Dear Mr. Love:
This letter is in response to the Pre-Construction Notification (PCN) you submitted to
the Wilmington District, Charlotte Regulatory Field Office on February 27, 2024, for a
Department of the Army Nationwide permit (NWP) verification. This project has been
assigned the file number SAW-2019-00697 and is known as Bethabara Road Culvert
Replacement Project. This file number should be referenced in all correspondence
concerning this project.
A review of the information provided indicates that the proposed work would include
123 LF (0.042 acres) of permanent stream impacts for bank stabilization and riprap
apron installation, 72 LF (0.025 acres) of permanent loss stream impacts for a bottomed
culvert installation, and 137 LF (0.047 acres) of temporary stream impacts for
dewatering in order to replace a failing bottomless culvert. The project area for this
determination includes a 1.03 acre(s) area which is illustrated on the enclosed site
plans/maps. The project/review area is located off of Bethabara Road, north of Silas
Creek Parkway, at Latitude 36.150376 and Longitude -80.150376; in Winston-Salem,
Forsyth County, North Carolina.
We have determined that the proposed work is authorized by Nationwide Permit 14
(Linear transportation) pursuant to authorities under Section 404 of the Clean Water Act
(33 U.S.C § 1344). The proposed work must be accomplished in strict accordance with
the general permit conditions, any regional conditions, the special conditions listed in
this letter, the application materials, and the enclosed plans. If the extent of the project
area and/or nature of the authorized impacts to waters are modified, a revised PCN
must be submitted to this office for written approval before work is initiated. Any
violation of permit conditions or deviation from your submitted plans may subject the
permittee to enforcement action.
This verification is valid until March 14, 2026, unless prior to this date the subject
NWP(s) is suspended, revoked, or is modified such that the activity no longer complies
with the terms and conditions of this NWP. If you commence or are under contract to
commence this activity before the date that the relevant NWP is modified or revoked,
you will have 12 months from the date of the modification or revocation of the NWP to
complete the activity under the present terms and conditions of this NWP.
Project Specific Special Conditions:
1. In order to compensate for impacts associated with this permit, mitigation shall
be provided in accordance with the provisions outlined on the most recent
version of the attached Compensatory Mitigation Responsibility Transfer Form.
The requirements of this form, including any special conditions listed on this
form, are hereby incorporated as special conditions of this permit authorization.
Activities subject to Section 404 (as indicated above) may also require an individual
Section 401 Water Quality Certification. You should contact the NC Division of Water
Resources (telephone 919-807-6300) to determine Section 401 requirements.
This NWP verification does not preclude the necessity to obtain any other Federal,
State, or local permits, licenses, and/or certifications, which may be required.
If you have any questions related to this verification or have issues accessing
documents referenced in this letter, please contact Jennifer Lawrence, Regulatory
Specialist of the Charlotte Regulatory Field Office at (980)392-9980, by mail at the
above address, or by email at jennifer.l.lawrence@usace.army.mil. Please take a
moment to complete our customer satisfaction survey located at
https://regulatory.ops.usace.army.mil/customer-service-survey/.
Sincerely,
Jennifer Lawrence
Regulatory Specialist
Enclosures
Cc (w/enclosures)
Jessica Tisdale, HDR Engineering, Inc. of the Carolinas
(via Jessica.tisdale@hdrinc.com)
Compliance Certification Form
File Number: SAW-2019-00697 County: Forsyth
Permittee: City of Winston-Salem, Todd Love
Project Name: Bethabara Road Culvert Replacement Project
Date Verification Issued: 4/5/2024
Project Manager: Jennifer Lawrence
Upon completion of the activity authorized by this permit and any mitigation required by
the permit, sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
Wilmington District
Attn: Jennifer Lawrence
Charlotte Regulatory Field Office
8430 University Executive Park Drive Suite 615
Charlotte, NC 28262
or
jennifer.l.lawrence@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S.
Army Corps of Engineers representative. Failure to comply with any terms or conditions
of this authorization may result in the Corps suspending, modifying or revoking the
authorization and/or issuing a Class I administrative penalty, or initiating other
appropriate legal action.
I hereby certify that the work, and mitigation (if applicable), authorized by the above
referenced permit has been completed in accordance with the terms and conditions of
the said permit including any general or specific conditions.
Date Authorized Work Started: ___________ Completed: ___________
Describe any deviations from permit (attach drawing(s) depicting the deviations):
______________________________________________________________________
______________________________________________________________________
*Note: The description of any deviations on this form does not constitute approval by the Corps.
__________________________________ ______________________
Signature of Permittee Date
PLPLPLPL
PL
PL
PL
PL
PL PL PL
PL
PL PL
SS
E
SS
E
SS
E
SS
E
SS
E
SS
E
SS
E
SS
E
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE SSE
PD
E
PD
E
PD
E
PD
E
PD
E
PD
E
PD
E
PD
E
PD
E
SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE
SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE
PLPLPLPL
PL
PL
PL
PL
PL PL PL
PL
PL PL
SS
E
SS
E
SS
E
SS
E
SS
E
SS
E
SS
E
SS
E
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE
SSE SSE
PD
E
PD
E
PD
E
PD
E
PD
E
PD
E
PD
E
PD
E
PD
E
SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE
SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE SSE
TC
E
TC
E
TC
E
TC
E
PD
E
PDE PDE
TC
E
TC
E
TCE
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
TCE
TCE
PDE PDE
PD
E
PD
E
PD
E
PDEPDEPDE
LO
D
LOD
PT
S
t
a
.
1
8
+
9
7
.
1
8
SSSSSSSSSS
807
80
8
79
5
80
0
80
5
795
80
0
80
5
16'-1" X 10'-4" ALUMINUM
STRUCTURAL PLATE
CULVERT
805
ALUMINUM STRUCTURAL
PLATE HEADWALL WTH
WINGS, (TYP,)
STORM CULVERT PROFILE
H: SCALE 1" = 20'
V: SCALE 1" = 4'
790.00
800.00
810.00
790.00
800.00
810.00
10+00.00 11+32.6810+00.00
79
0
.
8
8
79
0
.
8
8
10+50.00
80
6
.
4
9
80
6
.
4
9
11+00.00
78
9
.
7
4
78
9
.
7
4
11+50.00
FINISH GRADE
EXISTING GRADE
EX. 12" WATER MAIN
TOP OF HEADWALL, 802.50'TOP OF HEADWALL, 802.50'
71.5' - 16'-1" X 10'-4" CULVERT
EX. 24" WATER MAIN
10
'
-
4
"
15
'
PROPOSED 1.5' BURY DEPTH
SEE CULVERT DETAILS FOR
BAFFLE AND SILL LAYOUT
15
'
APPROX. DEPTH
APPROX. DEPTH
EL 787.51
EX. ARCH
CULVERT
APPROX.
DEPTH
EL 787.51
PROVIDE RUBBER MAT PROTECTION
BETWEEN WATERLINE AND
PROPOSED CULVERT
INV. 789.53INV. 789.20
SIDEWALK CURB AND GUTTER
TOP OF FILL ELEV. 790.70'
TOP OF FILL ELEV. 791.03'
00 4'8'2'
SCALE 1"=4'
CULVERT PLAN AND PROFILE
10381723-01CG112.DWG
1" = 20'01CG112
B
2
ISSUE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
FILENAME
SCALE
SHEET
DATE
C
D
A
1 3 4 5 6 7 8
BETHABARA ROAD EMERGENCY
CULVERT REPLACEMENT PROJECT
Winston-Salem, North Carolina
C. BENNETT, PE
10294945
DESIGNED BY:
CHECKED BY:
DRAWN BY:
NOT FOR
CONSTRUCTION
P. BLANDFORD, PE
M. LITTLE, PE
T.EPPLEY
0 12/2023 60% DESIGN SUBMITTAL
PLAN VIEW
SCALE: 1" = 20'
VERT.
00 20'40'10'
SCALE 1"=20'HORZ.
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Page 1 of 2
Compensatory Mitigation Responsibility Transfer Form
Permittee: Todd Love Action ID: SAW‐2019‐00697
Project Name: Bethabara Road Culvert Replacement Project County: Forsyth
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee’s responsibility to ensure
that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting
authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the
mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8‐digit Hydrologic
Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must
be provided to the appropriate Mitigation Sponsors.
Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released
and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified
mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor
must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project
Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on
page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements
Permitted Impacts Requiring Mitigation*: 8‐digit HUC and Basin: 03040101, Yadkin River Basin
Stream Impacts (linear feet) Wetland Impacts (acres)
Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal
72
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8‐digit HUC and Basin: 03040101, Yadkin River Basin
Stream Mitigation (credits) Wetland Mitigation (credits)
Warm Cool Cold Riparian Riverine Riparian Non‐Riverine Non‐Riparian Coastal
72
Mitigation Site Debited: NCDMS_________________________________________________________________________
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington
District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide
the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor’s Authorized Representative:
Signature of Sponsor’s Authorized Representative Date of Signature
Page 2 of 2 Form Date July 7, 2020
Conditions for Transfer of Compensatory Mitigation Credit:
Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form,
the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee
remains responsible for any other mitigation requirements stated in the permit conditions.
Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin
only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor
has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides
mitigation for authorized impacts conducted by the North Carolina Department of Transportation (NCDOT),
construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed
by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible
for the mitigation until the District has received this form, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein.
Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE
administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee’s responsibility to
ensure that the District Project Manager (address below) is provided with a signed copy of this form.
If changes are proposed to the type, amount, or location of mitigation after this form has been signed and
returned to the District, the Sponsor must obtain case‐by‐case approval from the District Project Manager
and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied,
as per current District guidance and a new version of this form must be completed and included in the District
administrative records for both the permit and the Bank/ILF Instrument.
Comments/Additional Conditions:
A statement of availability was provided by NCDMS on 2/9/2024 and was included with the preconstruction
notification.
This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1.
Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the
Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the
Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email
to SAWMIT@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the
District Mitigation Office.
USACE Project Manager: Jennifer Lawrence
USACE Field Office: Charlotte Regulatory Field Office
US Army Corps of Engineers
8430 University Executive Park Drive
Charlotte, North Carolina 28262
Email: jennifer.l.lawrence@usace.army.mil
April 5, 2024______
Wilmington District Project Manager Signature Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional