HomeMy WebLinkAboutWQ0045165_Application (FTSE)_20240415 State of North Carolina
Department of Environmental Quality
DWR Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23&SUPPORTING DOCUMENTATION
Application Number: ✓if—
(to be completed by DWR)
All items must be completed or the application will be returned
[. APPLICANT INFORMATION:
. Applicant's name: City f Durham - Department of Water Management(company,municipality, HOA,utility,etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately-Owned Public Utility
❑ Federal ❑ State'County ® Municipal ❑ Other
3. Signature authority's name: Donald F. Greeley per.]iA NC'AC 02T 0100(bl
Title: Director
4. Applicant's mailing address: 101 City Hall Plaza
City: Durham State:NC Zip: 27701-
5. Applicant's contact information:
Phone number: (919) 560-4381 Email Address: don.greeleyadurhamnc.gov
[1. PROJECT INFORMATION:
I. Project name: Leesville Road Assemblage Pump Station and Force Main
2. Application/Project status: ® Proposed(New Permit) ❑ Existing Permit/Project
If a modification,provide the existing permit number: WQ00 and issued date: ,
For modifications, also attach a detailed narrative description as described in Item G of the checklist.
If new construction,but part of a master plan,provide the existing permit number: WQ00
3. County where project is located: Durham
4, Approximate Coordinates(Decimal Degrees): Latitude: 35.9418 Longitude:-78.7757
5. Parcel ID(if applicable): 0769577250(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
Professional Engineer: John Phillips, PE License Number: 10130
Firm: Diehl &Phillips, P.A.
Mailing address: 1500 Piney Plains Road,Suite 200
City: Cary State: NC Zip: 27518-
Phone number: (919)467-9972 Email Address:*phillipsabellsouth.net
IV. WASTEWATER TREATMENT FACILITY(WWTF) INFORMATION:
1 Facility Name: North Durham Water Reclamation Facility Permit Number: NCO023841
Owner Name: City of Durham
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
l Permit Number(s): WQ_____
2. Downstream (Receiving) Sewer Information: 12 inch X Gravity Force Main
3. System Wide Collection System Permit Number(s)(if applicable): WQCS
Owner Name(s): .
FORM: FTA 10-23 Page ] of 5
NC Dept of Environmental Quality
Apr 15 2024
VI. GENERAL REQUIREMENTS Raleigh Regional Office
1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
❑Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM: DEV)been attached?
❑Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement(FORM:HOA)and
supplementary documentation as required by 15A NCAC 02T.0115(c)been attached?
❑Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
®Residential(Individually Owned) ❑Retail(stores,centers,malls) ❑ Car Wash
❑Residential(Leased) ❑Retail with food preparation/service ❑Hotel and/or Motels
❑ School/preschool/day care ❑Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse
❑Food and drink facilities ❑Church ❑ Swimming Pool/Filter Backwash
❑Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment)
5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial,is there a Pretreatment Program in effect?❑Yes❑No
6. Hasa flow reduction been approved under 15A NCAC 02T.0114(f)? ❑Yes ❑No
➢ If Yes,provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0114(f)) Daily Design Flow a,b No.of Units Flow
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
gal/ GPD
Total 0 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(1) and(e)(2) for caveats to wastewater design flow rates (i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4).
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.01141 shall be
determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data.
8. Wastewater generated by project: 0 GPD(per 15A NCAC 02T.0114 and G.S. 143-215.1)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero,please indicate why:
❑Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
®Flow has already been allocated in Permit Number: S-001299(Issued by City of Durham)_ Issuance Date: 7/12/2023
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other(Explain):
FORM:FTA 10-23 Page 2 of 5
VI1. GRAVITY SEWER DESIGN CRITERIA (If Applicable)-02T,0305& MDC (Gra-sit) Sellers):
1. Summarize gravity sewer to be permitted:
Size(inches) Length (feet) Material
N/A N/A Nl,A
➢ Section I1 & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
Vill. PUMP STATION DESIGN CRITERIA (If Applicable)—02T.0305 & i\IDC (Puma Stations,'Force .Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
l. Pump station number or name: Leesville Road Assemblage Pump Station
2. Approximate Coordinates(Decimal Degrees): Latitude: 35.9418 Longitude: -78.7757
3. Total number of pumps at the pump station: 2
3. Design flow of the pump station: 0.864 millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): 600 gallons per minute(GPM)at 199 feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length (feet) Material
8 10,040 C900
8 1,260 DIP
If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per
MDCPSFM Section 2.01 C.I.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other(please specify)
6. Power reliability in accordance with 13A NCAC 02T ,0305thk I):
® Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B)-
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day I SA NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 3 of 5
NC Dept of Environmental Quality
Apr 15 2024
IX. SETBACKS&SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)): Raleigh Regional Office
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(f)&(g,)? ®Yes [—]No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
2Water mains(vertical-water over sewer preferred,including in benched trenches) 18 inches
2Water mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
**Any private or public water supply source,including any wells,WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
**Waters classified WS(except WS-I or WS-V),B, SA,ORW,HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
**Any other stream,lake,impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(�)or(g),see Section X.1 of this application
*15A NCAC 02T.0305(a)contains alternatives where separations in 02T.0305(fl cannot be achieved.Please check"yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑No ❑N/A
➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ®Yes [—]No ❑N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ®Yes Basin name:Neuse ❑No
If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ®Yes ❑No
➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ®Yes ❑No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ®Yes ❑No
Per 15A NCAC 02T.0105(c)(6),directly related environmental permits or certification applications must be being prepared,
have been applied for,or have been obtained.Issuance of this permit is contingent on issuance of dependent permits(erosion
and sedimentation control plans,stormwater management plans,etc.).
7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑Yes ®No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes,include an attachment with details for each line,including type(aerial line,size,material,and location).
High priority lines shall be inspected by the permittee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit.
FORM:FTA 10-23 Page 4 of 5
X. CERTIFICATIONS:
I. Does the submitted system comply with ISA NCAC 02T,the Minimum Design Criteria for the Permittine of Pump Stations
11i_I 1 ,ir4.q�lains_flatej version), and the Gravity Sewer Minimum Design Criteria(latest version)as applicable?
®Yes ❑No
If no, for projects requiring a single variance, complete and submit the Variance Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit, and projects requiring a variance approval may be subject to Ionizer
review times.For prooects rgquiring two or more variances or where the variance is determined by the Division to be a
sienifjcant portion of the proiect,the full technical review is required.
2. Professional Engineer's Certification:
1, John F. Phillip P.E. attest that this application for Leesville Assemblage Pump Station& Forcemain
(Professional Engineer's name from Application Item 111.1.) (Project Name from Application Item II 1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers(latest version),and the Nlinimum Desivn Criteria for the Fast-Track_Permitting
of Pump Stations and Force Mains(latest version. Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation. Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board.(21 NCAC 56.0701)
,`%11 a tt,,,i4�
North Carolina Professional Engineers seal,signature,and date: �y CAROB t,
FOR PUMP STATION
DESIGN ONLY
EAL
1013
3. Applicant's Certification per 15A NCAC 02T.0106(b):
1, Donald F.Greeley Djrcctor ,attest that this application for Leesville Assemblage Pump Station&Forcernam
(Signature Authority Name from Application Item 13) (Protect Name from Application Item II 1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-2)5.6A and 143-215.f 13, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation.
Signature: ( Date: 2��3/Z
1---r
FORM: FTA 10-23 Page 5 of 5
X. CERTIFICATIONS:
. Does the submitted system comply with 15A NCAC 02T, the iVl:niniunl Deslbn Crltcrta for the Pernlltting of Purilll titatlon.;
and Force.Mains tlatcst version).and the Gravity Sewer Minimum Design Criteria(latest version)as applicable?
® Yes ❑ No
If no, for projects requiring a single variance, complete and submit the Variance,'Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the reuuest will be issued
concurrently with the approval of the ermit and ro'ects reguiring a variance approval may be subject to longer
review times. For prooects requiring two or more variances or where the variance is determined by-the Division to be a
significant portion of the proiect,the full technical review is required.
2. Professional Engineer's Certification:
1, Matthew Jones attest that this application for Leesville Road Assemb age Pump station and Forcemoin
(Professional Engineer's name from Application Item III I ) (Project Name from Application Item I1.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Mn1111Ttnn Deslign_.�'ritcria for Gravity Sewers(latest vymon),and the Minimum Design Criteria for the FasE.Track Permitting
of Pump Stations and Ford Mains(latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE In accordance with General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation. Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board. (21 NCAC 56,0701)
North Carolina Professional Engineer's seal,signature,and date: ��� C A RO
For Force Man
Design Only _ EA r
039 0
F4 G I VA �t4`'��
3. Applicant's Certification per 15A NCAC 02T ,0106(b):
1,DO Ai,D F, (XRf LFY. 1, R&ri1�attcst that this application for pVM P ,STA770V ANO FDR C—
(Signature Authority Name from Application Item 1.3.) (Project Name from Application Item 11 I) M�4!.✓-
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE In accordance with General Statutes 143-215.6A and 141-213 6R, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation
Signature: • ( Date: 2� Z1
FORM: FTA 10-23 Page 5 of 5
NC Dept of Environmental Quality
Apr 15 2024
Raleigh Regional OfficeI41
A I+
'¢d
RECEIVING SEWER �o
PERMITTED BY CITY OF
DURHAM
PERMIT NUMBER: S-001299
U
N
,y
DISCHARGE
ANHOLE
PUMP Qo
STATION �A
EASEMENT 3 0 Qa
I a
CL
PROJECT i FORCE I
SITE- - - - - - - i MAIN` W
i u
`tes,.F Ie Rd i m
4F
mow, �y�e� cnQRd C" ESTATES OF
HARRINGTON
Y GROVE
(pop��
a
DOWNS AT
HARRINGTON
GLEN AT GROVE
70 ��^ HARRINGTON
GROVE
^� PARK AT
NC Dept of Environmental Quality
Apr 15 2024
2043 �sFRaleigh Regiohal Offi e SOUTHEAST DURHAM QUADRANGLE
° C, NORTH CAROLINA
1909 7.5-MINUTE SERIES
y
C.. WELLWATER AVE �hJ - u -_dp0 _ - - hpJ
350 �—
_ .0
0 k Cr. h0 a 350
� _ v
h _ RECEIVING
JSD - SEWER
f o - 350 PERMITTED BY ,-
� CITY OF DURHAM
D PERMIT NUMBER:
_ z
,a
S-001299
ISCHAR E
D RD p HOL
A0°
o
ST T f
Q A NT r
A° a
E
IN.
450
LEESVILLE RD
c,
c
z ( _
TURNSTONE DR
A
v �' 1901
_� ` Jay, = RESTORgTo CARPENTER POND RD
90 \ O�SO r0� c 1907
O A
Cr r
r O�� 45°
�,.:• «FB �F StonebridgAOO e
Fs Lake
,� � •�• ono
ROSEDALE CREEK DR
Lynn i
FARM POND TRL c-
ysO
F \, 450 Crossroads RD
70 - �J
W 'Co. �—
o A j�E�, r✓"..
Cover Lefler
DATE: February 161h, 2024
TO: North Carolina Department of Environmental Quality
H O R VATH aiSn.:I:,TC Raleigh Regional Office-Water Quality Section
S
3800 Barrett Drive
Civil Engineers Raleigh, NC 27609
Plonners
.andscope Archltecis FROM: Matt Jones, PE
SUBJECT: Fast Track Sewer Application
Leesville Road Assemblage Pump Station
Leesville Road is a proposed 344-unit townhome development located on Leesville
Road in Durham, North Carolina.This application is for the installation of a pump
station and 11,300 feet of new force main to serve the development. The collection
system permit issued by the City of Durham accounts for the flow from this
development; the enclosed application for the pump station and force main
therefore requests zero flow. The following items have been included with the
application package:
• 1 Cover Letter
• 1 Original FTA
• 1 Copy of FTA
1 Check for$600.00
• 1 Copy of USGS Map
• 1 Copy of Aerial Location Map
North Carolina
16 Consultant Place,Suite 201
Durham,NC 27707
p 9 1 9-490-4990 f 919-490-8953
Tennessee
Post Office Box 970
Harrison,TN 37341
p 423-266-4990
From: Matt Jones
To: Wild,Elaine
Cc: John Phillips
Subject: [External] RE: Leesville Road Assemblage Pump Station and Force Main—Additional Information Request
Date: Monday,April 15,2024 2:18:50 PM
Attachments: imaae001.pno
imacie002.ma
Form FTA 10-23 for Leesville Assemblage Paae 2.pdf
Form FTA 10-23 for Leesville Assemblaoe Paae 4.odf
Updated Maps.pdf
CAUTION:External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Good Afternoon Elaine,
Thank you for meeting with John and I this morning to discuss your request for additional
information. I hope that with that discussion, the explanations provided below, and the
attachments to this email,we will have satisfactorily provided the additional information
required for you to issue this permit. Please let me know if you have any additional questions on
this application.
Thanks,
Matt Jones, PE
VP I Operations Manager
Qu n i ty 0001K.
16 CONSULTANT PLACE,SUITE 201
DURHAM, NORTH CAROLINA 27707
O (919) 490-4990 M (919) 906-0846
www.qunitlt.com
New brand,same leadership. Please note my new email address: miones@qunity.com
From: Wild, Elaine <elaine.wild(@deq.nc.gov>
Sent: Tuesday, April 9, 2024 3:54 PM
To: don.greeleyC@durhamnc.gov; John Phillips<ifphillips(@bellsouth.net>
Subject: Leesville Road Assemblage Pump Station and Force Main—Additional Information Request
Hello Donald and John,
After reviewing the Fast Track Sewer System Extension Application for the Leesville Road
Assemblage Pump Station and Force Main project, additional information is required in order to
further process the application. Please provide the following information by May 9, 2024, and note
that the requested information must be submitted within 30 days of this request, or the applicant
will be required to submit a new application and application fee in accordance with 15A NCAC 02T
.0107.
1. Is this an ARPA funded project? If so, please include the DWI assigned ARPA project number in
your response. This is not an ARPA funded project.
2. According to Section V.2. of the FTA, the downstream gravity sewer diameter is 12-inches.
Please provide the downstream sewer permit number associated with this 12-inch gravity
sewer. Downstream 12-inch gravity sewer has been permitted the City of Durham. Permit
Number 5-001299. Issuance date: 7/12/2023.
3. According to Section V1.8., this is a zero flow project. Please provide the following
information, which can be included in the narrative. City of Durham has issued a zero flow
permit for the 344-unit townhome development. They will not issue the permit allocating the
flow until the Pump Station and Force Main have been permitted. Once permit for the pump
station and force main are approved, a permit modification will be submitted to the City of
Durham to allocate the flow. A revised page 2 of the FTA has been attached to this email to
clarify that the flow has already been allocated to a gravity main permitted by the City of
Durham.
a. Detailed written justification for a dry line extension as to why the infrastructure
cannot wait to be built until closer to when it's actually needed or until closer to when
the future flow will be permitted (in 9 months).
b. Information regarding when the extension/permit mod to incorporate flow is expected
to be made, including what the expected design flow will be so we can verify that it is
sized correctly.
c. Details as to how the permittee will ensure that no one ties onto this line without a
permit, as well as how it will be valved off from the system to prevent any introduction
of wastewater.
cl. A digital copy of the design plans showing the dry line and its relationship to any other
sewers, as well as any valves/plugs per the comment above.
4. According to our records,there appears to be streams/wetlands along the western, northern,
and eastern sides of the project area. Does this project have any stream/wetland crossings or
other stream and/or wetland impacts? If so, what are the impacts and are they temporary or
permanent? The project does require 401/404 authorization for temporary impacts. The
wrong box was checked on the application by mistake. A corrected page 4 of the FTA is
attached to this email showing that 401/404 authorization is required. Both 401 and 404
Authorizations have already been obtained. The 401 Authorization has been issued as DWR#
20221521 (under certification number WQC005480). The 404 Authorization has been issued
as Action ID Number SAW-2019-02435 (under Nationwide Permit 58).
a. According to Section IX.S.,401/404 authorization is not needed for this project. Please
provide an explanation indicating why a separation requirement is not applicable to the
project since there are streams and/or wetlands along the western, northern, and
eastern sides of the project area.
5. According to Section X. of the FTA,there are two professional engineers associated with this
project. Please provide the contact information for Matthew Jones including license number,
firm, mailing address, phone number, and email address. The additional contact information
is:
a. Matthew Jones, PE
b. NC PE#039170
c. Firm: Qunity, PA
d. Firm NCBELS#: C-0676
e. Mailing Address: 16 Consultant Place, Suite 201, Durham. NC 27707
f. Phone Number: 919-490-4990
g. Email: mjones(@qunity.com
6. According to the topo and aerial maps, the proposed force main flows to a "discharge
manhole". Please provide additional details regarding this item. Is this a gravity sewer or
force main connection? What is the permit number associated with this connection point?
The "discharge manhole" shown on the maps represented the upstream manhole of the
downstream gravity receiving sewer. This gravity sewer has been permitted by the city of
Durham under permit number S-001299. The maps have been updated to show the
approximate location of the gravity sewer as well as the permit number to make it clear that
the forcemain will discharge to an existing permitted line.
7. According to the narrative, the flow for the 344-unit townhome development is already
allocated to the collection system and treatment facility. Please provide the permit number
associated with the town home development.
a. Additionally, Section V1.8. specified that the upstream flows will be permitted nine
months after the issuance of this proposed project, but the narrative states that the
flow is already allocated. Please provide clarification. Please see explanation for
comment#3 above.
15A NCAC 02T .0107 Staff Review and Permit Preparation states:
0 "(2) (e) If an application is accepted and later found to be incomplete, the applicant shall be
advised how the application or accompanying supporting information may be modified to
make it complete The staff shall advise the applicant:
(2) if all required information is not submitted within 30 days, the project will be
returned as incomplete. Any resubmittal of a returned application shall be accompanied
with a new application fee."
Please contact me with any questions that you may have regarding this request.
*Please note that the fee for fast track sewer extension permits has increased to$600 as of
October 3, 2023[as stipulated in the 2023 House Appropriations Act, House Bill 259, Water
Quality and Stormwater Fees,Section 12.14(a)].
Sincerely,
Elaine Wild
Environmental Engineer
Division of Water Resources - Raleigh Regional Office
North Carolina Department of Environmental Quality
919.791.4254 Office
elaine.wild(@deq.nc.gov
IkgJ/rmenl of(nnrMmenlY UW1iy
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Sewer Extension Permitting I NC DEQ
subchapter t rules.pdf(state.nc.us)
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.