Loading...
HomeMy WebLinkAbout20240250 Ver 1_More Info Received_20240417Baker, Caroline D From: Allison Keith <AKeith@axiomenvironmental.org> Sent: Wednesday, April 17, 2024 4:16 PM To: Wooten, Samantha Cc: Chiles, George; Scott Davis; Dunn, Maria T.; Scarbraugh, Anthony D CIV USARMY CESAW (USA) Subject: [External] RE: Hurricane Florence Damage (DWR #20240250) SAW-2020-01704 Additional Information Requested Attachments: JSC_SWIT forms_JSC-NWW-8i_3p_1Oil 9i.pdf Follow Up Flag: Follow up Flag Status: Flagged IYou don't often get email from akeith@axiomenvironmental.org. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Samantha, Thank you for reaching out in regards to the permit application for the Jack Smith Creek Drainage Basin. We are following the NCDWR Guidelines for Hurricane / Tornado Cleanup in Riparian Buffers dated August 5, 2020 and a conversation with Robert Tankard on November 1, 2023. It is our understanding that the removal of dangerous, dead and damaged trees is an exempt activity, applicable to several sites. I have commented on your questions below in blue. • The site plans appear to not include a final revegetation plan for impacts. It appears that some of the temporary road access points will lay over trees and vegetation in the buffered areas. DWR is concerned about the removal of those trees in the buffered areas. Please provide a revegetation plan. Within the "General Construction and Geotechnical Notes" section on page 2 of the Repair Plans is a section titled PERMANENT SEEDING SCHEDULE FOR AREAS OTHER THAN CHANNELS, describing the general sequence and herb species to be used for revegetating areas impacted by construction, however, this does not include tree species. On sheet C4.2 of the Repair Plans, ESC Details notes that revegetation will occur after removal of the temporary access road: When the contributing drainage area has been stabilized, fill depression, and establish final grading elevation, compact area properly, and stabilize with ground cover. Specific site comments: ■ Site 1-16A • This site has no existing trees. The Site is a residential lawn and will be revegetated immediately after construction. ■ Site 1-16B This site has no existing trees. The Site is a residential lawn and will be revegetated immediately after construction. 0 Site 1-17 • A majority of the access road for this site occurs on an existing residential driveway and while the entire access road is >2500 square feet, this site is a maintained yard and includes a few individual trees. Permanent impacts to the buffer fall well short of 2500 square feet. Minimal impacts from access will occur within the vegetated area of the buffer and one tree at the upper end of the project area (a 16" sweetgum) may be removed in order to perform the proposed outlet protection replacement. However, after speaking with the project engineer, there is potentially ample space for construction equipment to maneuver and it is anticipated that this tree will be avoided. Project plans state all mature trees will be avoided at the best necessary. However, in the case that it cannot be avoided, any general guidance on the size, species, and planting density requirements for the replacement of trees (in this case, tree) in the buffer would be appreciated, and we will update the impact drawing for this site appropriately. ■ Site1-20 • The only impact to trees as part of this work is the removal of two uprooted and dead trees from Hurricane Florence. We do not propose to remove any healthy trees within Zone 1. The Site will be revegetated immediately after construction. ■ Site 1-42B • No trees present at this location. The Site will be revegetated immediately after construction. ■ Site 1-43B • The only impact to trees as part of this work is the removal of undermined and uprooted trees damaged by Hurricane Florence. We do not propose to remove any healthy trees within Zone 1. The Site will be revegetated immediately after construction. • DWR appreciates being provided most of the stream and wetland forms for the impact areas. For documentation in our permanent records, could you provide the stream forms for JSC-NWW-10i, JSC-NWW-3p, JSC-NWW-19i, and JSC-NWW-8i? I apologize as it appears these forms were not included with the PJD package. Please see attached. We hope to discuss these items with you at your convenience and look forward to talking with you soon. Thank you, Allison Allison Keith Axiom Environmental, Inc. 218 Snow Avenue Raleigh, NC 27603 Cell (423)400-8882 akeith(@axiomenvironmental.o From: Wooten, Samantha <samantha.wooten@deg.nc.gov> Sent: Friday, April 12, 2024 2:53 PM To: Chiles, George <chilesg@newbernnc.gov> Cc: Scott Davis<sdavis@axiomenvironmental.org>; anthony.d.scarbraugh@usace.army.mil; Dunn, Maria T. <maria.dunn@ncwiIdIife.org> Subject: Hurricane Florence Damage (DWR #20240250) SAW-2020-01704 Additional Information Requested You don't often get email from samantha.wooten@deq.nc.gov. Learn why this is important Hi all, DWR has completed an initial review of the above noted application and requires additional information to continue our review. Please provide the following information within 30 days of this email. Please note that the application will be considered "on hold" until receipt of all the requested information. The site plans appear to not include a final revegetation plan for impacts. It appears that some of the temporary road access points will lay over trees and vegetation in the buffered areas. DWR is concerned about the removal of those trees in the buffered areas. Please provide a revegetation plan. DWR appreciates being provided most of the stream and wetland forms for the impact areas. For documentation in our permanent records, could you provide the stream forms for JSC-NWW-10i, JSC-NWW-3p, JSC-NWW-19i, and JSC-NWW-8i? Thank you! Samantha Wooten (She/Her/Hers) 401 & Buffer Coordinator Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 707-3631 l Cell: (919) 817-7926 samantha.wooten@deg.nc.gov DEto,/) NORTH CAROLINA Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.