 200 220 240 260 Reach (ft) Grnd Surface HGL - EGL Project File:p210191-SW Network.sws Line 8 Project Name:Enter Project Name... 10-21-2023 Stormwater Studio 2023 v 3.0.0.32 Elev (ft) 193.00 193.00 191.00 - 191.00 N. Y 189.00 o .. - 189.00 O — p 0 c co co r\ Y O w W W - - -- - J 0.-; 7 7 187.00 �, � o o = 187.00 .Eg C ; ; J J J J co co V) a. c c 2 I w w 6 CO \ oo l0 CO, p p al 01 0 P.. + ^ r_ r` r lJ.l J.I a-- 1--' 185.00 01 &E 5c = = 2W 185.00 183.00 ` 183.00 181.00 ` 181.00 i I 179.00 --' __--- - 179.00 107Lf- 15" @ 1.00% 177.00 177.00 175.00 175.00 0 10 20 30 40 50 60 70 80 90 100 110 Grnd Surface - HGL - EGL Reach (ft) Project File:p210191-SW Network.sws