HomeMy WebLinkAbout_20240225_U-4758 Buffer Determination Widen_ SR1818_SR1850 (2)Carpenter, Kristi
From: Crowther V., Robert E
Sent: Wednesday, March 13, 2024 1:20 PM
To: Conchilla, Ryan
Subject: RE: 20240225_U-4758 Buffer Determination Widen_ SR1818/SR1850
Attachments: U-4758 Field Data and Photos.pdf
Hey Ryan,
Attached is a PDF containing a Stream ID Form, Antecedent Precipitation Report, and Photos of the areas
requested. Feel free to give me a call to discuss as needed.
Thanks,
Rob
Rob Crowther, PWS
Environmental Program Consultant
Environmental Coordination & Permitting
Environmental Analysis Unit
N.C. Department of Transportation
804 761 2455 mobile
919 707 6112 office
recrowthera-ncdot.gov
1598 Mail Service Center (Mail)
Raleigh, NC 27699-1598
1000 Birch Ridge Drive (Delivery)
Raleigh, NC 27610
From: Crowther V., Robert E
Sent: Thursday, February 29, 2024 10:34 AM
To: Conchilla, Ryan <ryan.conchilla@deq.nc.gov>
Subject: RE: 20240225_U-4758 Buffer Determination Widen_ SR1818/SR1850
Rya n
I appreciate you reaching out to chat about this one. That often makes things easier for everyone. See my
responses below in blue. I'll update you again with the data we get collected on that feature in the field.
As a forward -looking FYI ... we're probably going to be submitting this permit application towards the end of
March/early April. Not that this can't be resolved concurrently with that, just wanted to give a heads up.
Thanks so much,
Rob Crowther, PWS
Environmental Program Consultant
Environmental Coordination & Permitting
Environmental Analysis Unit
N.C. Department of Transportation
804 761 2455 mobile
919 707 6112 office
recrowthera-ncdot.gov
1598 Mail Service Center (Mail)
Raleigh, NC 27699-1598
1000 Birch Ridge Drive (Delivery)
Raleigh, NC 27610
qu i ii
�s
w ^�
From: Conchilla, Ryan <rvan.conchilla@deg.nc.gov>
Sent: Wednesday, February 28, 2024 1:15 PM
To: Crowther V., Robert E <recrowther@ncdot.gov>
Subject: 20240225_U-4758 Buffer Determination Widen_ SR1818/SR1850
Robert,
Thank you for speaking with me regarding the buffer determination request for this project.
In the supplemental info, Permit Drawing Site 5 (unnamed Pond), sheet 10 and sheet 11 were not included in the PDF.
Site 5 is depicted on Sheets 4 and 5 of the Buffer Impacts Drawings (Sheets 10 and 11 are the Impact Summary Sheets).
I'm reattaching that drawing set just in case it got lost in PDF editing on the original submittal.
On Sheet 5, page 7 Jurisdictional features map (attached), please forward any field data collected downgradient of the
15" outlet culvert, draining from Pond P4. If possible, corresponding photos should also be provided for the Pond, 15"
outlet culvert and ephemeral feature.
We are going to mobilize either a consultant, or one of ourselves here internally, to go out and grab a Stream ID Form
and the Photos as requested. This is an older project, and the record keeping wasn't stellar on this one.
In the PJD, Section D. Remarks, field revisions were made to Figures 2-2h, but those figures are not included.
In the same line of poor record keeping ... the figures that accompanied that issued PJD seem to be lost to history. What I
can confirm is that what is shown in the NRTR figures provided is the final delineation (post USACE changes, whatever
those were).
If you can forward this information, it will aid review of the determination request.
Thanks
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch
North Carolina Department of Environmental Quality
919-707-9111 office
Ryan.Conchilla@deg.nc.gov
D- E
�
NORTH CAROLINA7.AM Q
kl/)
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.